Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
37, Cambridge Cottage, Kew Green, Kew, Richmond, TW9 3AA
Last published check: 30 Sept 2026, 06:21. Check the council record for more recent changes.
37, Cambridge Cottage, Kew Green, Kew, Richmond, TW9 3AA
This record has no verified map location.
Internal and external refurbishment works including repairs to the historic fabric, accessibility improvements, replacement and upgrading of building services, structural repairs, conservation works to the external envelope including roof repairs, repair of the boundary walls, installation of heat pumps, and associated works
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Application for Planning Permission - REDACTEDApplication Form | Not published | View |
| DESIGN, ACCESS AND HERITAGE STATEMENTReport | 10 Jul 2026 | View |
| DESIGN, ACCESS AND HERITAGE STATEMENTReport | Not published | View |
| DESIGN, ACCESS AND HERITAGE STATEMENTReport | 10 Jul 2026 | View |
| Design, Access and Heritage StatementReport | Not published | View |
| Design, Access and Heritage StatementReport | 10 Jul 2026 | View |
| Design, Access and Heritage StatementReport | Not published | View |
| Design, Access and Heritage StatementReport | 10 Jul 2026 | View |
| Design, Access and Heritage StatementReport | Not published | View |
| Floor Detail Thermal ImprovementSubmitted Drawing | 10 Jul 2026 | View |
| Roof Detail - S03 Office Thermal Improvements As ProposedSubmitted Drawing | Not published | View |
| G02 Stair Lift Detail As ProposedSubmitted Drawing | Not published | View |
| Porte-cochere railing DetailsSubmitted Drawing | Not published | View |
| Juliette Balcolny railing DetailsSubmitted Drawing | Not published | View |
| Proposed Basement Floor PlansSubmitted Drawing | Not published | View |
| Proposed Basement SectionsSubmitted Drawing | Not published | View |
| As Proposed Ground Floor and Basement Plan Preferred SchemeSubmitted Drawing | 10 Jul 2026 | View |
| Ground Floor and Basement Plan - As ProposedSubmitted Drawing | Not published | View |
| Ground Floor and Basement Plan DemolitionSubmitted Drawing | 10 Jul 2026 | View |
| Demolition Ground Floor and Basement PlanSubmitted Drawing | Not published | View |
| First Floor Plan As ProposedSubmitted Drawing | Not published | View |
| Second Floor Plan As ProposedSubmitted Drawing | Not published | View |
| G01 Entrance Hall As Proposed Internal ElevationsSubmitted Drawing | 10 Jul 2026 | View |
| G02 Reception / Lounge Demolition Internal ElevationsSubmitted Drawing | 10 Jul 2026 | View |
| G02 Reception / Lounge As Proposed Internal ElevationsSubmitted Drawing | 10 Jul 2026 | View |
| G03 Corridoor DemolitionSubmitted Drawing | Not published | View |
| G03 Corridoor As Proposed Internal ElevationsSubmitted Drawing | Not published | View |
| G05 Stair As ProposedSubmitted Drawing | Not published | View |
| G07 Event Space As Proposed Floor PlanSubmitted Drawing | Not published | View |
| G07 Event Space As Proposed Reflected Ceiling PlanSubmitted Drawing | Not published | View |
| G07 Event Space As Proposed Internal ElevationsSubmitted Drawing | Not published | View |
| G08 Event Space As Proposed Floor PlanSubmitted Drawing | Not published | View |
| G08 Event Space As Proposed Reflected Ceiling PlanSubmitted Drawing | Not published | View |
| G07 Event Space As Proposed Internal ElevationsSubmitted Drawing | Not published | View |
| G08 Event SPace As Proposed Internal ElevationsSubmitted Drawing | Not published | View |
| G09 Hallway As Proposed Internal ElevationsSubmitted Drawing | Not published | View |
| G11 Stairs/ G12 Female WC Demolition 1 Internal ElevationsSubmitted Drawing | Not published | View |
| G11 Stairs/ G12 Female WC Demolition 2 Internal ElevationsSubmitted Drawing | Not published | View |
| G11 Stairs/ G12 Female WC As Proposed 1 Internal ElevationsSubmitted Drawing | Not published | View |
| G11 Stairs/ G12 Female WC As Proposed 2 Internal ElevationsSubmitted Drawing | Not published | View |
| G13 Corridoor As Proposed Floor Plan and Reflected Ceiling Plan Internal ElevationsSubmitted Drawing | Not published | View |
| G14 Meeting Room As Proposed Floor Plan and Reflected Ceiling Plan Internal ElevationsSubmitted Drawing | Not published | View |
| G15 Kitchen Internal Elevations As ProposedSubmitted Drawing | 10 Jul 2026 | View |
| G17 Male WC / G18 Accessible WC Internal Elevations DemolitionSubmitted Drawing | 10 Jul 2026 | View |
| G17 Male WC / G18 Accessible WC Internal Elevations As ProposedSubmitted Drawing | 10 Jul 2026 | View |
| G17 Male WC / G18 Accessible WC Internal Elevations As ProposedSubmitted Drawing | 10 Jul 2026 | View |
