The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be carried out in accordance with the following approved plans: Existing Block Plan; Proposed Block Plan; A01 Revision 1; A02 Revision 1; Fire Statement; and Site Location Plan. Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
The materials to be used in the construction of the external surfaces of the extension(s) hereby permitted shall match those used in the existing building. Reason: In order to ensure that the development has a satisfactory appearance and to comply with LP26 of the Council’s Local Plan.
The roof area of the single storey extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the Local Planning Authority. Reason: In order to protect the privacy and amenities enjoyed by occupants of neighbouring property and to comply with Policy LP26 of the Council’s Local Plan.
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
Building Regulations The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
National Grid apparatus (contact national grid) Due to the presence of National Grid apparatus in proximity to the applicaton site, you are advised to contact National Grid before any works are carried out to ensure their apparatus are not affected by any of the proposed work. Please contact by telephone 0800 096 3080 or e-mail https://customer.nationalgrid.co.uk/contact-us/contacting-national-grid-electricity-distribution/general-contact-enquiries
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.