Council planning record

Installation of a solar photovoltaic (PV) system on the pitched roofs and one flat roof including roof mounted panels and associated electrical connections and mounting structures. (Summary).

167, King George Hospital, Barley Lane, Ilford, IG3 8YB

A decision on this application has been issued.Reference: 1855/26London Borough of Redbridge

Last published check: 30 Sept 2026, 03:17. Check the council record for more recent changes.

Application location

167, King George Hospital, Barley Lane, Ilford, IG3 8YB

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Prior Approval Determination
Received
13 Jul 2026
Validated
14 Jul 2026
Determination deadline
6 Sept 2026
Local authority
London Borough of Redbridge

Application overview

Installation of a solar photovoltaic (PV) system on the pitched roofs and one flat roof including roof mounted panels and associated electrical connections and mounting structures. (Summary).

Proposal details

Reference
1855/26
Alternative references
PP-15081575
Ward
Seven Kings
UPRN
100022195966

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form13 Jul 2026View
Site PlanProposed plan13 Jul 2026View
Site PlanExisting plan13 Jul 2026View
M10548-HUN-ZZ-XX-DR-A-02010-Site Location Plan.pdfSite/block plan13 Jul 2026View
M10548-HUN-ZZ-XX-DR-A-02100-Existing Roof Plan.pdfExisting plan - roof plan13 Jul 2026View
M10548-HUN-ZZ-XX-DR-A-02101-Proposed Roof Plan.pdfProposed plan - roof plan13 Jul 2026View
M10548-HUN-ZZ-XX-DR-A-02201-Existing Elevations.pdfExisting plan - elevation13 Jul 2026View
M10548-HUN-ZZ-XX-DR-A-02202-Existing Elevations.pdfExisting plan - elevation13 Jul 2026View
M10548-HUN-ZZ-XX-DR-A-02301-Proposed Elevations.pdfProposed plan - elevation13 Jul 2026View
M10548-HUN-ZZ-XX-DR-A-02302-Proposed Elevations.pdfProposed plan - elevation13 Jul 2026View
Proposed DetailsProposed plan13 Jul 2026View
Decision Prior Determination PRAPRG_68.pdfDecision notice18 Aug 2026View
20260818T092704.265KGPAOR.pdfOfficer report18 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior Approval Required - Granted
Decision Prior Determination PRAPRG_68.pdf
Planning conditions
  1. in accordance with plans M10548- HUN- ZZ- XX- DR- A- 02010; M10548- HUN- ZZ- XX- DR- A- 02050; M10548- HUN- ZZ- XX- DR- A- 02201; M10548- HUN- ZZ- XX- DR- A- 02202; M10548- HUN- DR- A- 02100; M10548-HUN- ZZ-XX- DR-A-02400; M10548-HUN- ZZ- XX- DR-A-02051; M10548- HUN- ZZ- XX- DR- A- 02302; M10548- HUN- ZZ- XX- DR- A- 02301; and M10548-HUN-DR-A-02101
  2. The proposals constitute permitted development, by virtue of Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 (as amended).
  3. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
  4. The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.