Council planning record

Installation of roof-mounted photovoltaic (PV) solar panels and associated electrical connections, mounting equipment and ancillary components required for the renewable energy system to existing dwelling (summary)

38, Gyllyngdune Gardens, Ilford, IG3 9HJ

A decision on this application has been issued.Reference: 0975/26London Borough of Redbridge

Last published check: 2 Oct 2026, 19:22. Check the council record for more recent changes.

Application location

38, Gyllyngdune Gardens, Ilford, IG3 9HJ

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Householder
Received
10 Apr 2026
Validated
8 Jun 2026
Determination deadline
30 Jul 2026
Local authority
London Borough of Redbridge

Application overview

Installation of roof-mounted photovoltaic (PV) solar panels and associated electrical connections, mounting equipment and ancillary components required for the renewable energy system to existing dwelling (summary)

Proposal details

Reference
0975/26
Alternative references
PP-14833396
Ward
Mayfield
Agent
Celik
UPRN
100022216166

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form10 Apr 2026View
Storey Sketch Photo 1_2026-02-06 23_34_06.535596_03c035a8-530a-4070-b029-a28dc2363b4b.jpgExisting plan - floor plan10 Apr 2026View
Rear Elevation Photo_2025-12-30 20_59_48.786567_aea2b0e6-8a97-4723-b290-0b7f175b196b.jpgPhotographs10 Apr 2026View
Solar Energy System ProposalSupporting document10 Apr 2026View
38 Gyllyngdune_A Fire Safety_London Plan Policy D12 A Reasonable Exception Statement.pdfFire statement24 Apr 2026View
blockSite/block plan24 Apr 2026View
38 Gyllyngdune GardensProposed Elevations00853GLA05002 1.pdfProposed plan - elevation24 Apr 2026View
38 Gyllyngdune GardensExisting Elevations00853GLA05001 3.pdfExisting plan - elevation24 Apr 2026View
38 Gyllyngdune Gardens_Heritage Statement.pdfHeritage statement24 Apr 2026View
block planSite/block plan8 May 2026View
locationSite/block plan11 May 2026View
2083998_Decision_Full_Householder_FULGC.pdfDecision notice15 Jul 2026View
0975.26.pdfOfficer report15 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Press notice start date

    Published milestoneCouncil source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  14. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted/Approved - with conditions
2083998_Decision_Full_Householder_FULGC.pdf
Planning conditions
  1. The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be carried out in accordance with the following approved plans: 00853-GLA-050-01, 00853-GLA-050-02, 00853-GLA-050-100-001 Rev X, 00853-GLA-050-100-001 Rev X, Reasonable Exception Statement, Heritage Statement Template, Solar Energy System Proposal Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
  3. The external materials to be used in the construction of the development hereby permitted shall accord with the specification stated in the planning application form submitted with the application unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure the that the development accords with the terms of the application and to ensure that the development has a satisfactory appearance and comply with LP26 of the Council’s Local Plan.
  4. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
  5. The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
  6. Noise emitted from any new fixed building services plant and equipment shall be designed to a level at least 5 dB below the representative existing background noise level when assessed in accordance with BS 4142: 2014 + A1: 2019 at a position 1 m from the window (or a calculation thereof) to the nearest noise sensitive premises (i.e. Plant LAr,T = -5 dB LA90,T) by a Suitably Qualified Acoustician. This criterion applies to the total contribution of noise from all new plant items associated with the Proposed Development that may run during any particular period. The commissioning protocol shall be agreed in writing with the Local Planning Authority in advance of testing and the results shall be submitted to and approved in writing by the Local Planning Authority prior to occupation of the relevant part of the scheme being tested and occupied. Reason: For the condition, to comply with Local Plan Policy LP24 and London Plan policies D13 and D14.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.