Council planning record

Refurbishment and extension of existing buildings, including a four-storey extension, change of upper-floor commercial space (Class E) to residential (Class C3), reconfiguration of existing 3 units, subdivision of the ground-floor commercial unit into two Class E units with a new entrance, and external works including repair and refurbishment of the existing facade, cycle parking, refuse storage, and access to provide 14 residential units.

Land At 774 To 778 Barking Road Plaistow London E13 9PJ

Not publishedReference: 26/00876/FULLondon Borough of Newham

Last published check: 27 Sept 2026, 17:34. Check the council record for more recent changes.

Application location

Land At 774 To 778 Barking Road Plaistow London E13 9PJ

This record has no verified map location.

View council map

Application summary

Status
Not published
Application type
Full Planning Permission
Received
Not published
Validated
16 Jun 2026
Determination deadline
Not published
Local authority
London Borough of Newham

Application overview

Refurbishment and extension of existing buildings, including a four-storey extension, change of upper-floor commercial space (Class E) to residential (Class C3), reconfiguration of existing 3 units, subdivision of the ground-floor commercial unit into two Class E units with a new entrance, and external works including repair and refurbishment of the existing facade, cycle parking, refuse storage, and access to provide 14 residential units.

Proposal details

Reference
26/00876/FUL
Ward
Plaistow South
Parish
Plaistow Community Forum
Agent
MJP Planning Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 53 of 53

DocumentPublishedAction
APPLICANT'S RESPONSE ON DISABLED PERSONS PARKINGCorrespondence · PDF14 Aug 2026View
SITE NOTICEPhoto13 Aug 2026View
SITE NOTICEPhoto13 Aug 2026View
SITE NOTICEPhoto13 Aug 2026View
SITE NOTICEPhoto13 Aug 2026View
ENERGY STATEMENTRevised Documentation · PDF7 Aug 2026View
QUINTIC VIABILITY REVIEWDocumentation · PDF5 Aug 2026View
PROPOSED REAR ELEVATIONRevised Drawing · PDF5 Aug 2026View
PROPOSED THIRD FLOOR PLANRevised Drawing · PDF5 Aug 2026View
PROPOSED SECOND FLOOR PLANRevised Drawing · PDF5 Aug 2026View
PROPOSED FIRST FLOOR PLANRevised Drawing · PDF5 Aug 2026View
PROPOSED GROUND FLOOR PLANRevised Drawing · PDF5 Aug 2026View
REFERENCE PHOTO OF ALUMINIUM ROUND PIPE COVERPhoto5 Aug 2026View
PROPOSED BARKING ROAD ELEVATIONDrawing · PDF24 Jun 2026View
PROPOSED REAR ELEVATIONSuperseded · PDF24 Jun 2026View
PROPOSED BOUNDARY ROAD ELEVATIONDrawing · PDF24 Jun 2026View
PROPOSED SECTION A-ADrawing · PDF24 Jun 2026View
PROPOSED END ELEVATIONDrawing · PDF24 Jun 2026View
PROPOSED SECTION B-BDrawing · PDF24 Jun 2026View
PROPOSED SITE PLANDrawing · PDF24 Jun 2026View
LOCATION PLANDrawing · PDF24 Jun 2026View
BIODIVERSITY STATEMENTDocumentation · PDF16 Jun 2026View
EMPLOYMENT STRATEGYDocumentation · PDF16 Jun 2026View
URBAN GREENING FACTORDrawing · PDF14 May 2026View
PROPOSED ROOF PLANDrawing · PDF14 May 2026View
PROPOSED THIRD FLOOR PLANSuperseded · PDF14 May 2026View
PROPOSED SECOND FLOOR PLANSuperseded · PDF14 May 2026View
PROPOSED FIRST FLOOR PLANSuperseded · PDF14 May 2026View
PROPOSED GROUND FLOOR PLANSuperseded · PDF14 May 2026View
PROPOSED BASEMENT FLOOR PLANDrawing · PDF14 May 2026View
APPLICATIONFORMREDACTEDApplication Form (Public) · PDF21 Apr 2026View
EXISTING PLANS, ELEVATIONS AND SECTIONSDrawing · PDF21 Apr 2026View
SITE LOCATION PLAN, PROPOSED PLANS, ELEVATIONS AND SECTIONSSuperseded · PDF21 Apr 2026View
AIR QUALITY ASSESSMENTDocumentation · PDF21 Apr 2026View
DESIGN AND ACCESS STATEMENTDocumentation · PDF21 Apr 2026View
DAYLIGHT AND SUNLIGHT REPORTDocumentation · PDF21 Apr 2026View
ENERGY AND SUSTAINABILTY STATEMENTSuperseded · PDF21 Apr 2026View
APPENDIX A - CALCULATIONDocumentation · PDF21 Apr 2026View
APPENDIX BDocumentation · PDF21 Apr 2026View
APPENDIX CDocumentation · PDF21 Apr 2026View
APPENDIX DDocumentation21 Apr 2026View
FIRE STATEMENTDocumentation · PDF21 Apr 2026View
FLOOD RISK ASSESSMENTDocumentation · PDF21 Apr 2026View
NOISE ASSESSMENTDocumentation · PDF21 Apr 2026View
PLANNING STATEMENTDocumentation · PDF21 Apr 2026View
TRANSPORT STATEMENTDocumentation · PDF21 Apr 2026View
FINANCIAL VIABILTY STATEMENTDocumentation · PDF21 Apr 2026View
SITE LOCATION PLANDrawing · PDF21 Apr 2026View
VIABILITY REPORT - APPENDIX 2 TURNOR MORUM APPRAISAL ANALYSISDocumentation · PDF21 Apr 2026View
VIABILITY REPORT - APPENDIX 3 MARKET REVENUE EVIDENCEDocumentation · PDF21 Apr 2026View
VIABILITY REVIEW - APPENDIX 4 BUILD COST PLANDocumentation · PDF21 Apr 2026View
VIABILITY REPORT - APPENDIX 5 EUV EVIDENCEDocumentation · PDF21 Apr 2026View
VIABILITY REPORT - APPENDIX 5 TURNER MORUMDocumentation · PDF21 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Validated Date

    Published milestoneCouncil source

Decision & conditions

Not published
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.