Council planning record

Single storey rear extension. Loft conversion with a rear dormer. Hip to gable roof alterations. New window to gable end. Two front roof lights. (Summary).

2, Fairview Gardens, Woodford Green, IG8 7DJ

A decision on this application has been issued.Reference: 1233/26London Borough of Redbridge

Last published check: 4 Oct 2026, 08:05. Check the council record for more recent changes.

Application location

2, Fairview Gardens, Woodford Green, IG8 7DJ

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Cert. Lawfulness Proposed (fasttrack)
Received
8 May 2026
Validated
21 May 2026
Determination deadline
3 Jun 2026
Local authority
London Borough of Redbridge

Application overview

Single storey rear extension. Loft conversion with a rear dormer. Hip to gable roof alterations. New window to gable end. Two front roof lights. (Summary).

Proposal details

Reference
1233/26
Alternative references
PP-14918555
Ward
Churchfields
Agent
Macann
UPRN
100023053653

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
B274145 Fire statement.pdfFire statement8 May 2026View
Flood mapFlood risk assessment8 May 2026View
B274145 Planning statement.pdfPlanning statement8 May 2026View
B274145 Architectural Drawings(Page01).pdfProposed plan8 May 2026View
B274145 Architectural Drawings(Page02).pdfExisting plan8 May 2026View
B274145 EX Site Photos(Page01).pdfPhotographs8 May 2026View
B274145 EX Site Photos(Page02).pdfPhotographs8 May 2026View
B274145 EX Site Photos(Page03).pdfPhotographs8 May 2026View
B274145 EX Site Photos(Page04).pdfPhotographs8 May 2026View
ApplicationFormRedacted_v2.pdfApplication form19 May 2026View
LocationPlan.pdfSite/block plan19 May 2026View
B274145 Existing and Proposed Block Plans.pdfSite/block plan19 May 2026View
2075533_Decision_Certificate_Proposed_FT_CERTPRL.pdfDecision notice21 May 2026View
2fd officer report.pdfOfficer report21 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Press notice start date

    Published milestoneCouncil source
  4. Dispatch date

    Published milestoneCouncil source
  5. Decision date

    Published milestoneCouncil source
  6. Registration date

    Published milestoneCouncil source
  7. Valid date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Lawful
2075533_Decision_Certificate_Proposed_FT_CERTPRL.pdf
Planning conditions
  1. in accordance with plans B274145-1000 A, B274145-1100, B274145-3100 A, Location Plan, Fire Statement, Flood Risk Assessment, Photographs and Planning Statement
  2. Schedule 2 Part 1 Class B of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - complies Must not exceed height of highest part of existing roof – Complies Must not extend beyond the plane of any existing roof slope which forms the principal elevation of the dwellinghouse and fronts a highway - complies Maximum volume is 40m3 for terrace houses and 50 m3 in other cases - Dormer: D3.46 x H2.35 x W5.82/2 = 23.66 Hip to Gable: D7.92 x W4.18 x H2.84 / 6 = 15.67 Total: 39.33<40m3 Must not involve installation, alteration or replacement of a veranda, balcony or raised platform, microwave antenna, chimney, flue or soil and vent pipe- Complies Must not be in a Conservation Area – Complies The materials used in any exterior work shall be of a similar appearance to those used in the construction of the exterior of the existing dwelling house – Complies Any window facing the side should be obscure glazed and non-opening up to 1.7 m above the floor – Complies The roof pitch should match the pitch of the original dwelling as far as practicable – Complies Other than in the case of a hip to gable enlargement, the edge of the enlargement closest to the eaves of the original roof shall, so far as is practicable, be not less than 20cm from the eaves of the original roof – complies Overall Conclusion : Permitted
  3. Schedule 2 Part 1 Class C of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - complies Does not protrude more than 0.15 metres beyond the plane of the slope of the original roof when measured from the perpendicular with the external surface of the original roof– Complies Must not be higher than the highest part of the original roof – Complies Must not include a chimney, flue or soil and vent pipe or solar photovoltaics or solar thermal equipment – Complies Any window facing the side should be obscure glazed and non-opening up to 1.7 metres above the floor of the room in which the window is installed- Complies Sensitively located if in Conservation Area - Not applicable/not in Conservation Area. Overall Conclusion: Permitted
  4. The proposals constitute permitted development, by virtue of Schedule 2 Article 3, Part 1, Classes A,B and C of the Town and Country Planning (General Permitted Development) Order 2015 (as amended).
  5. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
  6. The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
  7. To ensure compliance with Schedule 2 Part 1 Class B of the Town and Country Planning (General Permitted Development Order) (England) 2015, the proposed materials shall match those of the existing roof.
  8. To ensure compliance with Schedule 2 Part 1 Class C of the Town and Country Planning (General Permitted Development Order) (England) 2015, the rooflights shall not protrude from the plane of the slope of the original roof by more than 150mm.
  9. Long description: To ensure compliance with Schedule 2 Part 1 Class B of the Town and Country Planning (General Permitted Development Order) (England) 2015, any window inserted on a wall or roof slope forming a side elevation of the dwellinghouse shall be (i) obscure-glazed, and (ii) non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed.
  10. Schedule 2 Part 1 Class A of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Permission to use the dwellinghouse as a dwellinghouse was not granted only by virtue of Class M, N, P, or Q of Schedule 2 Part 3 (change of use) - complies No more than 50% of the curtilage of original dwelling may be covered by buildings – Complies Must not exceed the height of the highest part of the roof of the existing dwelling – Complies Height of the eaves must not exceed the height of the eaves of the existing dwelling – Complies Must not extend beyond a wall fronting a highway and which is either a principal or side elevation of original dwelling – Complies Must not be more than 4 m deep from the original rear wall of a detached dwelling, or 3 m for all other dwellings – Complies Within 2 m of the boundary, the height of the eaves must not exceed 3 m – Complies No part of extension may exceed 4 m in height – Complies No more than a single storey - complies Must not have a width greater than half the width of the original dwellinghouse - complies Must not involve installation, alteration or replacement of a veranda, balcony or raised platform, microwave antenna, chimney, flue or soil and vent pipe – Complies Must not include an alternation to any part of the roof of the dwellingohouse - complies Except for conservatories, the materials used in any exterior work shall be of a similar appearance to those used in the construction of the exterior of the existing dwelling house – Complies If in a Conservation Area cannot involve recladding the exterior – complies Not subject of an Article 4 Direction – Complies Overall Conclusion : Permitted
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.