The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be carried out in accordance with the following approved plans: M10-1, M10-2, M10-3, M10-4, M10-5, M10-6, M10-7, M10-8, M10-9, EXISTING OS MAP, PROPOSED OS MAP Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
The materials to be used in the construction of the external surfaces of the extension(s) hereby permitted shall match those used in the existing building. Reason: In order to ensure that the development has a satisfactory appearance and to comply with LP26 of the Council’s Local Plan.
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
The proposal must: 1) identify suitably positioned unobstructed outside space: a) for fire appliances to be positioned on b) appropriate for use as an evacuation assembly point 2) be designed to incorporate appropriate features which reduce the risk to life and the risk of serious injury in the event of a fire, including appropriate fire alarm systems and passive and active fire safety measures 3) be constructed in an appropriate way to minimise the risk of fire spread 4) provide suitable and convenient means of escape, and associated evacuation strategy for all building users 5) develop a robust strategy for evacuation which can be periodically updated and published, and which all building users can have confidence in 6) provide suitable access and equipment for firefighting which is appropriate for the size and use of the development Reason: In the interests of fire safety and to ensure the safety of all building users in compliance with Policy D12 of the London Plan.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.