Council planning record

Listed Building Consent for the change of use of the Clarendon Hotel, 8-16 Montpelier Row, SE13 from Hotel (C1) to Specialist Older Persons' Accommodation (C3). External alterations include demolition of existing rear additions, repair and restoration of facades and windows, addition of glazed links between listed building and proposed new development. Internal alterations comprise retention of all heritage fabric identified, removal of non-heritage fabric and partitions, localised demolition of floor plates to enable introduction of lifts, double height space, and new apartment layouts.

CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW

RegisteredReference: DC/25/141522London Borough of Lewisham

Last published check: 8 Oct 2026, 09:24. Check the council record for more recent changes.

Application location

CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Listed Building Consent
Received
19 Sept 2025
Validated
31 Oct 2025
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

Listed Building Consent for the change of use of the Clarendon Hotel, 8-16 Montpelier Row, SE13 from Hotel (C1) to Specialist Older Persons' Accommodation (C3). External alterations include demolition of existing rear additions, repair and restoration of facades and windows, addition of glazed links between listed building and proposed new development. Internal alterations comprise retention of all heritage fabric identified, removal of non-heritage fabric and partitions, localised demolition of floor plates to enable introduction of lifts, double height space, and new apartment layouts.

Proposal details

Reference
DC/25/141522
Ward
Blackheath
Agent
DP9 Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 232 of 232

