The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be carried out in accordance with the following approved plans: Planning Statement May 2026; Desktop Basement Impact Assessment (BIA) 03/06/2026 31355 R1; Flood map for planning 4 April 2026; Reasonable Exception Statement; Location Plan 06-Jun-2026; EX.00 24.04.26; EX.01 24.04.26; EX.02 24.04.26; EX.03 24.04.26; PR.00 24.04.26; PR.01 24.04.26; PR.02 24.04.26; PR.03 24.04.26; PR.04 24.04.26 Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
The external materials to be used in the construction of the development hereby permitted shall accord with the specification stated in the planning application form submitted with the application unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure the that the development accords with the terms of the application and to ensure that the development has a satisfactory appearance and comply with LP26 of the Council’s Local Plan.
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/ The proposal does not comply with policy and no pre-application discussions were entered into. The applicant is encouraged to seek pre-application advice prior to the submission of any future planning application.
The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
The following advice should be followed regarding the proposed basement: • Basement to be fully waterproofed (tanked) and waterproofing to be tied in to the ground floor slab as appropriate: to reduce the turnaround time for returning the property to full operation after a flood event. • Plaster boards should be installed in horizontal sheets rather than conventional vertical installation methods to minimise the amount of plasterboard that could be damaged in a flood event. • Wall sockets should be raised to as high as is feasible and practicable in order to minimise damage if flood waters inundate the property. Sockets must be fed from the ceiling down. • Any wood fixings on basement / ground floor should be robust and/or protected by suitable coatings in order to minimise damage during a flood event. • The basement waterproofing where feasible should be extended to an appropriate level above existing ground levels. • There should be a small sump area installed within the basement floor in the event that the basement does flood. The sump pump should be fitted with a non-return valve to prevent water backing up into the property should the mains sewer become full. • An 'ACO Drain', or similar approved, should be installed at the base of the ramp down into the basement to prevent surface water run-off from entering the basement area.
The Applicant is encouraged to consider implementing some small sustainable urban drainage systems such as rain gardens or rainwater harvesting butts where possible.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.