Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
37, Cambridge Cottage, Kew Green, Kew, Richmond, TW9 3AA
Last published check: 30 Sept 2026, 06:34. Check the council record for more recent changes.
37, Cambridge Cottage, Kew Green, Kew, Richmond, TW9 3AA
This record has no verified map location.
Internal and external refurbishment works including repairs to the historic fabric, accessibility improvements, replacement building services, structural repairs, conservation works to the external envelope including roof repairs, repair of the boundary walls and installation of heat pumps.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| DESIGN, ACCESS & HERITAGE STATEMENT PT 1Report | 10 Jul 2026 | View |
| DESIGN, ACCESS & HERITAGE STATEMENT PT 2Report | 10 Jul 2026 | View |
| DESIGN, ACCESS & HERITAGE STATEMENT PT 3Report | 10 Jul 2026 | View |
| DESIGN, ACCESS & HERITAGE STATEMENT PT 4Report | 10 Jul 2026 | View |
| THERMAL IMPROVEMENT FLOOR DETAILDetail Drawing | 10 Jul 2026 | View |
| PROPOSED THERMAN IMPROVEMENTS ROOF DETAIL - S03 OFFICEDetail Drawing | 10 Jul 2026 | View |
| PROPOSED G02 STAIR LIFT DETAILDetail Drawing | 10 Jul 2026 | View |
| PORTE-COCHERE RAILING DETAILSDetail Drawing | 10 Jul 2026 | View |
| JULIETTE BALCONY RAILING DETAILSDetail Drawing | 10 Jul 2026 | View |
| PROPOSED BASEMENT FLOOR PLANSDetail Drawing | 10 Jul 2026 | View |
| PROPOSED BASEMENT SECTIONSDetail Drawing | 10 Jul 2026 | View |
| PROPOSED GROUND FLOOR & BASEMENT PLAN - PREFERRED SCHEMESubmitted Drawing | 10 Jul 2026 | View |
| DEMOLITION GROUND FLOOR & BASEMENT PLANSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED FIRST FLOOR PLAN - PREFERRED SCHEMESubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED SECOND FLOOR PLAN - PREFERRED SCHEMESubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED EXTERNAL ELEVATIONS - AIR SOURCE HEAT PUMPSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G01 ENTRANCE HALL - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| DEMOLITION G02 RECEPTION/LOUNGE - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G02 RECEPTION/LOUNGE - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| DEMOLTION G03 CORRIDOR - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G03 CORRIDOR - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G05 STAIR - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G07 EVENT SPACE - FLOOR PLANSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G07 EVENT SPACE - REFLECTED CEILING PLANSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G07 EVENT SPACE - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G08 EVENT SPACE - FLOOR PLANSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G08 EVENT SPACE - REFLECTED CEILING PLANSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G07 EVENT SPACE - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G08 EVENT SPACE - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G09 HALLWAY - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| DEMOLITION 1 G11 STAIRS/G12 FEMALE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| DEMOLITION 2 G11 STAIRS/G12 FEMALE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED 1 G11 STAIRS/G12 FEMALE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED 2 G11 STAIRS/G12 FEMALE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G13 CORRIDOR - FLOOR PLAN & REFLECTED CEILING PLAN - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G14 MEETING ROOM - FLOOR PLAN & REFLECTED CEILING - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| DEMOLITION G15 KITCHEN - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G15 KITCHEN - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| DEMOLITION G17 MALE WC / G18 ACCESSIBLE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G17 MALE WC / G18 ACCESSIBLE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED G17 MALE WC/ G18 ACCESSIBLE WC - INERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED REPLACEMENT - DOOR DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED OUTBUILDING - ROOF DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| LOCATION PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING GROUND FLOOR & BASEMENT PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING FIRST FLOOR PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING SECOND FLOOR PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING ROOF PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING EXTERNAL ELEVATIONS SHEET 1Submitted Drawing | 10 Jul 2026 | View |
| EXISTING EXTERNAL ELEVATIONS SHEET 2Submitted Drawing | 10 Jul 2026 | View |
