You are required to complete the Community Infrastructure Levy form (CIL) Please find the link below to the form and additional information guidance. http://www.planningportal.gov.uk/uploads/1app/forms/cil_questions.pdf http://www.planningportal.gov.uk/uploads/1app/cil_guidance.pdf
Flood Risk Assessment (FRA) is required for your application as the area is susceptible to water drainage. Please mark the relevant box from the link below and submit. http://webarchive.nationalarchives.gov.uk/20140328084622/http://www.environment-agency.gov.uk/static/documents/Utility/Advisory_Comments_FZ2-3_v3.1.pdf
REASONABLE EXCEPTION STATEMENT (RES) Fire Safety Strategy (which also incorporates requirements of the evacuation lift guidance where including a lift). All developments The London Plan 2021 - Policy D12 (A) and D5 and D5 draft_guidance_sheet _d5_b5_evacuation_lifts_070720_web.pdf (london.gov.uk) London Plan policy D12 requires the submission of a Fire Safety Strategy on all planning applications. The Fire Safety Strategy should be presented as a standalone document with a clear structure that addresses the criteria set out in London Plan Policy D12 part A. The submitted drawings should address the requirements set out at paragraphs 3.12.3 and 3.12.4 of the London Plan. Where the applicant considers parts of or the whole policy do not apply, this should be justified in a Reasonable Exception Statement (RES). Draft guidance on Fire Safety Strategies is available at: https://www.london.gov.uk/what-we-do/planning/implementing-london-plan/london-plan-guidance-and-spgs/draft-fire-safety-guidance-pre-consultation-information Where the proposal includes a lift, the applicant should address the requirements of London Plan policy D5 within their Fire Safety Statement. https://richmond.gov.uk/media/18491/local_validation_checklist_for_all_applications.pdf
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. REASON: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.
No new external finishes (including fenestration), including works of making good, shall be carried out other than in materials to match the existing, except where indicated otherwise on the submitted application form and/or approved drawings. REASON: To ensure that the proposed development is in keeping with the existing building and does not prejudice the appearance of the locality.
The development hereby permitted shall be carried out in accordance with the following approved plans and documents, where applicable. Drawing. Location Plan; Existing Site Plan; Proposed Site Plan; Floor Plan; Elevations; Roof Plan, received the 26th June 2026. REASON: To accord with the terms of the application, for the av oidance of doubt and in the interests of proper planning.
The development must be carried out in accordance with the provisions of the Reasonable Exception Statement (RES) received the 7th July 2026 unless otherwise approved in writing by the Local Planning Authority. REASON: To ensure that the development incorporates the necessary fire safety measures in accordance with the Mayor's London Plan Policy D12.
Approval of a Biodiversity Gain Plan will not be required before development commences Biodiversity Net Gain The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for development of land in England is deemed to have been granted subject to the condition ('biodiversity gain condition') that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan, if one is required in respect of this permission would be the London Borough of Richmond upon Thames. There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed below. Based on the information available this permission is considered to be one which will not require the approval of a biodiversity gain plan before development is begun because one or more of the statutory exemptions or transitional arrangements in the list below is/are considered to apply. Statutory exemptions and transitional arrangements in respect of the biodiversity gain condition. 1. The application for planning permission was made before 12 February 2024. 2. The planning permission relates to development to which section 73A of the Town and Country Planning Act 1990 (planning permission for development already carried out) applies. 3. The planning permission was granted on an application made under section 73 of the Town and Country Planning Act 1990 and (i) the original planning permission to which the section 73 planning permission relates* was granted before 12 February 2024; or (ii) the application for the original planning permission* to which the section 73 planning permission relates was made before 12 February 2024. 4. The permission which has been granted is for development which is exempt being: 4.1 Development which is not 'major development' (within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015) where: (i) the application for planning permission was made before 2 April 2024; (ii) planning permission is granted which has effect before 2 April 2024; or (iii) planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 where the original permission to which the section 73 permission relates* was exempt by virtue of (i) or (ii). 4.2 Development below the de minimis threshold, meaning development which: (i) does not impact an onsite priority habitat (a habitat specified in a list published under section 41 of the Natural Environment and Rural Communities Act 2006); and (ii) impacts less than 25 square metres of onsite habitat that has biodiversity value greater than zero and less than 5 metres in length of onsite linear habitat (as defined in the statutory metric). 