Council planning record

Full planning application for the retrofit installation of a renewable energy microgrid management system, including the erection of five roof-mounted vertical axis wind turbines, associated controls equipment, a maintenance platform and access stairs on the existing roof terrace. (This application site is affecting setting of Grade II Listed Buildings - Central Buffet at Custom House and Dock Managers Offices)

London Design And Engineering University Technical College 15 University Way Beckton London E16 2RD

Not publishedReference: 26/01000/FULLondon Borough of Newham

Last published check: 28 Sept 2026, 11:35. Check the council record for more recent changes.

Application location

London Design And Engineering University Technical College 15 University Way Beckton London E16 2RD

This record has no verified map location.

View council map

Application summary

Status
Not published
Application type
Full Planning Permission
Received
Not published
Validated
6 May 2026
Determination deadline
Not published
Local authority
London Borough of Newham

Application overview

Full planning application for the retrofit installation of a renewable energy microgrid management system, including the erection of five roof-mounted vertical axis wind turbines, associated controls equipment, a maintenance platform and access stairs on the existing roof terrace. (This application site is affecting setting of Grade II Listed Buildings - Central Buffet at Custom House and Dock Managers Offices)

Proposal details

Reference
26/01000/FUL
Ward
Royal Albert
Parish
Royal Docks Community Forum
Agent
Maddox and Associates Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
REPORTDocumentation · PDF23 Jul 2026View
DECISIONDecision · PDF23 Jul 2026View
REVISED DESIGN AND ACCESS DOCUMENTRevised Documentation · PDF17 Jul 2026View
APPLICATIONFORMREDACTEDApplication Form (Public) · PDF7 May 2026View
PROPOSED GROUND FLOOR PLANDrawing · PDF7 May 2026View
PROPOSED FIRST FLOOR PLANDrawing · PDF7 May 2026View
PROPOSED SECOND FLOOR PLANDrawing · PDF7 May 2026View
PROPOSED THIRD FLOOR PLANDrawing · PDF7 May 2026View
PROPOSED ROOF PLANDrawing · PDF7 May 2026View
SITE LOCATION PLANDrawing · PDF7 May 2026View
PROPOSED SITE BLOCK PLANDrawing · PDF7 May 2026View
EXISTING ELEVATIONS - SHEET 1Drawing · PDF7 May 2026View
PROPOSED ELEVATIONS - SHEET 1Drawing · PDF7 May 2026View
PROPOSED ELEVATIONS - SHEET 2Drawing · PDF7 May 2026View
PROPOSED SECTIONSDrawing · PDF7 May 2026View
WIND TURBINES UTC - ENERGY STATEMENTDocumentation · PDF7 May 2026View
NOISE IMPACT ASSESSMENTDocumentation · PDF7 May 2026View
LONDON DESIGN AND ENGINEERING - PLANNING STATEMENTDocumentation · PDF7 May 2026View
R01-SW-CONSTRUCTION LOGISTICS PLAN F1 (260429)Documentation · PDF7 May 2026View
EXTENSION OF TIME CONFIRMATIONCorrespondence1 Jan 1900View
LOCAL LEAD FLOOD AUTHORITYConsultee Comment1 Jan 1900View
LBN TRANSPORTATION COMMENTSConsultee Comment1 Jan 1900View
LBN ENVIRONMENTAL HEALTH COMMENTSConsultee Comment1 Jan 1900View
HISTORIC ENGLAND COMMENTSConsultee Comment1 Jan 1900View
HISTORIC ENGLAND GLAAS COMMENTConsultee Comment1 Jan 1900View
LONDON CITY AIRPORT COMMENTSConsultee Comment · PDF1 Jan 1900View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Validated

    Published milestoneCouncil source
  2. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Approve
DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.