| Proposed Replacement Door DetailsSubmitted Drawing | Not published | View |
| Proposed Outbuilding Roof DetailsSubmitted Drawing | Not published | View |
| CLEWS ARCHITECTSReport | 10 Jul 2026 | View |
| Location PlanSubmitted Drawing | 10 Jul 2026 | View |
| Ground Floor and Basement Plan As ExistingSubmitted Drawing | 10 Jul 2026 | View |
| First Floor Plan As ExistingSubmitted Drawing | 10 Jul 2026 | View |
| Second Floor Plan As ExistingSubmitted Drawing | Not published | View |
| Roof Plan As ExistingSubmitted Drawing | Not published | View |
| External Elevations As Existing Sheet 1Submitted Drawing | Not published | View |
| External Elevations As Existing Sheet 2Submitted Drawing | Not published | View |
| G01 Entrance Hall As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G02 Reception / Lounge As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G03 Corridoor As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G05 Stair As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G07 Event Space As Existing Floor PlanSubmitted Drawing | Not published | View |
| G07 Event Space As Existing Reflected Ceiling PlanSubmitted Drawing | Not published | View |
| G07 Event Space As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G08 Event Space As Existing Floor PlanSubmitted Drawing | Not published | View |
| G08 Event Space As Existing Internal ElevationsSubmitted Drawing | 10 Jul 2026 | View |
| G08 Event Space As Existing Internal ElevationsSubmitted Drawing | 10 Jul 2026 | View |
| G09 Hallway As Existing Internal ElevationsSubmitted Drawing | 10 Jul 2026 | View |
| G11 Stairs As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G12 Female WC As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G15 Kitchen As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| G17 Male WC As Existing Internal ElevationsSubmitted Drawing | Not published | View |
| STRUCTURAL ITEMSReport | 10 Jul 2026 | View |
| CONDITION SURVEY: DRAWING KEYSubmitted Drawing | Not published | View |
| CONDITION SYRVEY: ENTRANCE HALL As ExistingSubmitted Drawing | 10 Jul 2026 | View |
| CONDITION SYRVEY: COURT As ExistingSubmitted Drawing | 10 Jul 2026 | View |
| CONDITION SYRVEY: COURT As ExistingSubmitted Drawing | 10 Jul 2026 | View |
| CONDITION SYRVEY: BOUNDARY WALL FACING GREEN Photographic DetailsSubmitted Drawing | 10 Jul 2026 | View |
| CONDITION SYRVEY: BOUNDARY WALL FACING GREEN Photographic DetailsSubmitted Drawing | Not published | View |
| WINDOWSubmitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN NORTH ELEVATION As Existing 2Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN NORTH ELEVATION As Existing 3Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN NORTH ELEVATION As Existing 4Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN NORTH ELEVATION as Existing 5Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN NORTH ELEVATION as Existing 6Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN NORTH ELEVATION as Existing 7Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN EAST ELEVATION as ExistingSubmitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN EAST ELEVATION as Existing 2Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN EAST ELEVATION as Existing 3Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN EAST ELEVATION as Existing 4Submitted Drawing | 10 Jul 2026 | View |
| CONDITION SURVEY: MAIN EAST ELEVATION As Existing 3Submitted Drawing | Not published | View |
| CONDITION SYRVEY: MAIN EAST ELEVATION As Existing 4Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 1Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 2Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 3Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 4Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 5Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 6Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 7Submitted Drawing | Not published | View |
| CONDITION SURVEY: MAIN SOUTH ELEVATION As Existing 8Submitted Drawing | Not published | View |
| CONDITION SYRVEY: MAIN WEST ELEVATION As Existing 1Submitted Drawing | Not published | View |
| Site/Block Plan - ExistingSubmitted Drawing | 10 Jul 2026 | View |
| HERITAGE STATEMENTReport | 10 Jul 2026 | View |
| TYPICAL FRENCH DOOR DETAILS - PLANSubmitted Drawing | Not published | View |
| TYPICAL FRENCH DOOR DETAILS - CROSS SECTIONSubmitted Drawing | Not published | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILSSubmitted Drawing | Not published | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILS 2Submitted Drawing | Not published | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILS 3Submitted Drawing | Not published | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILS 4Submitted Drawing | Not published | View |
