Loft conversion with rear dormer. Three front rooflights. Removal of 2x chimneys. Single storey front extension to create porch. Detached rear outbuilding. (summary)
261, Eastern Avenue, Ilford, IG4 5AT
A decision on this application has been issued.Reference: 2263/26London Borough of Redbridge
Last published check: 30 Sept 2026, 07:36. Check the council record for more recent changes.
Application location
261, Eastern Avenue, Ilford, IG4 5AT
This record has no verified map location.
Application summary
Status
A decision on this application has been issued.
Application type
Cert. Lawfulness Proposed
Received
27 Aug 2026
Validated
1 Sept 2026
Determination deadline
22 Oct 2026
Local authority
London Borough of Redbridge
Application overview
Loft conversion with rear dormer. Three front rooflights. Removal of 2x chimneys. Single storey front extension to create porch. Detached rear outbuilding. (summary)
Proposal details
Reference
2263/26
Alternative references
PP-15156009
Ward
Barkingside
Agent
Simpson
UPRN
100022208264
Sign in to view all collected council fields and recorded changes.
In accordance with plans: Drawing 1/3 - Existing Plans & Elevations Rev - A; Drawing 2/3 - Proposed Plans & Elevations Rev - A, Drawing 3/3 - Location and Block Plan Rev - A; Site Location Plan; and Fire Statement
Schedule 2 Part 1 Class B of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - Complies Must not exceed height of highest part of existing roof - Complies Must not extend beyond the plane of any existing roof slope which forms the principal elevation of the dwellinghouse and fronts a highway - Complies Maximum volume is 40m3 for terrace houses and 50 m3 in other cases - Complies Dormer: D2.850 x H2.153 x W8.375/2 = 25.69 Total: 25.69<40m3 Must not involve installation, alteration or replacement of a veranda, balcony or raised platform, microwave antenna, chimney, flue or soil and vent pipe- Complies Must not be in a Conservation Area - Complies The materials used in any exterior work shall be of a similar appearance to those used in the construction of the exterior of the existing dwelling house - Complies Any window facing the side should be obscure glazed and non-opening up to 1.7 m above the floor - Complies The roof pitch should match the pitch of the original dwelling as far as practicable - Complies Other than in the case of a hip to gable enlargement, the edge of the enlargement closest to the eaves of the original roof shall, so far as is practicable, be not less than 20cm from the eaves of the original roof - Complies Overall Conclusion : Permitted
Schedule 2 Part 1 Class C of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - Complies Does not protrude more than 0.15 metres beyond the plane of the slope of the original roof when measured from the perpendicular with the external surface of the original roof– Complies Must not be higher than the highest part of the original roof – Complies Must not include a chimney, flue or soil and vent pipe or solar photovoltaics or solar thermal equipment – Complies Any window facing the side should be obscure glazed and non-opening up to 1.7 metres above the floor of the room in which the window is installed- Complies Sensitively located if in Conservation Area - Not applicable/not in Conservation Area. Overall Conclusion: Permitted
Schedule 2 Part 1 Class D of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, PA or Q of Schedule 2 Part 3 (change of use) - Complies Must not exceed 3 m2 in area (measured externally) – Does Not Comply (Area measures 3.16m2 externally) Must not exceed 3 m in height – Complies Must not be closer than 2 m to any boundary with a highway – Complies Overall Conclusion: Not Permitted Development
Schedule 2 Part 1 Class E of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - Complies No more than 50% of the curtilage of the original dwelling may be covered by buildings, enclosures and containers – Complies No part of the building, enclosure, pool or container would be situated on land forward of a wall forming the principal elevation of the original dwellinghouse – Complies Must not have more than one storey – Complies Maximum roof height is 4 m if dual pitched – N/a Maximum roof height within 2 m of the boundary is 2.5 m – Complies Maximum roof height is 3 m for all other cases – Complies Height of eaves cannot exceed 2.5 m – Complies Would not be used as a dwelling – Complies Must not involve provision or construction of a veranda, balcony or raised platform or microwave antenna – Complies Must not exceed 3,500 litres if a container – Complies If In a Conservation Area must not be to the side of the dwelling – Complies Not subject to an Article 4 Direction – Complies Not within the curtilage of a Listed Building - Complies Overall Conclusion: Permitted
Schedule 2 Part 1 Class G of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - Complies Must not exceed the highest part of the roof by 1 m or more – Complies If in a Conservation Area must not extend beyond a wall fronting a highway and which is either a principal or a side elevation of original dwelling – Complies Overall Conclusion: Permitted
The proposal does not constitute permitted development, by virtue of Schedule 2 Article 3, Part 1, Class D of the Town and Country Planning (General Permitted Development) Order 2015.
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/ The proposal does not comply with policy and no pre-application discussions were entered into. The applicant is encouraged to seek pre-application advice prior to the submission of any future planning application.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.