Council planning record

Creation of a front lightwell to serve basement cellar.

151, Richmond Road, Twickenham, TW1 3AT

The decision has been made on the application.Reference: PA26/1498London Borough of Richmond upon Thames

Last published check: 2 Oct 2026, 09:02. Check the council record for more recent changes.

Application location

151, Richmond Road, Twickenham, TW1 3AT

This record has no verified map location.

Application summary

Status
The decision has been made on the application.
Application type
Householder Application
Received
30 Apr 2026
Validated
24 Jun 2026
Determination deadline
19 Aug 2026
Local authority
London Borough of Richmond upon Thames

Application overview

Creation of a front lightwell to serve basement cellar.

Proposal details

Reference
PA26/1498
Alternative references
PP-14900249
Ward
Twickenham Riverside Ward [TRW]
Agent
Irkmonas
UPRN
100022343763

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 27 of 27

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted30 Apr 2026View
CIL FORMCommunity Infrastructure Levy Form30 Apr 2026View
Fire Safety StatementReport7 May 2026View
Existing Location Plan 01 Rev ASubmitted Drawing8 May 2026View
Proposed Block Plan 08 Rev ASubmitted Drawing8 May 2026View
Structural StatementReport19 Jun 2026View
BNG StatementReport19 Jun 2026View
Heritage StatementReport19 Jun 2026View
EXISTING LOCATION PLAN 01Submitted Drawing24 Jun 2026View
PROPOSED GROUND FLOOR PLAN 10Submitted Drawing24 Jun 2026View
PROPOSED FRONT ELEVATION 11Submitted Drawing24 Jun 2026View
PROPOSED WEST SIDE ELEVATION 12Submitted Drawing24 Jun 2026View
PROPOSED EAST SIDE ELEVATION 13Submitted Drawing24 Jun 2026View
EXISTING BLOCK PLAN 02Submitted Drawing24 Jun 2026View
EXISTING CELLAR FLOOR PLAN 03Submitted Drawing24 Jun 2026View
EXISTING GROUND FLOOR PLAN 04Submitted Drawing24 Jun 2026View
EXISTING FRONT ELEVATION 05Submitted Drawing24 Jun 2026View
EXISTING WEST SIDE ELEVATION 07Submitted Drawing24 Jun 2026View
EXISTING EAST SIDE ELEVATION 07Submitted Drawing24 Jun 2026View
PROPOSED BLOCK PLAN 08Submitted Drawing24 Jun 2026View
PROPOSED CELLAR FLOOR PLAN 09Submitted Drawing24 Jun 2026View
Construction Method StatementReport24 Jun 2026View
Flood Risk Assessment Supporting StatementReport11 Aug 2026View
Flood Risk ProformaReport11 Aug 2026View
Justification Siting LightwellReport11 Aug 2026View
Officers ReportReport13 Aug 2026View
decisionDecision Notice13 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  14. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted Permission
decision
Planning conditions
  1. The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. REASON: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.
  2. The development hereby permitted shall be carried out in accordance with the following approved plans and documents, where applicable. Fire Safety Statement Report Received 07 May 2026 Existing Location Plan 01 Rev A Proposed Block Plan 08 Rev A All received 08 May 2026 Construction Method Statement Site Access Received 08 June 2026 Structural Statement BNG Statement Heritage Statement All received 19 June 20206 Construction Method Statement Report EXISTING LOCATION PLAN 01 PROPOSED GROUND FLOOR PLAN 10 PROPOSED FRONT ELEVATION 11 PROPOSED WEST SIDE ELEVATION 12 PROPOSED EAST SIDE ELEVATION 13 EXISTING BLOCK PLAN 02 EXISTING CELLAR FLOOR PLAN 03 EXISTING GROUND FLOOR PLAN 04 EXISTING FRONT ELEVATION 05 EXISTING WEST SIDE ELEVATION 07 EXISTING EAST SIDE ELEVATION 07 PROPOSED BLOCK PLAN 08 PROPOSED CELLAR FLOOR PLAN 09 All received on 24 June 2026 Flood Risk Assessment Supporting Statement Report Flood Risk Proforma Justification Siting Lightwell All received 11 August 2026 REASON: To accord with the terms of the application, for the avoidance of doubt and in the interests of proper planning.
  3. The development must be carried out in accordance with the provisions of the Fire Safety Strategy by Dizzain Ltd dated 07 May 2026 unless otherwise approved in writing by the Local Planning Authority. REASON: To ensure that the development incorporates the necessary fire safety measures in accordance with the Mayor's London Plan Policy D12.
  4. Approval of a Biodiversity Gain Plan will not be required before development commences Biodiversity Net Gain The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for development of land in England is deemed to have been granted subject to the condition ('biodiversity gain condition') that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan, if one is required in respect of this permission would be the London Borough of Richmond upon Thames. There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed below. Based on the information available this permission is considered to be one which will not require the approval of a biodiversity gain plan before development is begun because one or more of the statutory exemptions or transitional arrangements in the list below is/are considered to apply. Statutory exemptions and transitional arrangements in respect of the biodiversity gain condition. 1. The application for planning permission was made before 12 February 2024. 2. The planning permission relates to development to which section 73A of the Town and Country Planning Act 1990 (planning permission for development already carried out) applies. 3. The planning permission was granted on an application made under section 73 of the Town and Country Planning Act 1990 and (i) the original planning permission to which the section 73 planning permission relates* was granted before 12 February 2024; or (ii) the application for the original planning permission* to which the section 73 planning permission relates was made before 12 February 2024. 