Council planning record

Installation of a rear extraction flue. (Summary)

78 80, Cranbrook Road, Ilford, IG1 4NH

A decision on this application has been issued.Reference: 0458/26London Borough of Redbridge

Last published check: 2 Oct 2026, 01:31. Check the council record for more recent changes.

Application location

78 80, Cranbrook Road, Ilford, IG1 4NH

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Full Planning Permission
Received
20 Feb 2026
Validated
18 Jun 2026
Determination deadline
7 Aug 2026
Local authority
London Borough of Redbridge

Application overview

Installation of a rear extraction flue. (Summary)

Proposal details

Reference
0458/26
Alternative references
PP-14718712
Ward
Ilford Town
Agent
Dar
UPRN
100023045959

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form20 Feb 2026View
Extraction and Ventilation report - updated.pdfVentilation or extraction statement20 Feb 2026View
Existing Block Plan.pdfSite/block plan20 Feb 2026View
Location Plan.pdfSite/block plan20 Feb 2026View
Noise Impact Assessment.pdfNoise impact assessment20 Feb 2026View
Fire Statement.pdfFire statement3 Mar 2026View
Proposed Block Plan RevA.pdfSite/block plan18 Jun 2026View
KL139921RevB.pdfCombined plan - floor plan6 Jul 2026View
KL139922RevB.pdfCombined plan - elevation6 Jul 2026View
2093120_Decision_Full_FULGC.pdfDecision notice2 Sept 2026View
2093122_Decision_Full_FULGC.pdfDecision notice2 Sept 2026View
2093124_Decision_Full_FULGC.pdfDecision notice2 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted/Approved - with conditions
2093120_Decision_Full_FULGC.pdf 2093122_Decision_Full_FULGC.pdf 2093124_Decision_Full_FULGC.pdf
Planning conditions
  1. The development shall be carried out in full accordance with all noise and vibration mitigation measures, recommendations and specifications contained within the DAA Group Acoustic Report entitled '78-80 Cranbrook Road, Ilford, IG1 4NH 4th April 2024 ISSUE 01'. The approved measures shall be fully implemented prior to the commencement of the approved use and retained thereafter. Prior to the first operation of any approved plant and equipment, a post-installation acoustic validation report shall be submitted to and approved in writing by the Local Planning Authority. The report shall be prepared by a suitably qualified acoustic consultant and shall demonstrate, through on-site noise measurements and assessment, that the installed plant and equipment comply with the noise criteria, mitigation measures and acoustic performance specified within the approved DAA Group Acoustic Report. Any identified deficiencies shall be remedied and re-tested to the satisfaction of the Local Planning Authority. Where the approved mitigation includes acoustic enclosures, attenuators, anti-vibration equipment, resilient mountings, mechanical plant or other acoustic control measures requiring ongoing maintenance, a maintenance and inspection log shall be maintained by the operator and made available to the Local Planning Authority upon request. The approved measures shall be maintained in accordance with the manufacturer's recommendations and shall remain effective for the lifetime of the development. Reason: To ensure that adequate protection is provided against noise and vibration and to safeguard the amenity of neighbouring occupiers.
  2. The development hereby permitted shall be begun no later than the expiration of three years from the date of this permission. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: KL01399-21, KL-1399-22, PLANNING FIRE SAFETY STRATEGY (PFSS), NOISE IMPACT ASSESSMENT, EXISTING BLOCK PLAN, PROPOSED BLOCK PLAN, LOCATION PLAN, KITCHEN EXTRACTION & ODOUR CONTROL SYSTEM PROPOSAL Reason: In order to facilitate the use of section 73 of the Town and Country Planning Act 1990 to make minor material amendments to this planning permission.
  4. The external materials to be used in the construction of the development hereby permitted shall accord with the specification stated in the planning application form submitted with the application unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure the that the development accords with the terms of the application and to ensure that the development has a satisfactory appearance and comply with LP26 of the Council’s Local Plan.
  5. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/
  6. The applicant should be aware that Building Regulations approval will be required for most types of building work. Please see information and how to apply for Building Regulation consent at: https://www.redbridge.gov.uk/planning-and-building/building-control/ or for further assistance contact the Building Control Section. e-mail: Buildingcontrol@redbridge.gov.uk Telephone: 020 8708 2529.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.