The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be carried out in accordance with the following approved plans: Design and Access Statement, Reasonable Exception Statement, 2201 P 0000 Rev 00, 2201 P 000R Rev 00, 2201 P 0001 Rev 00, 2201 P 0002 Rev 00, 2201 P 0010 Rev 00, 2201 P 0020 Rev 00, 2201 P 0100 Rev 01, 2201 P 100R Rev 00, 2201 P 0101 Rev 01, 2201 P 0102 Rev 01, 2201 P 1100 Rev 01, 2201 P 1101 Rev 01, 2201 P 102 Rev 01, 2201 P 1103 Rev 01, 2201 P 0103 Rev 01, 2201 P 0200 Rev 00, 2201 P 0201 Rev 00, 2201 P 1000 Rev 00, 2201 P 1001 Rev 00, 2201 P 1002 Rev 00, 2201 P 1020 Rev 00, 2201 P 1200 Rev 00, 2201 P 1201 Rev 00, Location Plan Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
The external materials to be used in the construction of the development hereby permitted shall accord with the specification stated in the planning application form submitted with the application unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure the that the development accords with the terms of the application and to ensure that the development has a satisfactory appearance and comply with LP26 of the Council’s Local Plan.
Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
During construction of the development hereby permitted, any trees within or near to the site shall be protected in accordance with the requirements of BS 5837 (2012) ‘Trees in Relation to Design, Demolition and Construction’. The protection measures shall be implemented prior to any below ground works, and shall be retained for the entire period of the duration of any work at the site, in connection with the development hereby permitted. In addition, any roots found whilst carrying out construction works shall be dealt with in accordance with BS5837:2012 and Street Works UK vol 4 (Issue 3: 2026). For the pouring of wet concrete for foundations, an impermeable liner is to be installed in accordance with 7.4.4.5 of BS5837:2012, to stop the spread of toxic concrete leachate into the soil rooting environment of the retained tree. Reason: In order to maintain the existing vegetation at the site, which makes an important contribution to the character of the area, and to accord with Policies LP26 and LP38 of the Council’s Local Plan .
Prior to the commencement of the development hereby approved (including all preparatory work), details of any required Access Facilitation Pruning (see BS5837:2012 for definition) shall be submitted to and approved in writing by the Local Planning Authority. The approved tree pruning works shall be carried out in accordance with BS3998:2010. The development thereafter shall be implemented in strict accordance with the approved details. Reason: Required prior to commencement of development to avoid any irreversible damage to retained trees pursuant to section 197 of the Town and Country Planning Act 1990 and to protect and enhance the appearance and character of the site and locality, in accordance with Local Plan Policies LP33 and LP38. The objectives and purposes of this condition are such that it is required to be complied with before commencement. As such, those objectives and purposes would not be met if expressed other than as a pre-commencement condition
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.