DocumentPublishedAction
Consultee responseCase Copy Documents · PDF28 Nov 2025View
Authorisation to determine an application for listed building consentCase Copy Documents · PDF28 Nov 2025View
Consultee responseCase Copy Documents · PDF28 Nov 2025View
Authorisation to determineCase Copy Documents · PDF26 Nov 2025View
Consultee responseCase Copy Documents · PDF23 Nov 2025View
Clarendon hotel elements of heritage significanceCase Copy Documents5 Nov 2025View
Method statements and schedule of works to listed buildingsCase Copy Documents · PDF5 Nov 2025View
Proposed detail study - double height spaceCase Copy Drawings · PDF5 Nov 2025View
Existing detail study - double height spaceCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - level b1: basementCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - roofCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - third florCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - basementCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - roofCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - basementCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - roofCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - third floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - secondfloorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - first floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - third floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - ground floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - ground floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - ground floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - first floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - first floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - second floorCase Copy Drawings · PDF5 Nov 2025View
Proposed demolition ga plan - second floorCase Copy Drawings · PDF5 Nov 2025View
Lbc application formApplication Form · PDF23 Sept 2025View
Planning statementSuperseded Document · PDF23 Sept 2025View
Cover letterCase Copy Documents · PDF23 Sept 2025View
Statement of community involvementSuperseded Document · PDF23 Sept 2025View
Site location planSite Location Plan · PDF23 Sept 2025View
Level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga site plan level rf - roof as proposedSuperseded Document · PDF23 Sept 2025View
Ga site plan as proposedSuperseded Document · PDF23 Sept 2025View
Ga site plan as proposedSuperseded Document · PDF23 Sept 2025View
Site elevation west elevation - montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Site elevation east elevation - lynch close as existingSuperseded Document · PDF23 Sept 2025View
Site elevation west elevation - montpelier row as proposedCase Copy Drawings · PDF23 Sept 2025View
Site elevation east elevation - lynch close as proposedSuperseded Document · PDF23 Sept 2025View
Site elevation central courtyard as existingCase Copy Drawings · PDF23 Sept 2025View
Site section 02 listed building rear fa�ade as existingCase Copy Drawings · PDF23 Sept 2025View
Site section 01 central courtyard as proposedCase Copy Drawings · PDF23 Sept 2025View
Site section 02 listed building rear fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
3d view 01 view from montpelier row looking south as proposedPhotographs · PDF23 Sept 2025View
3d view 02 view from lynch close looking north as proposedSuperseded Document · PDF23 Sept 2025View
3d view 03 view from paragon place looking south west as proposedSuperseded Document · PDF23 Sept 2025View
3d view 04 view from courtyard garden looking south as proposedPhotographs · PDF23 Sept 2025View
3d view 05 view from lynch close looking west as proposedPhotographs · PDF23 Sept 2025View
Level 00 - ground floor as existingSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor as existingSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor as existingSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor as existingSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor as existingSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor as existingSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor as existingSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor as existingSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor as existingSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor as existingSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor as existingSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor as existingSuperseded Document · PDF23 Sept 2025View
Level rf - roof as existingSuperseded Document · PDF23 Sept 2025View
Level rf - roof as existingSuperseded Document · PDF23 Sept 2025View
Level rf - roof as existingSuperseded Document · PDF23 Sept 2025View
Level b1 - basement as existingSuperseded Document · PDF23 Sept 2025View
Level b1 - basement as existingSuperseded Document · PDF23 Sept 2025View
Level b1 - basement as existingSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level rf - roof proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level rf - roof proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level rf - roof proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level b1 - basement proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level b1 - basement proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level b1 - basement proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor as proposedSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor as proposedSuperseded Document · PDF23 Sept 2025View
Level rf - roof as proposedSuperseded Document · PDF23 Sept 2025View
Level rf - roof as proposedSuperseded Document · PDF23 Sept 2025View
Level rf - roof as proposedSuperseded Document · PDF23 Sept 2025View
Level b1 - basement as proposedSuperseded Document · PDF23 Sept 2025View
Level b1 - basement as proposedSuperseded Document · PDF23 Sept 2025View
Level b1 - basement as proposedSuperseded Document · PDF23 Sept 2025View
Bay study 01 - paragon place as proposedSuperseded Document · PDF23 Sept 2025View
Bay study 02a - south building as proposedSuperseded Document · PDF23 Sept 2025View
Bay study 02b - courtyard as proposedSuperseded Document · PDF23 Sept 2025View
Bay study 03 - courtyard as proposedSuperseded Document · PDF23 Sept 2025View
Bay study 04 - east entrance 1/2 as proposedSuperseded Document · PDF23 Sept 2025View
Bay study 04 - east entrance 2/2 as proposedSuperseded Document · PDF23 Sept 2025View
South glazed link 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
South glazed link 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
North glazed link 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
North glazed link 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Colonnade 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Colonnade 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpelier row proposed demolitionSuperseded Document · PDF23 Sept 2025View
Ga elevation east - paragon place proposed demolitionSuperseded Document · PDF23 Sept 2025View
Ga section a-a north building proposed demolitionSuperseded Document · PDF23 Sept 2025View
Ga section b-b courtyard garden proposed demolitionSuperseded Document · PDF23 Sept 2025View
Ga section c-c south building proposed demolitionSuperseded Document · PDF23 Sept 2025View
Ga elevation west - montpelier row as existingSuperseded Document · PDF23 Sept 2025View
Ga elevation east - paragon place as existingSuperseded Document · PDF23 Sept 2025View
Ga section a-a north building as existingSuperseded Document · PDF23 Sept 2025View
Ga section b-b courtyard garden as existingSuperseded Document · PDF23 Sept 2025View
Ga section c-c south building as existingSuperseded Document · PDF23 Sept 2025View
Ga elevation east fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga elevation north fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga elevation south fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga elevation west fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga elevation courtyard west fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga elevation courtyard south fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga elevation courtyard north fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga elevation courtyard east fa�ade as proposedSuperseded Document · PDF23 Sept 2025View
Ga section a-a north building as proposedSuperseded Document · PDF23 Sept 2025View
Ga section b-b courtyard garden as proposedSuperseded Document · PDF23 Sept 2025View
Ga section c-c south building as proposedSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level b1 - basement proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level b1 - basement proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level b1 - basement proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level rf - roof proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level rf - roof proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level rf - roof proposed demolitionSuperseded Document · PDF23 Sept 2025View
Level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section aa - 9 montpelier row proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section bb - 13 montpelier row proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section cc - 15 montpelier row proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section aa - 9 montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section bb - 13 montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section cc - 15 montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard east fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard east fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section aa - 9 montpelier row as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section bb - 13 montpelier row as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section cc - 15 montpelier row as proposedCase Copy Drawings · PDF23 Sept 2025View
Typical 1 bed apartment - south building as proposedSuperseded Document · PDF23 Sept 2025View
Typical 2 bed apartment - south building as proposedSuperseded Document · PDF23 Sept 2025View
Typical 3 bed apartment - south building as proposedSuperseded Document · PDF23 Sept 2025View
Typical 2 bed apartment - listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Typical 3 bed apartment - listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Typical 3 bed apartment - listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
South link to listed building - 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
South link to listed building - 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
South link to south building - 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
South link to south building - 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
South link roof parapet as proposedCase Copy Drawings · PDF23 Sept 2025View
South link roof to listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Link door jamb as proposedCase Copy Drawings · PDF23 Sept 2025View
Link door head and threshold as proposedCase Copy Drawings · PDF23 Sept 2025View
Colonnade terrace to listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Colonnade terrace parapet as proposedCase Copy Drawings · PDF23 Sept 2025View
Drawing registerCase Copy Documents · PDF23 Sept 2025View
Heritage, townscape and visual impact assessmentCase Copy Documents · PDF22 Sept 2025View
Design and access statementCase Copy Documents · PDF22 Sept 2025View
Landscape design and access statementCase Copy Documents · PDF22 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.