in accordance with plans P01, P02, P03, P04, P05, and P06
Schedule 2 Part 1 Class E of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - Complies No more than 50% of the curtilage of the original dwelling may be covered by buildings, enclosures and containers – Complies No part of the building, enclosure, pool or container would be situated on land forward of a wall forming the principal elevation of the original dwellinghouse – Complies Must not have more than one storey – Complies Maximum roof height is 4 m if dual pitched – Complies Maximum roof height within 2 m of the boundary is 2.5 m – Complies Maximum roof height is 3 m for all other cases – Complies Height of eaves cannot exceed 2.5 m – Complies Would not be used as a dwelling – Complies Must not involve provision or construction of a veranda, balcony or raised platform or microwave antenna – Complies Must not exceed 3,500 litres if a container – Complies If In a Conservation Area must not be to the side of the dwelling – Complies Not subject to an Article 4 Direction – Complies Not within the curtilage of a Listed Building - Complies Overall Conclusion: Permitted
The proposals constitute permitted development, by virtue of Schedule 2 Article 3, Part 1, Class E of the Town and Country Planning (General Permitted Development) Order 2015 (as amended).
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.