Council planning record

Enlargement of existing ground floor front bay window and construction of a new first floor front bay window including associated alterations to the front elevation. (Summary).

Flat 1 and Flat 3, 349B, Chigwell Road, Woodford Green

A decision on this application has been issued.Reference: 1823/26London Borough of Redbridge

Last published check: 3 Oct 2026, 21:03. Check the council record for more recent changes.

Application location

Flat 1 and Flat 3, 349B, Chigwell Road, Woodford Green

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Full Planning Permission
Received
8 Jul 2026
Validated
4 Aug 2026
Determination deadline
28 Sept 2026
Local authority
London Borough of Redbridge

Application overview

Enlargement of existing ground floor front bay window and construction of a new first floor front bay window including associated alterations to the front elevation. (Summary).

Proposal details

Reference
1823/26
Alternative references
PP-15068509
Ward
Bridge
UPRN
MAN000000000446216

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 16 of 16

DocumentPublishedAction
56-12.pdfExisting plan - elevation8 Jul 2026View
56-13.pdfExisting plan - elevation8 Jul 2026View
56-11.pdfExisting plan - roof plan8 Jul 2026View
Design and Access Staement Revision A.docxDesign and access statement8 Jul 2026View
56-15.pdfProposed plan - roof plan8 Jul 2026View
56-17.pdfProposed plan - elevation8 Jul 2026View
56-16.pdfProposed plan - elevation8 Jul 2026View
349b Chigwell Road-LOC.pdfSite/block plan8 Jul 2026View
349b Chigwell Road-SITE.PLAN. PROPOSEDpdf.pdfSite/block plan8 Jul 2026View
ApplicationFormRedacted_v2.pdfApplication form8 Jul 2026View
5610v2.pdfExisting plan - floor plan13 Jul 2026View
5614v2.pdfProposed plan - floor plan13 Jul 2026View
FIRE SAFETY EXEMPTION 349B CHIGWELL ROAD.docxFire statement13 Jul 2026View
Design and Access Statement Revision B.docxDesign and access statement4 Aug 2026View
645754645753Decision Full FULGC_1386_v1.pdfDecision notice4 Sept 2026View
ApasTemplate_103910.pdfOfficer report4 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted/Approved - with conditions
645754645753Decision Full FULGC_1386_v1.pdf
Planning conditions
  1. The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be carried out in accordance with the following approved plans: 56-10, 56-11, 56-12, 56-13, 56-14, 56-15, 56-16, 56-17, Location Plan, Design & Access Statement, and Planning Fire Safety Statement. Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
  3. The materials to be used in the construction of the external surfaces of the extension(s) hereby permitted shall match those used in the existing building. Reason: In order to ensure that the development has a satisfactory appearance and to comply with LP26 of the Council’s Local Plan.
  4. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
  5. The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.