RefusedCouncil status: The decision has been made on the application.

Alterations to the roof form including removal of the hipped roof over the existing two-storey side addition and formation of a gable end to the main roof; erection of a first floor rear extension; alterations to the existing single-storey rear extension roof and associated fenestration changes to side and rear elevations; formation of a small roof terrace; and replacement front entrance canopy.

47 Lowther Road Barnes London SW13 9NT

London Borough of Richmond upon ThamesReference PA26/2598Householder Application

Last published check: 3 Oct 2026, 11:13. Check the council record for more recent changes.

Status and dates

Last published check: 3 Oct 2026, 11:13 (UK)

  1. DoneReceived27 Jul 2026
  2. DoneValidated29 Jul 2026
  3. ClosedConsultationEnded 19 Aug 2026
  4. Date set by councilTarget decision date21 Sept 2026
  5. DecidedRefused Permission3 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Householder Application
Ward
Barnes Ward [BRN]
Documents
29 published

Proposal

Alterations to the roof form including removal of the hipped roof over the existing two-storey side addition and formation of a gable end to the main roof; erection of a first floor rear extension; alterations to the existing single-storey rear extension roof and associated fenestration changes to side and rear elevations; formation of a small roof terrace; and replacement front entrance canopy.

Reference
PA26/2598
Alternative references
PP-15082780
Ward
Barnes Ward [BRN]
Agent
Horvath
UPRN
100022295340

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form - Without Personal DataApplication Form - Redacted24 Jul 2026View
  • LOCATION PLANSubmitted Drawing24 Jul 2026View
  • BIODIVERSITY NET GAIN STATEMENTReport24 Jul 2026View
  • CIL FORMApplication Form24 Jul 2026View
  • FIRE PLANNING STRATEGY STATEMENTReport24 Jul 2026View
  • FLOOD RISK ASSESSMENTReport24 Jul 2026View
  • DESIGN & ACCESS STATEMENTReport24 Jul 2026View
  • PROPOSED BLOCK SITE PLANSubmitted Drawing27 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Refused Permission
Decision
Planning conditions
  1. The proposed roof alterations and first floor rear extension, by reason of their scale, mass, design and relation to the neighbouring dwelling, would represent an incongruous form of development that which will negatively impact the character and appearance of the host property and streetscape. As such, the proposal would be contrary to the NPPF, the House Extensions and External Alterations SPD and the Local Plan policy 28.
  2. The proposed first floor rear balcony, by reason of its siting and relationship to the neighbouring properties, would result in an unacceptable loss of privacy to the detriment of the amenities enjoyed by the occupants of surrounding neighbouring properties. The proposal is therefore contrary to, in particular, Policy 46 of the Local Plan.
  3. For the avoidance of doubt the Drawing Nos to which this decision refers are as follows:- Drawing No. 100; 101; 102; 303 existing loft floor plan; 104; 105; 106; 107; 108; 300; 301; 302; 303 proposed loft floor plan; 304; 305; 306; 307; 308; 309; received the 27th July 2026 and Location Plan received the 24th July 2026. Fire Strategy Statement, Flood Risk Assessment and BNG Statement received 24th July 2026.
  4. In accordance with section DM3 of the National Planning Policy Framework, Richmond upon Thames Borough Council takes a positive and proactive approach to the delivery of sustainable development, by: * Providing a formal pre-application service * Providing written policies and guidance, all of which is available to view on the Council's website * Where appropriate, negotiating amendments to secure a positive decision * Determining applications in a timely manner. In this instance: * The applicants did not seek formal pre-application advice, and the scheme was found to be contrary to policy and guidance, and subsequently refused. The Council is ready to enter into discussions, through the Council's formal pre-application service, to advise the applicants of relevant policy and guidance; and where possible assist in the preparation of a new planning permission. More information on the pre-application service and relevant fees can be found online at www.richmond.gov.uk/pre-application_for_developers.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.