| EXISTING G01 ENTRANCE HALL - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G02 RECEPTION/LOUNGE - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G03 CORRIDOR - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G05 STAIR - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G07 EVENT SPACE - FLOOR PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G07 EVENT SPACE - REFLECTED CEILING PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G07 EVENT SPACE - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G08 EVENT SPACE - FLOOR PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G08 EVENT SPACE - REFLECTED CEILING PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G08 EVENT SPACE - INTERNAL ELEVATIONS 1Submitted Drawing | 10 Jul 2026 | View |
| EXISTING G08 EVENT SPACE - INTERNAL ELEVATIONS 2Submitted Drawing | 10 Jul 2026 | View |
| EXISTING G09 HALLWAY - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G11 STAIRS - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G12 FEMALE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G15 KITCHEN - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING G17 MALE WC - INTERNAL ELEVATIONSSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: ENTRANCE HALLSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: COURTSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: COURT 2Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATIONSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATION 2Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATION 3Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATION 4Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATION 5Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATION 6Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATION 7Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATION 8Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN NORTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATIONSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATION 2Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATION 3Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATION 4Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATION 5Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN EAST ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATION 2Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATION 3Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATION 4Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATION 5Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATION 6Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATION 7Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATION 8Submitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN SOUTH ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING CONIDTION SURVEY: MAIN WEST ELEVATIONSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING CONDITION SURVEY: MAIN WEST ELEVATIONSubmitted Drawing | Not published | View |
| EXISTING BLOCK PLANSubmitted Drawing | 10 Jul 2026 | View |
| HERITAGE STATEMENTReport | 10 Jul 2026 | View |
| TYPICAL FRENCH DOOR DETAILS - PLAN AS SURVEYED/PROPOSEDSubmitted Drawing | 10 Jul 2026 | View |
| TYPICAL FRENCH DOOR DETAILS - CROSS SECTION AS SURVEYED/PROPOSEDSubmitted Drawing | 10 Jul 2026 | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILS AS SURVEYED 1Submitted Drawing | 10 Jul 2026 | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILS AS SURVEYED 2Submitted Drawing | 10 Jul 2026 | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILS AS SURVEYED 3Submitted Drawing | 10 Jul 2026 | View |
| TYPICAL FRENCH DOOR PHOTOGRAPHIC DETAILS AS SURVEYED 4Submitted Drawing | 10 Jul 2026 | View |
| TYPICAL CURVED FRENCH DOOR DETAILS - VENTING LITE AS SURVEYED/PROPOSEDSubmitted Drawing | 10 Jul 2026 | View |
| TYPICAL CURVED FRENCH DOOR DETAILS - VENTING LITE AS SURVEYED/PROPOSEDDetail Drawing | Not published | View |
| TYPICAL CURVED FRENCH DOOR PHOTOGRAPHIC DETAILS AS SURVEYEDSubmitted Drawing | 10 Jul 2026 | View |
| TYPICAL CURVED FRENCH DOOR PHOTOGRAPHIC DETAILS AS SURVEYED 2Submitted Drawing | 10 Jul 2026 | View |
| TYPICAL CURVED FRENCH DOOR PHOTO DETAILS AS SURVEYED 2Photographs | Not published | View |
| DOOR SCHEDULEReport | Not published | View |
| TYPICAL METHOD FOR DROUGHT - STRIPPING WINDOWSReport | 10 Jul 2026 | View |
| WINDOW SCHEDULE - REV AReport | 10 Jul 2026 | View |
| EXISTING ROOF PLANSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING ROOF 3D MODELSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED ROOF PLAN COPING STONESSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED PITCHED VALLEY GUTTER DETAILSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED RENDER BEAD DETAILSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING/PROPOSED SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBYSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING/PROPOSED SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBYSubmitted Drawing | Not published | View |
