The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. REASON: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004.
The development hereby permitted shall be carried out in accordance with the following approved plans and documents, where applicable. - M3 Floodtec brochure received by council 11 March 2026 - Flood Risk Assessment, Detailed Flood Risk (Ref: EIR2026 - 04080), and Flood Map for Planning received by council 11 March 2026 - Location Plan (PP-14758364v1), M3DRGSO7016-201 rev. P01, and Appendix B (Existing Elevation) recieved by council 11 March 2026 - 2123.01.03.Exg.021, 2123.01.03.Exg.061, 2123.01.03.Exg.002, 2123.03.03.Pln.021, 2123.03.03.Pln.061 and 2123.03.03.Pln.002 received by council 09 April 2026 REASON: To accord with the terms of the application, for the avoidance of doubt and in the interests of proper planning.
Approval of a Biodiversity Gain Plan will not be required before development commences Biodiversity Net Gain The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for development of land in England is deemed to have been granted subject to the condition ('biodiversity gain condition') that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan, if one is required in respect of this permission would be the London Borough of Richmond upon Thames. There are statutory exemptions and transitional arrangements which mean that the biodiversity gain condition does not always apply. These are listed below. Based on the information available this permission is considered to be one which will not require the approval of a biodiversity gain plan before development is begun because one or more of the statutory exemptions or transitional arrangements in the list below is/are considered to apply. Statutory exemptions and transitional arrangements in respect of the biodiversity gain condition. 1. The application for planning permission was made before 12 February 2024. 2. The planning permission relates to development to which section 73A of the Town and Country Planning Act 1990 (planning permission for development already carried out) applies. 3. The planning permission was granted on an application made under section 73 of the Town and Country Planning Act 1990 and (i) the original planning permission to which the section 73 planning permission relates* was granted before 12 February 2024; or (ii) the application for the original planning permission* to which the section 73 planning permission relates was made before 12 February 2024. 4. The permission which has been granted is for development which is exempt being: 4.1 Development which is not 'major development' (within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015) where: (i) the application for planning permission was made before 2 April 2024; (ii) planning permission is granted which has effect before 2 April 2024; or (iii) planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 where the original permission to which the section 73 permission relates* was exempt by virtue of (i) or (ii). 4.2 Development below the de minimis threshold, meaning development which: (i) does not impact an onsite priority habitat (a habitat specified in a list published under section 41 of the Natural Environment and Rural Communities Act 2006); and (ii) impacts less than 25 square metres of onsite habitat that has biodiversity value greater than zero and less than 5 metres in length of onsite linear habitat (as defined in the statutory metric). 4.3 Development which is subject of a householder application within the meaning of article 2(1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015. A 'householder application' means an application for planning permission for development for an existing dwellinghouse, or development within the curtilage of such a dwellinghouse for any purpose incidental to the enjoyment of the dwellinghouse which is not an application for change of use or an application to change the number of dwellings in a building. 4.4 Development of a biodiversity gain site, meaning development which is undertaken solely or mainly for the purpose of fulfilling, in whole or in part, the Biodiversity Gain Planning condition which applies in relation to another development, (no account is to be taken of any facility for the public to access or to use the site for educational or recreational purposes, if that access or use is permitted without the payment of a fee). 4.5 Self and Custom Build Development, meaning development which: (i) consists of no more than 9 dwellings; (ii) is carried out on a site which has an area no larger than 0.5 hectares; and (iii) consists exclusively of dwellings which are self-build or custom housebuilding (as defined in section 1(A1) of the Self-build and Custom Housebuilding Act 2015). 4.6 Development forming part of, or ancillary to, the high speed railway transport network (High Speed 2) comprising connections between all or any of the places or parts of the transport network specified in section 1(2) of the High Speed Rail (Preparation) Act 2013. * 'original planning permission means the permission to which the section 73 planning permission relates' means a planning permission which is the first in a sequence of two or more planning permissions, where the second and any subsequent planning permissions are section 73 planning permissions. Irreplaceable habitat If the onsite habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) there are additional requirements for the content and approval of Biodiversity Gain Plans. The Biodiversity Gain Plan must include, in addition to information about steps taken or to be taken to minimise any adverse effect of the development on the habitat, information on arrangements for compensation for any impact the development has on the biodiversity of the irreplaceable habitat. The planning authority can only approve a Biodiversity Gain Plan if satisfied that the adverse effect of the development on the biodiversity of the irreplaceable habitat is minimised and appropriate arrangements have been made for the purpose of compensating for any impact which do not include the use of biodiversity credits. The effect of section 73D of the Town and Country Planning Act 1990 If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission ('the earlier Biodiversity Gain Plan') there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted. Those circumstances are that the conditions subject to which the section 73 permission is granted: (i) do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and (ii) in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
In accordance with paragraphs 38-42 of the National Planning Policy Framework, Richmond upon Thames Borough Council takes a positive and proactive approach to the delivery of sustainable development, by: * Providing a formal pre-application service * Providing written policies and guidance, all of which is available to view on the Council's website * Where appropriate, negotiating amendments to secure a positive decision * Determining applications in a timely manner. In this instance: * The application was acceptable as submitted, and approved without delay
The Environmental Permitting (England and Wales) Regulations 2016 require a permit or exemption to be obtained for any of the following activities: • erecting any temporary or permanent structure in, over or under a main river, such as a culvert, outfall, weir, dam, pipe crossing, erosion protection, scaffolding or bridge • altering, repairing or maintaining any temporary or permanent structure in, over or under a main river, where the work could affect the flow of water in the river or affect any drainage work • building or altering any permanent or temporary structure designed to contain or divert flood waters from a main river • dredging, raising or removing any material from a main river, including when you are intending to improve flow in the river or use the materials removed • diverting or impounding the flow of water or changing the level of water in a main river • quarrying or excavation within 16 metres of any main river, flood defence (including a remote defence) or culvert • any activity within 8 metres of the bank of a main river, or 16 metres if it is a tidal main river • any activity within 8 metres of any flood defence structure or culvert on a main river, or 16 metres on a tidal river • any activity within 16 metres of a sea defence structure • activities carried out on the floodplain of a main river, more than 8 metres from the river bank, culvert or flood defence structure (or 16 metres if it is a tidal main river), if you do not have planning permission (you do not need permission to build agricultural hay stacks, straw stacks or manure clamps in these places) For further guidance please visit Flood risk activities: environmental permits - GOV.UK or contact our National Customer Contact Centre on 03708 506 506 (Monday to Friday, 8am to 6pm) or by emailing enquiries@environment- agency.gov.uk. The applicant should not assume that a permit will automatically be forthcoming once planning permission has been granted, and we advise them to consult with us at the earliest opportunity.
The applicant is advised of the following: The applicant has not provided height measurements in metres Above Ordnance Datum (mAOD), nor has any reference been made to compliance with the Thames Estuary 2100 (TE2100) Plan, which includes requirements for future raising of the flood defence line. In addition, the applicant will need to consider the long-term maintenance of the proposed flood gate. This should include a clear maintenance strategy and consideration of future replacement, given the relatively short lifespan of the flood gate and its inability to last for the 100-year expected for residential development
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.