4.3 Development which is subject of a householder application within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015. A 'householder application' means an application for planning permission for development for an existing dwellinghouse, or development within the curtilage of such a dwellinghouse for any purpose incidental to the enjoyment of the dwellinghouse which is not an application for change of use or an application to change the number of dwellings in a building. 4.4 Development of a biodiversity gain site, meaning development which is undertaken solely or mainly for the purpose of fulfilling, in whole or in part, the Biodiversity Gain Planning condition which applies in relation to another development, (no account is to be taken of any facility for the public to access or to use the site for educational or recreational purposes, if that access or use is permitted without the payment of a fee). 4.5 Self and Custom Build Development, meaning development which: (i) consists of no more than 9 dwellings; (ii) is carried out on a site which has an area no larger than 0.5 hectares; and (iii) consists exclusively of dwellings which are self-build or custom housebuilding (as defined in section 1(A1) of the Self-build and Custom Housebuilding Act 2015). 4.6 Development forming part of, or ancillary to, the high speed railway transport network (High Speed 2) comprising connections between all or any of the places or parts of the transport network specified in section 1(2) of the High Speed Rail (Preparation) Act 2013. * 'original planning permission means the permission to which the section 73 planning permission relates' means a planning permission which is the first in a sequence of two or more planning permissions, where the second and any subsequent planning permissions are section 73 planning permissions. Irreplaceable habitat If the onsite habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) there are additional requirements for the content and approval of Biodiversity Gain Plans. The Biodiversity Gain Plan must include, in addition to information about steps taken or to be taken to minimise any adverse effect of the development on the habitat, information on arrangements for compensation for any impact the development has on the biodiversity of the irreplaceable habitat. The planning authority can only approve a Biodiversity Gain Plan if satisfied that the adverse effect of the development on the biodiversity of the irreplaceable habitat is minimised and appropriate arrangements have been made for the purpose of compensating for any impact which do not include the use of biodiversity credits. The effect of section 73D of the Town and Country Planning Act 1990 If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission ('the earlier Biodiversity Gain Plan') there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted. Those circumstances are that the conditions subject to which the section 73 permission is granted: (i) do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and (ii) in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
In accordance with Section DM3 of the National Planning Policy Framework, Richmond upon Thames Borough Council takes a positive and proactive approach to the delivery of sustainable development, by: * Providing a formal pre-application service * Providing written policies and guidance, all of which is available to view on the Council's website * Where appropriate, negotiating amendments to secure a positive decision * Determining applications in a timely manner. In this instance: * The application was acceptable as submitted, and approved without delay
During onsite construction of any phase of development, all non-road transportable industrial equipment or vehicles which are fitted with an internal diesel powered compression ignition engine between 37 and 560KW and not intended for transporting goods or passengers on roads are required to meet Stage IIIB of EU Directive 97/68/E and be NRMM registered. Such vehicles must be run on ultra low sulphur diesel (also known as ULSD 'cleaner diesel' or 'green diesel'). 'Ultra low sulphur diesel' means fuel meeting the specification within BS EN 590. Where these standards are succeeded, they should be applied when reasonable. Exemptions to these standards may be granted for specialist equipment or for equipment with alternative emission reduction equipment or run on alternative fuels. Such exemptions shall be applied for in writing to the local planning authority in advance of the use of such vehicles, detailing the reasons for the exemption being sought and clearly identifying the subject vehicles. Exemptions that are granted will be in writing and such vehicles must not be used until written exemption has been issued by the local planning authority. No vehicles or plant to which the above emission standards apply shall be on site, at any time, whether in use or not, unless it complies with the above standards, without the prior written consent of the local planning authority. Reason: To protect the amenity of future occupants and/or neighbours.
That the outbuilding be used only for/as ancillary purposes to that of the residential dwelling and shall at no time be used for any other purpose. REASON: To safeguard the amenities of nearby occupiers and the area generally.
