Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
41-43 BEADNELL ROAD, LONDON, SE23 1AA
Last published check: 1 Oct 2026, 02:28. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceAn application submitted under Section 73 of the Town & Country Planning Act 1990 for a Minor Material Amendment in connection with the planning permission DC/25/140640 dated 4 November 2025 (as amended by Non-material applicaiton DC/25/14238) for the variation of Condition (2) Approved Plans in order to allow: the subdivision of Unit 6 into one 1b2p unit (Unit 6) and one 1b2p unit (Unit 7); the addition of one new ASHP, the relocation of the refuse store to the front of the site; and the updated arrangement of cycle storage. All other aspects of the development remain in accordance with the approved planning permission, with no material change to the overall scale, massing, height, footprint or appearance of the development at 41-43 Beadnell Road SE23.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details41-43 BEADNELL ROAD, LONDON, SE23 1AA
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Roof & pv planCase Copy Drawings · PDF | 22 May 2026 | View |
| Third floor planCase Copy Drawings · PDF | 22 May 2026 | View |
| Second floor planCase Copy Drawings · PDF | 22 May 2026 | View |
| Accomdation scheduleCase Copy Drawings · PDF | 22 May 2026 | View |
| Delegated reportOfficer Report · PDF | 22 May 2026 | View |
| Eot confirmationCase Copy Drawings · PDF | 13 May 2026 | View |
| Jjv viability reviewCase Copy Drawings · PDF | 12 May 2026 | View |
| Approved plans - proposed_courtyard_east_elevationCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed_courtyard_west_elevationCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed east elevation (facade)Case Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed_first_floor_planCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed_ground_floor_planCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed_north_elevation_planCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed_rear_east_elevationCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed_second_floor_planCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - proposed_third_floor_planCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans - roof___pv_planCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans -sectionCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Approved plans -site_and_proposed_location_planCase Copy Drawings · PDF | 24 Feb 2026 | View |
| Proposed ground floor planCase Copy Drawings · PDF | 19 Feb 2026 | View |
| Proposed east elevation (facade)Case Copy Drawings · PDF | 19 Feb 2026 | View |
| Ground floor planCase Copy Drawings · PDF | 19 Feb 2026 | View |
| First floor planCase Copy Drawings · PDF | 19 Feb 2026 | View |
| Planning statementCase Copy Documents · PDF | 19 Feb 2026 | View |
| Proposed east elevation (facade)Case Copy Drawings · PDF | 19 Feb 2026 | View |
| Proposed first floor planCase Copy Drawings · PDF | 19 Feb 2026 | View |
| Application formApplication Form · PDF | 19 Feb 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.