Council planning record

Refurbishment of fire damaged building, including a first floor and roof extension and subdivision into two units. Alterations to fenestration. Change of use from a Gymnasium (E(d)) to flexible use comprising General Industrial (B2), Light Industrial (E(g)(iii)) and Storage and Distribution (B8) with associated car parking, EV charging bays, cycle parking, bin and recycling storage, servicing bays and access arrangements. (Summary).

Lake Forest House, Forest Road, Ilford, IG6 3HJ

This application is currently under assessment with a planning officer. The decision, when made, will be available belowReference: 2234/26London Borough of Redbridge

Last published check: 29 Sept 2026, 21:21. Check the council record for more recent changes.

Application location

Lake Forest House, Forest Road, Ilford, IG6 3HJ

This record has no verified map location.

Application summary

Status
This application is currently under assessment with a planning officer. The decision, when made, will be available below
Application type
Full Planning Permission
Received
24 Aug 2026
Validated
3 Sept 2026
Determination deadline
28 Oct 2026
Local authority
London Borough of Redbridge

Application overview

Refurbishment of fire damaged building, including a first floor and roof extension and subdivision into two units. Alterations to fenestration. Change of use from a Gymnasium (E(d)) to flexible use comprising General Industrial (B2), Light Industrial (E(g)(iii)) and Storage and Distribution (B8) with associated car parking, EV charging bays, cycle parking, bin and recycling storage, servicing bays and access arrangements. (Summary).

Proposal details

Reference
2234/26
Alternative references
PP-15180008
Ward
Fairlop
Agent
Hekmat
UPRN
100023052056

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 25 of 25

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form24 Aug 2026View
Flood Risk Assessment and Surface Water Drainage StrategyFlood risk assessment24 Aug 2026View
das.pdfDesign and access statement24 Aug 2026View
Outline Travel PlanTravel plan24 Aug 2026View
Environmental Noise AssessmentNoise impact assessment24 Aug 2026View
Transport StatementTransport assessment24 Aug 2026View
Site Waste Management PlanSite waste management plan24 Aug 2026View
PLANNING STATEMENT Comprising:- Statement of Community InvolvementPlanning statement24 Aug 2026View
Preliminary Ecological AppraisalSupporting document24 Aug 2026View
OPEN SPACE, SPORT AND RECREATION ASSESSMENTOpen space assessment24 Aug 2026View
Energy StatementSupporting document24 Aug 2026View
Archaeological Desk-Based AssessmentArchaeological Assessment24 Aug 2026View
AIR QUALITY BASELINE ASSESSMENTAir quality assessment24 Aug 2026View
Daylight & Sunlight AssessmentSunlight/daylight assessment24 Aug 2026View
AFFORDABLE WORKSPACE STATEMENTSupporting document24 Aug 2026View
4586_pl205 - existing elevations - refurb.pdfExisting plan - elevation24 Aug 2026View
4586_pl208 - proposed roof plan - refurb.pdfProposed plan - roof plan24 Aug 2026View
Site planProposed plan24 Aug 2026View
4586_pl201 - location plan - refurb.pdfSite/block plan24 Aug 2026View
4586_pl204 - existing roof plan - refurb.pdfExisting plan - roof plan24 Aug 2026View
4586_pl203 - existing floor plans - refurb.pdfExisting plan - floor plan24 Aug 2026View
Site planExisting plan24 Aug 2026View
ENG1118690 CSLake Forest House Hainault Final v1.pdfFire statement2 Sept 2026View
4586_PL207B Proposed Floor Plans Refurb.pdfProposed plan - floor plan2 Sept 2026View
4586_PL209A Proposed Elevations Refurb.pdfProposed plan - elevation2 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

This application is currently under assessment with a planning officer. The decision, when made, will be available below
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.