Council planning record

Single storey rear extension with a pitched roof (summary)

224, Manford Way, Chigwell, IG7 4AD

A decision on this application has been issued.Reference: 1776/26London Borough of Redbridge

Last published check: 2 Oct 2026, 10:12. Check the council record for more recent changes.

Application location

224, Manford Way, Chigwell, IG7 4AD

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Householder
Received
6 Jul 2026
Validated
10 Aug 2026
Determination deadline
30 Sept 2026
Local authority
London Borough of Redbridge

Application overview

Single storey rear extension with a pitched roof (summary)

Proposal details

Reference
1776/26
Alternative references
PP-14891157
Ward
Hainault
Agent
Channa
UPRN
100022190169

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form4 Jul 2026View
form_1_cil_additional_information.pdfCIL supporting document4 Jul 2026View
01 PL 224 Manford Way Chigwell IG7 4AD O S MAP.pdfSite/block plan4 Jul 2026View
06 PL 224 Manford Way Chigwell IG7 4AD BLOCK PLAN.pdfSite/block plan4 Jul 2026View
02 PL 224 Manford Way Chigwell IG7 4AD EXIST PLAN.pdfExisting plan - floor plan4 Jul 2026View
03 PL 224 Manford Way Chigwell IG7 4AD EXIST ELEVS.pdfExisting plan - elevation4 Jul 2026View
04 PL 224 Manford Way Chigwell IG7 4AD PROP PLANS.pdfProposed plan - floor plan4 Jul 2026View
05 PL 224 Manford Way Chigwell IG7 4AD PROP ELEVS.pdfProposed plan - elevation4 Jul 2026View
PFSS 224 Manford Way Ilford IG7 4AD.pdfFire statement10 Aug 2026View
20260911T170819.682647083Decision Full Householder FULGC_9303DN.pdfDecision notice11 Sept 2026View
20260911T170434.932ApasTemplate_103793OR.pdfOfficer report11 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted/Approved - with conditions
20260911T170819.682647083Decision Full Householder FULGC_9303DN.pdf
Planning conditions
  1. The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be carried out in accordance with the following approved plans: Fire Safety Strategy, 224MW/PL/SP/01, 224MW/PL/HJ/02, 224MW/PL/HJ/03, 224MW/PL/HJ/04, 224MW/PL/HJ/05, and 224MW/PL/SP/06. Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
  3. The materials to be used in the construction of the external surfaces of the extension(s) hereby permitted shall match those used in the existing building. Reason: In order to ensure that the development has a satisfactory appearance and to comply with LP26 of the Council’s Local Plan.
  4. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
  5. The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.