Council planning record

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission (DC/23/133922) dated 7 April 2025, for the variation of Condition (2) Approved plans in order to allow:- Reconfiguration of the building footprint, ensuring it remains setback 1.5m from the northern and eastern boundaries at 6 Mantle Road SE4. The wording of Condition 9 (Residential Refuse and Recycling Facilities), Condition 10 (Residential Cycle Parking) and Condition 20 (Use Class Restriction - Ground Floor Commercial) would be updated to reflect the proposed changes.

6 MANTLE ROAD, LONDON, SE4 2EX

DecidedReference: DC/25/142244London Borough of Lewisham

Application location

6 MANTLE ROAD, LONDON, SE4 2EX

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non Material Amendments
Received
25 Nov 2025
Validated
26 Nov 2025
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission (DC/23/133922) dated 7 April 2025, for the variation of Condition (2) Approved plans in order to allow:- Reconfiguration of the building footprint, ensuring it remains setback 1.5m from the northern and eastern boundaries at 6 Mantle Road SE4. The wording of Condition 9 (Residential Refuse and Recycling Facilities), Condition 10 (Residential Cycle Parking) and Condition 20 (Use Class Restriction - Ground Floor Commercial) would be updated to reflect the proposed changes.

Proposal details

Reference
DC/25/142244
Alternative references
PP-14510299
Ward
Telegraph Hill
Agent
Interface PDM Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
Delegated reportOfficer Report · PDF23 Dec 2025View
Decision noticeDecision · PDF23 Dec 2025View
Proposed wheelchair layoutsCase Copy Drawings · PDF26 Nov 2025View
Comparison accommodation scheduleCase Copy Documents · PDF26 Nov 2025View
Cover letterCase Copy Documents · PDF26 Nov 2025View
Proposed floor & block plans, elevations & sectionsCase Copy Drawings · PDF26 Nov 2025View
Approved proposed plans, elevations & sectionsCase Copy Drawings · PDF26 Nov 2025View
Approved wheelchair layoutsCase Copy Drawings · PDF26 Nov 2025View
Proposed typical flat layoutsCase Copy Drawings · PDF26 Nov 2025View
Approved flat type layoutsCase Copy Drawings · PDF26 Nov 2025View
Application formApplication Form · PDF26 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Granted
Decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.