(A) No equipment, machinery or materials are to be brought on the site for the purpose of the development until all trees to be retained shall be protected by fences or other suitable means of enclosure to the recommended distances given in Table 1 of the current British Standard 5837: 2005 Trees in Relation to Construction - Recommendations, or to such distances and by such methods as may be agreed in writing by the Local Planning Authority prior to the commencement of the proposals and with regard to this proposal such protective fencing shall normally be at least 1.2m high comprising a vertical and horizontal framework of scaffolding, well braced to resist impact, supporting either cleft chestnut pale fencing (in accordance with BS 1772: part 4) or chain link fencing (in accordance with BS 1772: part 1) as shown in figure 4 of BS 5837:2005, within which no activities associated with building operations shall take place, such areas also being free of the storage of materials or temporary structures. (B) No fire shall be lit within 10m from the outside of the crown spread of trees to be retained. (C) the ground levels within the protected areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority. (D) All means of protection shall be in situ for the duration of the development and distances of such protection should be passed by a person suitably experienced in arboriculture. (E) No equipment, signage, fencing, tree protection barriers, materials, components, vehicles or structures to be attached to or supported by a retained tree. (F) No mixing of cement or use of other materials or substances to take place within a Root Protection Area ('RPA'), or close enough to a RPA that seepage or displacement of those materials or substances could enter a RPA. (G) No alterations or variations to the approved works or tree protection schemes shall be carried out without the prior written approval of the local planning authority. REASON: To ensure that the tree (s) are not damaged or otherwise adversely affected by building operations and soil compaction.
The applicant / developer may be required to enter into an Asset Protection Agreement toget the required resource and expertise on-board to enable approval of detailed works. Tostart the process with our Asset Protection team, the applicant / developer should use theAsset Protection Customer Experience (ACE) system found on Network Rail’s AssetProtection website ( https://www.networkrail.co.uk/running-the-railway/looking-after-the-railway/asset-protection-and-optimisation/ ). This website also provides more informationabout our Asset Protection team and the services they offer. Network Rail strongly recommends the developer complies with the following comments and requirements to maintain the safe operation of the railway and protect Network Rail’s infrastructure. Future maintenance The applicant must ensure that any construction and subsequent maintenance can be carried out to any proposed buildings or structures without adversely affecting the safety of/or encroaching upon Network Rail’s adjacent land and air-space. Therefore, any buildings are required to be situated at least 2 metres (3m for overhead lines and third rail) from Network Rail’s boundary. This requirement will allow for the construction and future maintenance of a building without the need to access the operational railway environment. Any less than 2m (3m for overhead lines and third rail) and there is a strong possibility that the applicant (and any future resident) will need to utilise Network Rail land and air-space to facilitate works as well as adversely impact upon Network Rail’s maintenance teams’ ability to maintain our boundary fencing and boundary treatments. Access to Network Rail’s land may not always be granted and if granted may be subject to railway site safety requirements and special provisions with all associated railway costs charged to the applicant. As mentioned above, any works within Network Rail’s land would need approval from the Network Rail Asset Protection Engineer. This request should be submitted at least 20 weeks before any works are due to commence on site and the applicant is liable for all associated costs (e.g., all possession, site safety, asset protection presence costs). However, Network Rail is not required to grant permission for any third-party access to its land. Plant & Materials All operations, including the use of cranes or other mechanical plant working adjacent to Network Rail’s property, must at all times be carried out in a “fail safe” manner such that in the event of mishandling, 1 collapse or failure, no plant or materials are capable of falling within 3.0m of the boundary with Network Rail. Drainage Storm/surface water must not be discharged onto Network Rail’s property or into Network Rail’s culverts or drains except by agreement with Network Rail. Suitable drainage or other works must be provided and maintained by the Developer to prevent surface water flows or run-off onto Network Rail’s property. Proper provision must be made to accept and continue drainage discharging from Network Rail’s property; full details to be submitted for approval to the Network Rail Asset Protection Engineer. Suitable foul drainage must be provided separate from Network Rail’s existing drainage. Soakaways, as a means of storm/surface water disposal must not be constructed within 20 metres of Network Rail’s boundary or at any point which could adversely affect the stability of Network Rail’s property. After the completion and occupation