Council planning record

Details submitted pursuant to planning permission DC/24/135192 dated 15th October 2025 at Scott House, 185 Grove Street SE8 to discharge the following Conditions:-19(a)-Architectural Details22(a)-Frontages23(a)-Refuse and Recycling Facilities24(a)-Cycle Parking28(a)-Bird and Bat Boxes39(a)-Secured by Design52-Roof Details55(a)-Cycle Welfare Facilities (Workspace)60-Fire Statement

SCOTT HOUSE, 185 GROVE STREET, LONDON, SE8 3SH

RegisteredReference: DC/26/144204London Borough of Lewisham

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Registered
Application type
Approval of Details (Following Full PP)
Received
2 Jun 2026
Validated
3 Jun 2026
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

Details submitted pursuant to planning permission DC/24/135192 dated 15th October 2025 at Scott House, 185 Grove Street SE8 to discharge the following Conditions:-19(a)-Architectural Details22(a)-Frontages23(a)-Refuse and Recycling Facilities24(a)-Cycle Parking28(a)-Bird and Bat Boxes39(a)-Secured by Design52-Roof Details55(a)-Cycle Welfare Facilities (Workspace)60-Fire Statement

Proposal details

Reference
DC/26/144204
Alternative references
PP-14963638
Ward
Evelyn

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

SCOTT HOUSE, 185 GROVE STREET, LONDON, SE8 3SH

This record has no verified map location.

View council map

Documents 44 of 44

DocumentPublishedAction
Covering letterCase Copy Documents · PDF3 Jun 2026View
Typical external wall ground detailsCase Copy Drawings · PDF3 Jun 2026View
Typical external wall ground detailsCase Copy Drawings · PDF3 Jun 2026View
Typical external wall section detailstypicalCase Copy Drawings · PDF3 Jun 2026View
Typical retained facade details - blocked-up openingsCase Copy Drawings · PDF3 Jun 2026View
Typical floor-spandrel junctionsCase Copy Drawings · PDF3 Jun 2026View
Typical external wall section detailsCase Copy Drawings · PDF3 Jun 2026View
Typical external wall section details - baseCase Copy Drawings · PDF3 Jun 2026View
Typical external wall plan details - groundCase Copy Drawings · PDF3 Jun 2026View
Architectural metalwork - window screen and brise soleilCase Copy Drawings · PDF3 Jun 2026View
Typical external wall section details l03 terraceCase Copy Drawings · PDF3 Jun 2026View
Typical main entrance section detailsCase Copy Drawings · PDF3 Jun 2026View
Bay type bCase Copy Drawings · PDF3 Jun 2026View
Typical external wall section details tower baseCase Copy Drawings · PDF3 Jun 2026View
Typical external wall section details 2 - tower baseCase Copy Drawings · PDF3 Jun 2026View
D03 delivery & servicing planCase Copy Documents · PDF3 Jun 2026View
Bay type aCase Copy Drawings · PDF3 Jun 2026View
Bay type eCase Copy Drawings · PDF3 Jun 2026View
Main entrance porch - soffit detailsCase Copy Drawings · PDF3 Jun 2026View
Main entrance porch - plan detailsCase Copy Drawings · PDF3 Jun 2026View
Sector elevation southCase Copy Drawings · PDF3 Jun 2026View
Sector elevation westCase Copy Drawings · PDF3 Jun 2026View
General arrangement plan - basement level -01Case Copy Drawings · PDF3 Jun 2026View
Setting out plan - level 001Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - level 01Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - level 02Case Copy Drawings · PDF3 Jun 2026View
Wb biodiversity products brochureCase Copy Documents · PDF3 Jun 2026View
Access control strategy plan - level 31Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - basement 01p10Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - basement 02p10Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - levels 05-27Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - levels 29-30Case Copy Drawings · PDF3 Jun 2026View
Secured by design correspondence summaryCase Copy Documents3 Jun 2026View
Access control strategy plan - level 00Case Copy Drawings · PDF3 Jun 2026View
General arrangement plan - roof levelCase Copy Drawings · PDF3 Jun 2026View
Level 31 amenity and plant roof internal elevationsCase Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - level 03Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - level 04Case Copy Drawings · PDF3 Jun 2026View
Access control strategy plan - level 28Case Copy Drawings · PDF3 Jun 2026View
General arrangement plan - level 01Case Copy Drawings · PDF3 Jun 2026View
General arrangement plan - level 02Case Copy Drawings · PDF3 Jun 2026View
Fire strategy reportCase Copy Documents · PDF3 Jun 2026View
General arrangement plan - level 00Case Copy Drawings · PDF3 Jun 2026View
Application formApplication Form · PDF3 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.