Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land At Former EMR Site Bidder Street Canning Town London E16 4ST
Last published check: 28 Sept 2026, 05:46. Check the council record for more recent changes.
Land At Former EMR Site Bidder Street Canning Town London E16 4ST
This record has no verified map location.
View council mapNon-material amendment to planning consent ref: 24/00088/FUL dated 14th April 2025, comprising amendments to the architectural and landscape strategy drawings.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| APPLICATIONFORMREDACTEDApplication Form (Public) · PDF | 21 Aug 2026 | View |
| EIA STATEMENT OF CONFORMITYDrawing · PDF | 21 Aug 2026 | View |
| DESIGN STATEMENTDocumentation · PDF | 21 Aug 2026 | View |
| LANDSCAPE ILLUSTRATIVE MASTERPLANDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENTS KEY PLANDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENTS SHEET 3 OF 3Drawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENTS SHEET 2 OF 3Drawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT SHEETS 1 OF 3Drawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT ELEVATIONS DC ELEVATION INTERNAL NORTH-WESTDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT ELEVATIONS DC, PB AND EC ELEVATION FROM BIDDER STREETDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT ELEVATIONS ELEVATIONS WITH SURROUNDING FUTURE DEVELOPMENTSDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT ELEVATIONS PB ELEVATION INTERNAL SOUTH-EASTDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT ELEVATIOND PB ELEVATION FROM SEGRO SITE NORTH WESTDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT ELEVATIONS DC ELEVATION FROM YARD AREA SOUTH-EASTDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT SECTIONS SECTION D-DDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT ELEVATIONS, DC, PB AND EC ELEVATION FROM RIVERSIDEDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT SECTIONS SECTION A-A, B-B AND C-CDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/PB LEVEL 08 EC ROOFDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/PB LEVEL 10 ROOFTOP PLANT LEVEL 02Drawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/PB LEVEL 11 ROOFDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/PB/EC LEVEL 03Drawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/PB LEVEL 09 ROOFTOP PLANT LEVEL 01Drawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/PB LEVEL 04-07 TYPICAL EC LEVEL 04Drawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/PB/EC LEVEL 02Drawing · PDF | 21 Aug 2026 | View |
| PROPOSED SITE PLANDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS - DC/PB/EC LEVEL 00 +1.7M AODDrawing · PDF | 21 Aug 2026 | View |
| GENERAL ARRANGEMENT PLANS DC/OB/EC LEVEL 01 +5.38M AODDrawing · PDF | 21 Aug 2026 | View |
| COVER LETTERDocumentation · PDF | 21 Aug 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.