Council planning record

Change of use from dwellinghouse (C3) to a large HMO (Sui Generis) for a maximum of 9 people with associated waste/refuse, cycle store and car parking (summary)

32, Avondale Crescent, Ilford, IG4 5JB

A decision on this application has been issued.Reference: 0320/26London Borough of Redbridge

Last published check: 4 Oct 2026, 13:17. Check the council record for more recent changes.

Application location

32, Avondale Crescent, Ilford, IG4 5JB

This record has no verified map location.

Application summary

Status
A decision on this application has been issued.
Application type
Full Planning Permission
Received
4 Feb 2026
Validated
20 May 2026
Determination deadline
9 Jul 2026
Local authority
London Borough of Redbridge

Application overview

Change of use from dwellinghouse (C3) to a large HMO (Sui Generis) for a maximum of 9 people with associated waste/refuse, cycle store and car parking (summary)

Proposal details

Reference
0320/26
Alternative references
PP-14674630
Ward
Clayhall
Agent
williams
UPRN
100022195239

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 18 of 18

DocumentPublishedAction
ApplicationFormRedacted.pdfApplication form4 Feb 2026View
BL_DRG_3680.5_01 - Location Plan 1-1250.pdfSite/block plan4 Feb 2026View
BL_DRG_3680.5_02 - Existing and Proposed Site Plan 1-500.pdfSite/block plan4 Feb 2026View
BL_DRG_3680.5_03 - Existing Plans.pdfExisting plan - floor plan4 Feb 2026View
BL_DRG_3680.5_04 - Existing Elevations and Sections.pdfExisting plan - floor plan4 Feb 2026View
BL_DRG_3680.5_05 - Proposed Plans.pdfProposed plan - floor plan4 Feb 2026View
BL_DRG_3680.5_06 - Proposed Elevations and Sections.pdfProposed plan - floor plan4 Feb 2026View
3351_24_Decision_Full_Householder_FULGC.pdfSupporting document4 Feb 2026View
3359_24_Decision_Certificate_Proposed_CERTPRL.pdfSupporting document4 Feb 2026View
BL_DRG_3680.5 - Fire Strategy Statement.pdfFire statement4 Feb 2026View
HMO Management PlanSupporting document4 Feb 2026View
BL_DRG_3680.5 - Planning_CIL Form.pdfCIL supporting document4 Feb 2026View
BL_DRG_3680.5 - Design Access Planning Statement.pdfDesign and access statement4 Feb 2026View
Cycle StorageSupporting document4 Feb 2026View
BL_DRG_3680.5 - Waste Management Plan.pdfSite waste management plan4 Feb 2026View
BL_DRG_3680.5 - Site Photos.pdfPhotographs4 Feb 2026View
2083347_Decision_Full_FULR.pdfDecision notice9 Jul 2026View
ApasTemplate_103195.pdfOfficer report9 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refuse Permission/Consent
3351_24_Decision_Full_Householder_FULGC.pdf 3359_24_Decision_Certificate_Proposed_CERTPRL.pdf 2083347_Decision_Full_FULR.pdf
Planning conditions
  1. in accordance with plans BL/DRG/3680.5/ 01, BL/DRG/3680.5/ 02, BL/DRG/3680.5/ 03, BL/DRG/3680.5/ 04, BL/DRG/3680.5/ 05, BL/DRG/3680.5/ 06, Design and Access Statement, Waste Management Plan, HMO Management Plan, and Supporting document.
  2. The proposed development would result in the loss of a family-sized dwelling that makes a positive contribution towards meeting the Borough's identified housing needs, without providing any mitigation for the loss of this accommodation in a location considered unsuitable for such a form of development, as the site is not located within a Metropolitan, District or Local Centre as identified in the Local Plan. The change of use of the dwelling would therefore fail to preserve the established character of the area and would undermine the Council's objective of retaining family housing stock. Accordingly, the proposal is contrary to Policies LP5, LP6 and LP26 of the Redbridge Local Plan, and the housing needs identified in the Strategic Housing Market Assessment (SHMA) 2024.
  3. The proposal would result in an intensification of the use of the property detrimentally impacting on the amenity of surrounding residents from increased noise, disturbance and general activity associated with the use as a large HMO. As a result, the proposal is contrary to Policies LP5, LP6, and LP26 of the Council's Local Plan, and D14 of the London Plan.
  4. In the absence of sufficient supporting evidence to demonstrate to the contrary, specifically an accurate Off-street Parking Survey, the proposed large HMO, due to its occupancy, would be likely to have a material impact on local parking stress. Thus, the proposal would be contrary to Policies LP6 and LP23 of the Local Plan, Policy T2 of the London Plan, and paragraph 116 of the National Planning Policy Framework (December 2024).
  5. In the absence of appropriate mitigation, the proposal would have an unacceptable impact the Epping Forest SAC, and as such it is contrary to Policy LP39 of the Council's Local Plan.
  6. The gross internal floor area of the property to be converted is less than 180 square metres, Council considers to be inappropriate for sub-division into a large house of multiple occupation (HMO) which fails to comply with criterion 2(a) of Policy LP6 of the Local Plan.
  7. The proposed HMO by reason of its inadequate provision and size of shared communal facilities would fall below the minimum standard required for a 9-person HMO moreover, the proposed development by reason of the insufficient outlook and daylight/sunlight to Bedroom 1. As a result, the development would provide substandard living accommodation for future occupiers, contrary to the Council's Housing Design Supplementary Planning Document, Policies LP26 and LP29 of the Redbridge Local Plan, and Policy D6 of the London Plan.
  8. Redbridge Planning Service adopts a positive and proactive approach when engaging with applicants/agents in line with the National Planning Policy Framework. We encourage engagement with the pre-application service to avoid delays in the planning process. https://www.redbridge.gov.uk/planning-and-building/planning/ The proposal does not comply with policy and no pre-application discussions were entered into. The applicant is encouraged to seek pre-application advice prior to the submission of any future planning application.
  9. The proposal by reason of the insufficient Gross Internal Area (GIA) to be provided for the self-contained unit (Bedroom 5), would result in sub-standard quality of residential accommodation, which would be detrimental to the amenities enjoyed by prospective occupants of this development as well as being out of character with the prevailing pattern of the development in the surrounding area. Thus, it is contrary to Policy LP6 part 1 criteria (e); Policy LP29 of the Local Plan; Policy D6 of the London Plan; Nationally Described Space Standard and Paragraph 130 and 135 of the NPPF.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.