Conversion of first floor and part ground floor commercial (Class E) to 1 studio flat (c3) with associated waste/refuse and cycle store. Retention of existing commercial use on ground floor as a practicing dental surgery. (summary)
DEVELOPMENT AT 58, CLARENCE AVENUE, GANTS HILL, ILFORD
A decision on this application has been issued.Reference: 3367/25London Borough of Redbridge
Last published check: 2 Oct 2026, 13:54. Check the council record for more recent changes.
Application location
DEVELOPMENT AT 58, CLARENCE AVENUE, GANTS HILL, ILFORD
This record has no verified map location.
Application summary
Status
A decision on this application has been issued.
Application type
Full Planning Permission
Received
28 Nov 2025
Validated
10 Jun 2026
Determination deadline
3 Aug 2026
Local authority
London Borough of Redbridge
Application overview
Conversion of first floor and part ground floor commercial (Class E) to 1 studio flat (c3) with associated waste/refuse and cycle store. Retention of existing commercial use on ground floor as a practicing dental surgery. (summary)
Proposal details
Reference
3367/25
Alternative references
PP-14525589
Ward
Cranbrook
Agent
Connolly-Taylor
UPRN
10097092879
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be carried out in accordance with the following approved plans: A_099 Rev 01, A_100 Rev P_01, A_101 Rev P01, A_103 Rev P01, A_200 Rev P_01, A_201 Rev P_01, A_300 Rev P_01, A_800 Rev P_01, A_900 Rev P_01, A_901 Rev P_01 D_051 Rev R_01, D_052 Rev P_01, D_053 Rev P_01 E_099 (OS) Rev 01, E_000 Rev P_01, E_101 Rev P_01, E_102 Rev P_01, E_103 Rev P_01, E_104 Rev P_01, E_105 Rev P_01, E_106 Rev P-01, E_107 Rev P_01 Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
The external materials to be used in the construction of the development hereby permitted shall accord with the specification stated in the planning application form submitted with the application unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure the that the development accords with the terms of the application and to ensure that the development has a satisfactory appearance and comply with LP26 of the Council’s Local Plan.
Prior to first occupation of the site, further details of the cycle parking for the proposed flat showing how the cycle store would be both secure and sheltered from the elements shall be submitted to and approved in writing by the Local Planning Authority. The secure and sheltered cycle parking as approved shall then be retained at the site thereafter in accordance with the approved drawings at all times, and be made permanently available and maintained for users of the development. Reason: In order to ensure the development complies with the terms of the application and with Policy LP23 of the Council’s Local Plan.
Prior to first occupation of the site, further revised details of the residential and commerical refuse stores showing how they would be seperated/segregated from one another in dedicated stores to avoid cross contamination shall be submitted to and approved in writing by the Local Planning Authority. The secure and sheltered cycle parking as approved shall then be retained at the site thereafter in accordance with the approved drawings at all times, and be made permanently available and maintained for users of the development. Reason: In order to ensure that any such facilities respect the visual amenity of the locality, and the amenities enjoyed by occupants of neighbouring property and to comply with the National Planning Policy Framework and with Policy LP26 of the Council’s Local Plan.
Prior to the first occupation of the residential unit, further details of the sound insulation measures to be installed between the retained ground-floor dental practice and the proposed first-floor residential accommodation shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be designed to achieve an airborne sound insulation performance of not less than DnT,w + Ctr 55 dB between the commercial and residential units while habitble rooms should achieve the following Living Rooms: 35 dB LAeq,16hr (between 07:00 and 23:00 hrs);, Bedrooms: 30 dB LAeq,8hr (between 23:00 and 07:00 hrs); and Bedroom: 45 dB LAFmax The approved sound insulation measures shall be installed in full prior to occupation of the residential unit. Following completion of the works, a sound insulation test report, undertaken by a suitably qualified acoustic consultant, shall be submitted to and approved in writing by the Local Planning Authority demonstrating that the required performance standard has been achieved. The residential unit shall not be occupied until the validation report has been approved in writing by the Local Planning Authority. Reason: To protect the amenity of future occupiers from noise transmission arising from the retained commercial premises and to ensure a satisfactory standard of residential accommodation.
The development hereby approved shall be designed to meet water consumption target of 105 litres per person per day, with an additional 5 litres per person per day for external water use. Reason: In order to comply with London Plan Policy SI 5.
All non-CHP gas fired boilers installed in this development must achieve dry NOx emission levels no greater than 40 mg/kWh. Reason: To protect air quality and health in accordance with the aims of the Redbridge Local Plan and Air Quality Action Plan.
The development must be implemented in accordance with the provisions of the Fire Statement / Planning Fire Safety Strategy listed under condition 2 above. Reason: To ensure that the development incorporates the necessary fire safety measures in accordance with Policy D12 of the London Plan
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
Should your proposed development include the formation of new dwellings you are encouraged to apply to the Street Naming and Numbering team who will work in collaboration with external bodies including the emergency services and Royal Mail to have the new unit(s) formally named. Please contact SNN@redbridge.gov.uk or 0208 708 2913 for more information.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.