| PROPOSED SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBYSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBYSubmitted Drawing | Not published | View |
| PROPOSED SECONDARY ROOF - R21 GARDEN ENTRANCE LOBBYSubmitted Drawing | 10 Jul 2026 | View |
| ELECTRICAL SYMBOLS LEGENDReport | 10 Jul 2026 | View |
| PROPOSED PRINCIPAL ROUTES LAYOUT - GROUND FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED GROUND FLOOR PRINCIPAL ROUTES LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED PRINCIPAL ROUTES LAYOUT - FIRST FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED FIRST FLOOR PRINCIPAL ROUTES LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED PRINCIPAL ROUTES LAYOUT - SECOND FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED SECOND FLOOR PRINCIPAL ROUTES LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED PRINCIPAL ROUTES LAYOUT - BASEMENTSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED BASEMENT ELECTRICAL SERVICES LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED LIGHTING & FIRE ALARM LAYOUT - GROUND FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED GROUND FLOOR LIGHTING & FIRE ALARM LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED LIGHTING & FIRE ALARM LAYOUT - FIRST FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED LIGHTING & FIRE ALARM LAYOUT - SECOND FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED SECOND FLOOR LIGHTING & FIRE ALARM LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED SMALL POWER & ANCILLARY SERVICES LAYOUT - GROUND FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED GROUND FLOOR SMALL POWER & ANCILLARY SERVICES LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED FIRST FLOOR SMALL POWER & ANCILLARY SERVICES LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED SMALL POWER & ANCILLARY SERVICES LAYOUT - SECOND FLOORSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED SECOND FLOOR SMALL POWER & ANCILLARY SERVICES LAYOUTSubmitted Drawing | Not published | View |
| MECHANICAL SYMBOLS LEGENDReport | 10 Jul 2026 | View |
| PROPOSED LTHW PLANT SCHEMATICSubmitted Drawing | Not published | View |
| PROPOSED LTHW HEATING SCHEMATICSubmitted Drawing | Not published | View |
| PROPOSED BOILER ROOM & STORE PLANTROOM MECHANICAL SERVICES LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED GAS SCHEMATIC DIAGRAMSubmitted Drawing | Not published | View |
| PROPOSED DOMESTIC HOT & COLD WATER SCHEMATICSubmitted Drawing | Not published | View |
| PROPOSED GROUND FLOOR HEATING LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED FIRST FLOOR HEATING LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED SECOND FLOOR HEATING LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED GROUND FLOOR VENTILATION & ABOVE GROUND DRAINAGE LAYOUT & ISOMETRICSSubmitted Drawing | Not published | View |
| PROPOSED VENTILATION & ABOVE GROUND DRAINAGE LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED SECOND FLOOR VENTILATION & ABOVE GROUND DRAINAGE LAYOUTSubmitted Drawing | Not published | View |
| PROPOSED DOMESTIC HOT & COLD WATER - SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| PROPOSED DOMESTIC HOT & COLD WATER - FIRST & SECOND FLOOR SERVICES LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| EXISTING GROUND FLOOR - PROPOSED STRIP OUTSubmitted Drawing | Not published | View |
| EXISTING FIRST FLOOR - PROPOSED STRIP OUTSubmitted Drawing | Not published | View |
| PROPOSED STRIPOUT - SECOND FLOORSubmitted Drawing | 10 Jul 2026 | View |
| SECOND FLOOR - PROPOSED STRIPOUTSubmitted Drawing | Not published | View |
| PROPOSED REPAIRS - STRUCTURAL DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| BOILER ROOM - STRUCTURAL DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| ELEVATION REPAIRS - STRUCTURAL DETAILSSubmitted Drawing | 10 Jul 2026 | View |
| DRAINAGE LAYOUTSubmitted Drawing | 10 Jul 2026 | View |
| REFURBISHMENT ASBESTOS SURVEYReport | Not published | View |
| ROYAL BOTANIC GARDENS - PID TESTINGReport | 10 Jul 2026 | View |
| SITE VISIT PLANDetail Drawing | Not published | View |
| ECOLOGICAL IMPACT ASSESSMENTReport | 10 Jul 2026 | View |
| VENTILATION/EXTRACTION REPORTReport | 10 Jul 2026 | View |
| KITCHEN EXTRACT SYSTEM ASSESSMENT & SUPPLEMENTARY ADVICEReport | Not published | View |
| ACOUSTIC CONSULTANCY REPORTReport | 10 Jul 2026 | View |
| DECORATION RATIONALEReport | 10 Jul 2026 | View |
| REASONABLE EXCEPTION STATEMENT - FIRE STATEMENTReport | 10 Jul 2026 | View |
| CIL FORMApplication Form | 10 Jul 2026 | View |
| COVER LETTERCovering letter | 10 Jul 2026 | View |
| PLANNING STATEMENTReport | Not published | View |
| Porte Cochere RailingSubmitted Drawing | 14 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.