4. The permission which has been granted is for development which is exempt being: 4.1 Development which is not 'major development' (within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015) where: (i) the application for planning permission was made before 2 April 2024; (ii) planning permission is granted which has effect before 2 April 2024; or (iii) planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 where the original permission to which the section 73 permission relates* was exempt by virtue of (i) or (ii). 4.2 Development below the de minimis threshold, meaning development which: (i) does not impact an onsite priority habitat (a habitat specified in a list published under section 41 of the Natural Environment and Rural Communities Act 2006); and (ii) impacts less than 25 square metres of onsite habitat that has biodiversity value greater than zero and less than 5 metres in length of onsite linear habitat (as defined in the statutory metric). 4.3 Development which is subject of a householder application within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015. A 'householder application' means an application for planning permission for development for an existing dwellinghouse, or development within the curtilage of such a dwellinghouse for any purpose incidental to the enjoyment of the dwellinghouse which is not an application for change of use or an application to change the number of dwellings in a building. 4.4 Development of a biodiversity gain site, meaning development which is undertaken solely or mainly for the purpose of fulfilling, in whole or in part, the Biodiversity Gain Planning condition which applies in relation to another development, (no account is to be taken of any facility for the public to access or to use the site for educational or recreational purposes, if that access or use is permitted without the payment of a fee). 4.5 Self and Custom Build Development, meaning development which: (i) consists of no more than 9 dwellings; (ii) is carried out on a site which has an area no larger than 0.5 hectares; and (iii) consists exclusively of dwellings which are self-build or custom housebuilding (as defined in section 1(A1) of the Self-build and Custom Housebuilding Act 2015). 4.6 Development forming part of, or ancillary to, the high speed railway transport network (High Speed 2) comprising connections between all or any of the places or parts of the transport network specified in section 1(2) of the High Speed Rail (Preparation) Act 2013. * 'original planning permission means the permission to which the section 73 planning permission relates' means a planning permission which is the first in a sequence of two or more planning permissions, where the second and any subsequent planning permissions are section 73 planning permissions. Irreplaceable habitat If the onsite habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) there are additional requirements for the content and approval of Biodiversity Gain Plans. The Biodiversity Gain Plan must include, in addition to information about steps taken or to be taken to minimise any adverse effect of the development on the habitat, information on arrangements for compensation for any impact the development has on the biodiversity of the irreplaceable habitat. The planning authority can only approve a Biodiversity Gain Plan if satisfied that the adverse effect of the development on the biodiversity of the irreplaceable habitat is minimised and appropriate arrangements have been made for the purpose of compensating for any impact which do not include the use of biodiversity credits. The effect of section 73D of the Town and Country Planning Act 1990 If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission ('the earlier Biodiversity Gain Plan') there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted. Those circumstances are that the conditions subject to which the section 73 permission is granted: (i) do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and (ii) in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
  5. In accordance with paragraphs 38-42 of the National Planning Policy Framework, Richmond upon Thames Borough Council takes a positive and proactive approach to the delivery of sustainable development, by: * Providing a formal pre-application service * Providing written policies and guidance, all of which is available to view on the Council's website * Where appropriate, negotiating amendments to secure a positive decision * Determining applications in a timely manner. In this instance: * The application was acceptable as submitted, and approved without delay
  6. The development must be carried out in accordance with the provisions of the Flood Risk Assessment and the Flood Risk Proforma both dated 11 August 2026 unless otherwise approved in writing by the Local Planning Authority. Reason: To minimise the risk of surface water ingress and ensure the development remains safe for its lifetime without increasing flood risk elsewhere, in accordance with London Plan Policy SI 13 and Richmond’s Local Plan Policy 8.
  7. The external surfaces and finish of the lightwell and, where applicable, all areas of hard surfacing shall not be constructed other than in materials details/samples of which shall be submitted to and approved in writing by the Local Planning Authority. REASON: To ensure that the proposed development does not prejudice the appearance of the locality.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.