Council planning record

Non-Material Amendments to approved permission 2911/25: Minor revisions to footprint, removal of basement, internal reconfiguration, and alterations to fenestrations and materials. (summary)

DEVELOPMENT AT RINGSTEAD, HERMITAGE WALK, SOUTH WOODFORD, LONDON

A decision on this application has been issued.Reference: 2911/25/01London Borough of Redbridge

Last published check: 1 Oct 2026, 21:52. Check the council record for more recent changes.

Application location

DEVELOPMENT AT RINGSTEAD, HERMITAGE WALK, SOUTH WOODFORD, LONDON

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Non-Material Amendment(s)
Received
18 Jun 2026
Validated
23 Jun 2026
Determination deadline
16 Jul 2026
Local authority
London Borough of Redbridge

Application overview

Non-Material Amendments to approved permission 2911/25: Minor revisions to footprint, removal of basement, internal reconfiguration, and alterations to fenestrations and materials. (summary)

Proposal details

Reference
2911/25/01
Alternative references
PP-14990533
Ward
Wanstead Village
Agent
Doyle
UPRN
10097092598

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 17 of 17

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form18 Jun 2026View
25-29-12 LOFT FLOOR PLAN.pdfProposed plan - floor plan18 Jun 2026View
25-29-13 ROOF PLAN.pdfProposed plan - roof plan18 Jun 2026View
25-29-14 FIRST FLOOR PLAN-SEPARATION DISTANCES.pdfProposed plan - floor plan18 Jun 2026View
25-29-20 PROPOSED FRONT ELEVATION.pdfProposed plan - elevation18 Jun 2026View
25-29-21 PROPOSED REAR ELEVATION.pdfProposed plan - elevation18 Jun 2026View
25-29-22 PROPOSED R.H. SIDE ELEVATION.pdfProposed plan - elevation18 Jun 2026View
25-29-23 PROPOSED L.H. SIDE ELEVATION.pdfProposed plan - elevation18 Jun 2026View
25-29-24 PROPOSED STREET SCENE ELEVATION.pdfProposed plan - elevation18 Jun 2026View
25-29-30 PROPOSED SECTIONS.pdfProposed plan - elevation18 Jun 2026View
25-29-INF-10 PROPOSED FLOOR PLANS - COMPARISON.pdfCombined plan - floor plan18 Jun 2026View
25-29-INF-20 PROPOSED ELEVATIONS - COMPARISON.pdfCombined plan - elevation18 Jun 2026View
25-29-03 PROPOSED SITE PLAN.pdfSite/block plan18 Jun 2026View
25-29-10 GROUND FLOOR PLAN.pdfProposed plan - floor plan18 Jun 2026View
25-29-11 FIRST FLOOR PLAN.pdfProposed plan - floor plan18 Jun 2026View
2083108_Decision_Non_Material_NMAR.pdfDecision notice7 Jul 2026View
ApasTemplate_103205.pdfOfficer report7 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refuse Permission/Consent
2083108_Decision_Non_Material_NMAR.pdf
Planning conditions
  1. in accordance with plans 25-29 -INF-10, 25-29 -INF-20, 25-29 -20, 25-29 -21, 25-29 -22, 25-29 -23, 25-29 -24, 25-29 -30, 25-29 -10, 25-29 -11, 25-29 -12, 25-29 -13, 25-29 -14, and 25-29 -03.
  2. The proposed Increases to the height of the main roof and front gable projections, the extension of the two-storey front bay window beyond the approved front building line, and an increase in the ridge height of the first-floor rear extension are not considered to be non-material amendments and can therefore not be considered under S.96A of the Town and Country Planning Act 1990.
  3. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/ The proposal does not comply with policy and no pre-application discussions were entered into. The applicant is encouraged to seek pre-application advice prior to the submission of any future planning application.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.