of the development, any new or exacerbated problems attributable to the new development shall be investigated and remedied at the applicants’ expense. Scaffolding Any scaffold which is to be constructed within 10 metres of the railway boundary fence must be erected in such a manner that at no time will any poles over-sail the railway and protective netting around such scaffold must be installed. The applicant/applicant’s contractor must consider if they can undertake the works and associated scaffold/access for working at height within the footprint of their property boundary. Piling Where vibro-compaction/displacement piling plant is to be used in development, details of the use of such machinery and a method statement should be submitted for the approval of the Network Rail’s Asset Protection Engineer prior to the commencement of works and the works shall only be carried out in accordance with the approved method statement. Fencing In view of the nature of the development, it is essential that the developer provide (at their own expense) and thereafter maintain a substantial, trespass proof fence along the development side of the existing boundary fence, to a minimum height of 1.8 metres. The 1.8m fencing should be adjacent to the railway boundary and the developer/applicant should make provision for its future maintenance and renewal without encroachment upon Network Rail land. Network Rail’s existing fencing / wall must not be removed or damaged and at no point during or post construction should the foundations of the fencing or wall or any embankment therein, be damaged, undermined or compromised in any way. Any vegetation within Network Rail’s land boundary must not be disturbed. Any fencing installed by the applicant must not prevent Network Rail from maintaining its own fencing/boundary treatment. Lighting Any lighting associated with the development (including vehicle lights) must not interfere with the sighting of signalling apparatus and/or train drivers’ vision on approaching trains. The location and colour of lights must not give rise to the potential for confusion with the signalling arrangements on the railway. The developers should obtain Network Rail’s Asset Protection Engineer’s approval of their detailed proposals regarding lighting. Noise and Vibration The potential for any noise/vibration impacts caused by the proximity between the proposed development and any existing railway should be made aware to the future occupiers of the site. It must also be assessed in the context of the National Planning Policy Framework which holds relevant national guidance information. The current level of usage may be subject to change at any time without notification including increased frequency of trains, night-time train running and heavy freight trains. The appropriate building materials should be used to reduce any potential noise disturbance from the railway. Vehicle Incursion Where a proposal calls for hard standing area/parking of vehicles area near the boundary with the operational railway, Network Rail would recommend the installation of a highways approved vehicle incursion barrier or high kerbs to prevent vehicles accidentally driving or rolling onto the railway or damaging lineside fencing. Landscaping Any trees/shrubs to be planted adjacent to the railway boundary these shrubs should be positioned at a minimum distance greater than their predicted mature height from the boundary. Certain broad leaf deciduous species should not be planted adjacent to the railway boundary as the species will contribute to leaf fall which will have a detrimental effect on the safety and operation of the railway. Network Rail wish to be involved in the approval of any landscaping scheme adjacent to the railway. Any hedge planted adjacent to Network Rail’s boundary fencing for screening purposes should be so placed that when fully grown it does not damage the fencing or provide a means of scaling it. No hedge should prevent Network Rail from maintaining its boundary fencing. If required, Network Rail’s Asset Protection team are able to provide more details on which trees/shrubs are permitted within close proximity to the railway. If you would like to discuss any of the above, please contact AssetProtectionWessex@networkrail.co.uk Property Informatives Property Rights Whilst not a planning matter, we would like to remind the applicant of the need to identify and comply with all existing rights on the land. Network Rail request all existing rights, covenants and easements are retained unless agreed otherwise with Network Rail. Notwithstanding the above, if any property rights are required from Network Rail in order to deliver the development, Network Rail’s Property team will need to be contacted. Shared Value It should be noted that where any Network Rail land, rights over Network Rail land, interfaces with Network Rail’s land or rights, or variations to Network Rail’s land or rights, is required for the facilitation, delivery, or operation of a development, Network Rail will act in accordance with its Shared Value Policy. Network Rail’s Shared Value Policy is available online, or via request to Network Rail Property. Network Rail’s Southern Property Team would advise parties seek to raise Shared Value early in discussion with Network Rail, but reserve the right to implement the Shared Value Policy at any time during discussions. If a Network Rail Southern Property contact is required, please contact southernproperty@networkrail.co.uk
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.