Council planning record

Erection of a three storey residential building comprising three (one x 1 bedroom and two x 2 bedroom) self-contained flats with associated cycle storage, waste / refuse storage and amenity space. (Summary).

DEVELOPMENT REAR OF 70 SNAKES LANE EAST IN, HILLSIDE AVENUE, WOODFORD GREEN

This application is currently under assessment with a planning officer. The decision, when made, will be available belowReference: 2145/26London Borough of Redbridge

Last published check: 29 Sept 2026, 09:59. Check the council record for more recent changes.

Application location

DEVELOPMENT REAR OF 70 SNAKES LANE EAST IN, HILLSIDE AVENUE, WOODFORD GREEN

This record has no verified map location.

Application summary

Status
This application is currently under assessment with a planning officer. The decision, when made, will be available below
Application type
Full Planning Permission
Received
14 Aug 2026
Validated
4 Sept 2026
Determination deadline
29 Oct 2026
Local authority
London Borough of Redbridge

Application overview

Erection of a three storey residential building comprising three (one x 1 bedroom and two x 2 bedroom) self-contained flats with associated cycle storage, waste / refuse storage and amenity space. (Summary).

Proposal details

Reference
2145/26
Alternative references
PP-15159355
Ward
Bridge
Agent
Connolly-Townsend
UPRN
10097094878

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 31 of 31

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form14 Aug 2026View
Design and Access Statement (1 of 3 parts) Inc. WMP and Fire StatementDesign and access statement15 Aug 2026View
Design and Access Statement (2 of 3 parts) Inc. WMP and Fire StatementDesign and access statement15 Aug 2026View
Design and Access Statement (3 of 3 parts) Inc. WMP and Fire StatementDesign and access statement15 Aug 2026View
Site location planSite/block plan15 Aug 2026View
form_1_cil_additional_information_hillside rise.pdfCIL supporting document15 Aug 2026View
DRAWING SCHEDULESupporting document15 Aug 2026View
EXISTING SITE PLANExisting plan15 Aug 2026View
EXISTING GROUND FLOOR PLANExisting plan - floor plan15 Aug 2026View
EXISTING EAST ELEVATIONExisting plan - elevation15 Aug 2026View
EXISTING SOUTH ELEVATIONExisting plan - elevation15 Aug 2026View
EXISTING NORTH ELEVATIONExisting plan - elevation15 Aug 2026View
EXISTING WEST ELEVATIONExisting plan - elevation15 Aug 2026View
PROPOSED SITE PLANProposed plan15 Aug 2026View
PROPOSED GROUND FLOOR PLANProposed plan - floor plan15 Aug 2026View
PROPOSED FIRST FLOOR PLANProposed plan - floor plan15 Aug 2026View
PROPOSED SECOND FLOOR PLANProposed plan - floor plan15 Aug 2026View
PROPOSED ROOF PLANProposed plan - roof plan15 Aug 2026View
PROPOSED STREET (EAST) ELEVATIONProposed plan15 Aug 2026View
PROPOSED EAST ELEVATIONProposed plan - elevation15 Aug 2026View
PROPOSED WEST ELEVATIONProposed plan - elevation15 Aug 2026View
PROPOSED NORTH ELEVATIONProposed plan - elevation15 Aug 2026View
PROPOSED SOUTH ELEVATIONProposed plan - elevation15 Aug 2026View
PROPOSED SECTION AAProposed plan15 Aug 2026View
PROPOSED SECTION AAProposed plan15 Aug 2026View
PROPOSED GROUND FLOOR FIRE STRATEGY PLANFire statement15 Aug 2026View
PROPOSED FIRST FLOOR FIRE STRATEGY PLANFire statement15 Aug 2026View
PROPOSED SECOND FLOOR FIRE STRATEGY PLANFire statement15 Aug 2026View
PROPOSED GROUND FLOOR ACCESSIBILITY PLANProposed plan15 Aug 2026View
PROPOSED FIRST FLOOR ACCESSIBILITY PLANProposed plan15 Aug 2026View
PROPOSED SECOND FLOOR ACCESSIBILITY PLANProposed plan15 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

This application is currently under assessment with a planning officer. The decision, when made, will be available below
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.