Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
CATFORD TIMBER YARD, 161 RUSHEY GREEN, LONDON, SE6 4BD
Council milestones and published deadlines. A deadline passing does not confirm a decision.
An application submitted under Section 96A of the Town and Country Planning Act 1990 for a Non-Material Amendment in connection with planning permission ref.DC/20/117525, dated 10 August 2021 (as amended by (DC/22/135527 and DC/25/131854) comprising amendments to the approved drawings to reflect detailed design development and to ensure compliance with updated BS9991 fire safety guidance, including revisions to site wide layput, ground floor layout including commercial units, internal flat layouts, building core, means of escape, and associated servicing arrangements and other works at Catford Timber Yard, 161 Rushey Green, SE6.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsCATFORD TIMBER YARD, 161 RUSHEY GREEN, LONDON, SE6 4BD
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Wcu - flat type 7Case Copy Drawings · PDF | 23 Sept 2026 | View |
| Whu flat type 5Case Copy Drawings · PDF | 23 Sept 2026 | View |
| Wcu - flat type 1Case Copy Drawings · PDF | 23 Sept 2026 | View |
| Site location planCase Copy Drawings · PDF | 23 Sept 2026 | View |
| Section bbCase Copy Drawings · PDF | 23 Sept 2026 | View |
| Section aaCase Copy Drawings · PDF | 23 Sept 2026 | View |
| Existing site wide gaCase Copy Drawings · PDF | 23 Sept 2026 | View |
| Ground floor planCase Copy Drawings · PDF | 23 Sept 2026 | View |
| Exisitng site location planCase Copy Drawings · PDF | 23 Sept 2026 | View |
| Proposed site wide gaCase Copy Drawings · PDF | 23 Sept 2026 | View |
| Decision noticeCase Copy Documents · PDF | 8 May 2026 | View |
| Approved plansCase Copy Drawings · PDF | 8 May 2026 | View |
| Nma comparisonCase Copy Drawings · PDF | 1 May 2026 | View |
| Application formApplication Form · PDF | 20 Apr 2026 | View |
| Covering letterCase Copy Documents · PDF | 20 Apr 2026 | View |
| Site wide general arrangemenSuperseded Document · PDF | 20 Apr 2026 | View |
| East & north elevationsCase Copy Drawings · PDF | 20 Apr 2026 | View |
| South & west elevationsCase Copy Drawings · PDF | 20 Apr 2026 | View |
| Roof planCase Copy Drawings · PDF | 20 Apr 2026 | View |
| Ninth floor planCase Copy Drawings · PDF | 20 Apr 2026 | View |
| Fourth to eigth floor planCase Copy Drawings · PDF | 20 Apr 2026 | View |
| Third floor planCase Copy Drawings · PDF | 20 Apr 2026 | View |
| Second floor planCase Copy Drawings · PDF | 20 Apr 2026 | View |
| First floor planCase Copy Drawings · PDF | 20 Apr 2026 | View |
| Ground floor planSuperseded Document · PDF | 20 Apr 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.