in accordance with plans ZAAVIA/46CHL/101 issue A, ZAAVIA/46CHL/102 Issue A, ZAAVIA/46CHL/103 Issue A, ZAAVIA/46CHL/104 Issue A, ZAAVIA/46CHL/105 Issue A, ZAAVIA/46CHL/106 Issue A, ZAAVIA/46CHL/107 Issue A, ZAAVIA/46CHL/108 Issue A, ZAAVIA/46CHL/109 Issue A, ZAAVIA/46CHL/110 Issue A, ZAAVIA/46CHL/111 Issue A, ZAAVIA/46CHL/112 Issue A, Reasonable Exception Statement, and Location Plan.
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/ The proposal does not comply with policy and no pre-application discussions were entered into. The applicant is encouraged to seek pre-application advice prior to the submission of any future planning application.
The proposed first floor side extension by reason of its excessive width and design, in combination with the existing two storey side extension, would result in a disproportinate and insubordinate large extension to the property, which would be out of scale and character with the host property as well as neighbouring dwellings. Thus, it is contrary to NPPF Policies L2, DP3 and Local Plan Policy LP30.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.