Council planning record

Construction of a first-floor rear extension over part of the existing single-storey rear extension, together with associated external alterations at the rear of the building, including remodelling of roof lights, a new concealed air-conditioning condenser unit and introduction of a semi-intensive green roof on the existing ground floor extension.

95, Sheen Road, Richmond, TW9 1YJ

The decision has been made on the application.Reference: PA26/2596London Borough of Richmond upon Thames

Last published check: 3 Oct 2026, 05:57. Check the council record for more recent changes.

Application location

95, Sheen Road, Richmond, TW9 1YJ

This record has no verified map location.

Application summary

Status
The decision has been made on the application.
Application type
Full Application
Received
24 Jul 2026
Validated
4 Aug 2026
Determination deadline
28 Sept 2026
Local authority
London Borough of Richmond upon Thames

Application overview

Construction of a first-floor rear extension over part of the existing single-storey rear extension, together with associated external alterations at the rear of the building, including remodelling of roof lights, a new concealed air-conditioning condenser unit and introduction of a semi-intensive green roof on the existing ground floor extension.

Proposal details

Reference
PA26/2596
Alternative references
PP-15108822
Ward
South Richmond Ward [STR]
Agent
Micanovic
UPRN
100023409282

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted24 Jul 2026View
Location PlanReport24 Jul 2026View
Site PlanSubmitted Drawing24 Jul 2026View
Heating and Cooling LeafletPublication24 Jul 2026View
Design and access statementReport24 Jul 2026View
Covering letterCorrespondence24 Jul 2026View
Heritage statementReport24 Jul 2026View
Existing Basement and Ground Floor Plan 436.A.011Submitted Drawing27 Jul 2026View
Existing First Floor Plan 436.A.012Submitted Drawing27 Jul 2026View
Existing Roof Plan 436.A.013Submitted Drawing27 Jul 2026View
Existing Rear Elevation and Section A-A 436.A.021Submitted Drawing27 Jul 2026View
Existing Side Elevation and Section B-B 436.A.022Submitted Drawing27 Jul 2026View
Proposed Ground Floor Plan 436.A.111Submitted Drawing27 Jul 2026View
Proposed First Floor Plan 436.A.112Submitted Drawing27 Jul 2026View
Proposed Roof Plan 436.A.113Submitted Drawing27 Jul 2026View
Proposed Rear Elevation and Section A-A 436.A.121Submitted Drawing27 Jul 2026View
Proposed Elevation and Section B-B 436.A.122Submitted Drawing27 Jul 2026View
cilReport4 Aug 2026View
Officer ReportReport14 Sept 2026View
decisionDecision Notice14 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refused Permission
decision
Planning conditions
  1. You are required to complete the Community Infrastructure Levy form (CIL) Please find the link below to the form and additional information guidance. http://www.planningportal.gov.uk/uploads/1app/forms/cil_questions.pdf http://www.planningportal.gov.uk/uploads/1app/cil_guidance.pdf
  2. The proposed first floor rear extension, by reason of its siting, scale and design, would represent an overly dominant and incongruous form of development that would erode the original appearance of the host property. The scheme would fail to preserve the setting or special interest of the listed building and cause less than substantial harm to the CA31 Sheen Road Richmond Conservation Area of which it forms part, and there are considered to be no public benefits to outweigh this harm. As such, the proposal would be contrary to the NPPF, the House Extensions and External Alterations SPD and the Local Plan policies 28 & 29, as supported by the CA31 Sheen Road Richmond Conservation Area Statement and study.
  3. In the absence of a fire safety strategy/Reasonable Exception Statement detailing the developments approach to fire safety risk, the scheme has failed to demonstrate that it would not have an adverse impact on the safety of future occupants in the event of a fire and is therefore contrary to the aims and objectives of Policy D12(A) of the London Plan (2021) and policy 44 of the Local Plan.
  4. For the avoidance of doubt the Drawing(s) No(s) and Document(s) to which this decision refers are as follows:- 436.A.011; 436.A.012; 436.A.013; 436.A.021; 436.A.022; 436.A.111; 436.A.112; 436.A.113; 436.A.121; 436.A.122; received the 27th July 2026 and Location Plan received the 24th July 2026.
  5. In accordance with section DM3 of the National Planning Policy Framework, Richmond upon Thames Borough Council takes a positive and proactive approach to the delivery of sustainable development, by: * Providing a formal pre-application service * Providing written policies and guidance, all of which is available to view on the Council's website * Where appropriate, negotiating amendments to secure a positive decision * Determining applications in a timely manner. In this instance: * The applicants did seek formal pre-application advice, however, the Council's recommendations for amendments were not followed, and the scheme was found to be contrary to policy and guidance, and therefore the application was subsequently refused. The Council is ready to enter into discussions, through the Council's formal pre-application service, to advise the applicants of relevant policy and guidance; and where possible assist in the preparation of a new planning permission. More information on the pre-application service and relevant fees can be found online at www.richmond.gov.uk/pre-application_for_developers.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.