| TYPICAL CURVED FRENCH DOOR DETAILS - VENTING LITESubmitted Drawing | Not published | View |
| TYPICAL CURVED FRENCH DOOR PHOTOGRAPHIC DETAILSSubmitted Drawing | Not published | View |
| TYPICAL CURVED FRENCH DOOR PHOTOGRAPHIC DETAILSSubmitted Drawing | Not published | View |
| Door ScheduleReport | 10 Jul 2026 | View |
| MARTIN ASHLEY ARCHITECTSReport | Not published | View |
| TYPICAL METHOD FOR DROUGHT- STRIPPING WINDOWSReport | 10 Jul 2026 | View |
| Window ScheduleReport | 10 Jul 2026 | View |
| Window Schedule - Rev. AReport | Not published | View |
| ROOF PLAN EXISTINGSubmitted Drawing | Not published | View |
| ROOF 3D MODEL EXISTINGSubmitted Drawing | Not published | View |
| ROOF PLANS COPING STONES PROPOSEDSubmitted Drawing | Not published | View |
| PITCHED VALLEY GUTTER DETAIL As ProposedSubmitted Drawing | Not published | View |
| RENDER BEAD DETAIL As ProposedSubmitted Drawing | 10 Jul 2026 | View |
| SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBY As Existing / ProposedSubmitted Drawing | 10 Jul 2026 | View |
| SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBY As ProposedSubmitted Drawing | 10 Jul 2026 | View |
| SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBY As ProposedSubmitted Drawing | 10 Jul 2026 | View |
| ELECTRICAL SYMBOLS LEGENDSubmitted Drawing | 10 Jul 2026 | View |
| GROUND FLOOR PROPOSED PRINCIPAL ROUTES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| FIRST FLOOR PROPOSED PRINCIPAL ROUTES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| SECOND FLOOR PROPOSED PRINCIPAL ROUTES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| BASEMENT PROPOSED ELECTRICAL SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| GROUND FLOOR PROPOSED LIGHTING AND FIRE ALARM LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| FIRST FLOOR PROPOSED PRINCIPAL ROUTES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| SECOND FLOOR PROPOSED LIGHTING AND FIRE ALARM LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| GROUND FLOOR PROPOSED SMALL POWER AND ANCILLARY SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| FIRST FLOOR PROPOSED SMALL POWER AND ANCILLARY SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| SECOND FLOOR PROPOSED SMALL POWER AND ANCILLARY SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| MECHANICAL SYMBOLS LEGENDSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED LTHW PLANT SCHEMATICSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED BOILER ROOM AND STORE PLANTROOM MECHANICAL SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED DOMESTIC HOT & COLD WATER SCHEMATICSubmitted Drawing | 10 Jul 2026 | View |
| GROUND FLOOR PROPOSED HEATING LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| FIRST FLOOR PROPOSED HEATING LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| SECOND FLOOR PROPOSED HEATING LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| GROUND FLOOR PROPOSED VENTILATION & ABOVE GROUND DRAINAGE LAYOUT & ISOMETRICSSubmitted Drawing | 10 Jul 2026 | View |
| FIRST FLOOR PROPOSED VENTILATION & ABOVE GROUND DRAINAGE LAYOUT & ISOMETRICSSubmitted Drawing | 10 Jul 2026 | View |
| SECOND FLOOR PROPOSED VENTILATION & ABOVE GROUND DRAINAGE LAYOUT & ISOMETRICSSubmitted Drawing | 10 Jul 2026 | View |
| GROUND FLOOR PROPOSED DOMESTIC HOT AN COLD WATER SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| FIRST AND SECOND FLOOR PROPOSED DOMESTIC HOT AN COLD WATER SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING GROUND FLOOR PROPOSED STRIP OUTSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING FIRST FLOOR PROPOSED STRIP OUTSubmitted Drawing | 10 Jul 2026 | View |
| SECOND FLOOR PROPOSED STRIP OUTSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED REPAIRS STRUCTURAL DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| BOILER ROOM STRUCTURAL DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| ELEVATION REPAIRS STRUCTURAL DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| DRAINAGE LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| REFURBISHMENT ASBESTOS SURVEYReport | 10 Jul 2026 | View |
| Royal Botanic Gardens, Kew – PID TestingCorrespondence | 10 Jul 2026 | View |
| Kitchen Extract System Assessment and Supplementary AdviceReport | 10 Jul 2026 | View |
| Acoustic Consultancy ReportReport | 10 Jul 2026 | View |
| Rationale and Guide to Paint Colours on the Exterior and InteriorReport | 10 Jul 2026 | View |
| Reasonable Exception StatementReport | 10 Jul 2026 | View |
| Covering letterCorrespondence | 10 Jul 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.