Council planning record

Change of use of the Clarendon Hotel, 8-16 Montpelier Row, SE3 from Hotel (C1) to Specialist Older Persons' Accommodation (C3), demolition of existing rear additions and construction of Specialist Older Persons' Accommodation (C3) to the rear with associated landscaping, access arrangements and other works incidental to the development.

CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW

RegisteredReference: DC/25/141479London Borough of Lewisham

Last published check: 30 Sept 2026, 01:58. Check the council record for more recent changes.

Application location

CLARENDON HOTEL, 8-16 MONTPELIER ROW, LONDON, SE3 0RW

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Planning Permission
Received
19 Sept 2025
Validated
26 Sept 2025
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

Change of use of the Clarendon Hotel, 8-16 Montpelier Row, SE3 from Hotel (C1) to Specialist Older Persons' Accommodation (C3), demolition of existing rear additions and construction of Specialist Older Persons' Accommodation (C3) to the rear with associated landscaping, access arrangements and other works incidental to the development.

Proposal details

Reference
DC/25/141479
Ward
Blackheath
Agent
DP9 Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 278 of 278

DocumentPublishedAction
External review of spine partition wallsCase Copy Documents · PDF24 Sept 2026View
Clarendon hotel ? daylight & sunlight reviewRevised Document · PDF12 Jul 2026View
Consultee responseCase Copy Documents · PDF18 May 2026View
Consultee responseCase Copy Documents · PDF29 Apr 2026View
Consultee responseCase Copy Documents · PDF16 Apr 2026View
Historic fabric opening up works summaryCase Copy Documents · PDF16 Apr 2026View
Breeam pre-assessment reportCase Copy Documents · PDF16 Apr 2026View
Proposed levels and drainageRevised Document · PDF16 Apr 2026View
Proposed urban greening factorRevised Document · PDF16 Apr 2026View
Existing urban greening factorRevised Document · PDF16 Apr 2026View
Proposed soft landscape planRevised Document · PDF16 Apr 2026View
Proposed tree planting strategyRevised Document · PDF16 Apr 2026View
Proposed landscape sections & elevation lynch closeRevised Document · PDF16 Apr 2026View
Proposed landscape sections 1 & 2 courtyardsRevised Document · PDF16 Apr 2026View
Proposed landscape elevation & sectionRevised Document · PDF16 Apr 2026View
Proposed edgings and boundaries landscape planRevised Document · PDF16 Apr 2026View
Proposed hard landscape planRevised Document · PDF16 Apr 2026View
Proposed rooftop planRevised Document · PDF16 Apr 2026View
Proposed landscape masterplanRevised Document · PDF16 Apr 2026View
Existing tree retention and removal planRevised Document · PDF16 Apr 2026View
Landscape site location planRevised Document · PDF16 Apr 2026View
Landscape drawing issue sheetRevised Document · PDF16 Apr 2026View
Additional objectionCase Copy Documents · PDF24 Feb 2026View
Additional consultee responseCase Copy Documents · PDF26 Jan 2026View
Breeam pre-assessment reportCase Copy Documents · PDF20 Jan 2026View
Site inspection report ? t5 rootsCase Copy Documents · PDF11 Dec 2025View
Consultee responseCase Copy Documents · PDF23 Nov 2025View
Consultee response - atz assessmentCase Copy Documents · PDF23 Nov 2025View
Tree cavat assessment reportCase Copy Documents · PDF23 Nov 2025View
Consultee commentsCase Copy Documents · PDF30 Oct 2025View
Consultee commentCase Copy Documents · PDF27 Oct 2025View
Consultee commentCase Copy Documents · PDF27 Oct 2025View
Consultee commentCase Copy Documents · PDF24 Oct 2025View
Consultee commentCase Copy Documents · PDF24 Oct 2025View
Consultee commentCase Copy Documents · PDF24 Oct 2025View
Consultee commentsCase Copy Documents · PDF24 Oct 2025View
Consultee commentCase Copy Documents · PDF17 Oct 2025View
Consultee commentCase Copy Documents · PDF17 Oct 2025View
Financial viability appraisalCase Copy Documents · PDF11 Oct 2025View
Consultee commentCase Copy Documents · PDF1 Oct 2025View
Consultee commentCase Copy Documents · PDF1 Oct 2025View
Consultee commentRevised Document · PDF30 Sept 2025View
Preliminary environmental risk assessment (pra) - desk studyCase Copy Documents · PDF26 Sept 2025View
Schedule of accommodationCase Copy Documents · PDF26 Sept 2025View
Archaeological desk-based assessmentCase Copy Documents · PDF26 Sept 2025View
Application formApplication Form · PDF26 Sept 2025View
Proposed 3d south west viewPhotographs · PDF23 Sept 2025View
Proposed 3d south view - court yard gardenPhotographs · PDF23 Sept 2025View
Proposed 3d west viewPhotographs · PDF23 Sept 2025View
Deliverables scheduleCase Copy Documents · PDF23 Sept 2025View
Site location planSite Location Plan · PDF23 Sept 2025View
Proposed ground floor demolitionCase Copy Drawings · PDF23 Sept 2025View
Proposed ground floor demolitionCase Copy Drawings · PDF23 Sept 2025View
Proposed ground floor demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga floor plan - level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Bay study 01 - paragon place as proposedCase Copy Drawings · PDF23 Sept 2025View
Bay study 02a - south building as proposedCase Copy Drawings · PDF23 Sept 2025View
Bay study 02b - courtyard as proposedCase Copy Drawings · PDF23 Sept 2025View
Bay study 03 - courtyard as proposedCase Copy Drawings · PDF23 Sept 2025View
Bay study 04 - east entrance 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Bay study 04 - east entrance 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
South glazed link 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
South glazed link 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
North glazed link 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
North glazed link 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Colonnade 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Colonnade 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpelier row proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section a-a north building proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section b-b courtyard garden proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section c-c south building proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section a-a north building as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section b-b courtyard garden as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section c-c south building as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation north fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation south fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevationwest fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard west fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard south fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard north fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard east fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section a-a north building as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section b-b courtyard garden as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section c-c south building as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as existingCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as existingCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as existingCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 00 - ground floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 01 - first floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 02 - second floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level 03 - third floor as proposedCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Level b1 - basement as proposedCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Level rf - roof as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section aa - 9 montpelier row proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section bb - 13 montpelier row proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga section cc - 15 montpelier row proposed demolitionCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation east - paragon place as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section aa - 9 montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section bb - 13 montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Ga section cc - 15 montpelier row as existingCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard east fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation courtyard east fa�ade as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga elevation west - montpellier row 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section aa - 9 montpelier row as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section bb - 13 montpelier row as proposedCase Copy Drawings · PDF23 Sept 2025View
Ga section cc - 15 montpelier row as proposedCase Copy Drawings · PDF23 Sept 2025View
Layout plan typical 1 bed apartment - south building as proposedCase Copy Drawings · PDF23 Sept 2025View
Layout plan typical 2 bed apartment - south building as proposedCase Copy Drawings · PDF23 Sept 2025View
Layout plan typical 3 bed apartment - south building as proposedCase Copy Drawings · PDF23 Sept 2025View
Layout plan typical 2 bed apartment - listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Layout plan typical 3 bed apartment - listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Layout plan typical 3 bed apartment - listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail plan south link to listed building - 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail plan south link to listed building - 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail plan south link to south building - 1/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail plan south link to south building - 2/2 as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail section south link roof parapet as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail section south link roof to listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail plan llnk door jamb as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail section link door head and threshold as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail section colonnade terrace to listed building as proposedCase Copy Drawings · PDF23 Sept 2025View
Detail section colonnade terrace parapet as proposedCase Copy Drawings · PDF23 Sept 2025View
Drawing registerCase Copy Documents · PDF23 Sept 2025View
Deliverables scheduleCase Copy Documents · PDF23 Sept 2025View
Biodiversity metric calculationCase Copy Documents22 Sept 2025View
Air quality assessmentCase Copy Documents · PDF22 Sept 2025View
Arboricultural impact assessment reportCase Copy Documents · PDF22 Sept 2025View
Bng statementCase Copy Documents · PDF22 Sept 2025View
Car and cycle parking management planCase Copy Documents · PDF22 Sept 2025View
Circular economy statementCase Copy Documents · PDF22 Sept 2025View
Planning statementCase Copy Documents · PDF22 Sept 2025View
Economic statementCase Copy Documents · PDF22 Sept 2025View
Cover letterCase Copy Documents · PDF22 Sept 2025View
Delivery and servicing planCase Copy Documents · PDF22 Sept 2025View
Whole life carbon assessmentCase Copy Documents · PDF22 Sept 2025View
Waste management strategyCase Copy Documents · PDF22 Sept 2025View
Travel planCase Copy Documents · PDF22 Sept 2025View
Transport assessmentCase Copy Documents · PDF22 Sept 2025View
Statement of community involvementCase Copy Documents · PDF22 Sept 2025View
Preliminary ecological appraisalCase Copy Documents · PDF22 Sept 2025View
Outline construction logistics planCase Copy Documents · PDF22 Sept 2025View
Noise impact assessmentCase Copy Documents · PDF22 Sept 2025View
Internal daylight, sunlight & overshadowing reportCase Copy Documents · PDF22 Sept 2025View
Health impact assessmentCase Copy Documents · PDF22 Sept 2025View
Flood risk assessment and drainage strategyCase Copy Documents · PDF22 Sept 2025View
Energy and sustainability strategyCase Copy Documents · PDF22 Sept 2025View
Daylight, sunlight & overshadowing reportCase Copy Documents · PDF22 Sept 2025View
Existing ga site planCase Copy Drawings · PDF22 Sept 2025View
Proposed ga site planCase Copy Drawings · PDF22 Sept 2025View
Proposed ga site planCase Copy Drawings · PDF22 Sept 2025View
Proposed ga site planCase Copy Drawings · PDF22 Sept 2025View
Proposed ga site planCase Copy Drawings · PDF22 Sept 2025View
Existing west elevationCase Copy Drawings · PDF22 Sept 2025View
Existing east elevationCase Copy Drawings · PDF22 Sept 2025View
Proposed west elevationCase Copy Drawings · PDF22 Sept 2025View
Proposed east elevationCase Copy Drawings · PDF22 Sept 2025View
Existing site section 01 central courtyardCase Copy Drawings · PDF22 Sept 2025View
Existing site section 02 listed building rear facadeCase Copy Drawings · PDF22 Sept 2025View
Proposed site section 01 central court yardCase Copy Drawings · PDF22 Sept 2025View
Proposed site section 02 listed building rear facadeCase Copy Drawings · PDF22 Sept 2025View
Proposed 3d south viewPhotographs · PDF22 Sept 2025View
Proposed 3d north viewPhotographs · PDF22 Sept 2025View
Proposed 3d south west viewCase Copy Drawings · PDF22 Sept 2025View
Proposed 3d south courtyard garden viewCase Copy Drawings · PDF22 Sept 2025View
Proposed 3d west viewCase Copy Drawings · PDF22 Sept 2025View
Blackheath drawing registerCase Copy Documents · PDF22 Sept 2025View
Deliverables scheduleCase Copy Documents · PDF22 Sept 2025View
Landscape drawingsCase Copy Drawings · PDF22 Sept 2025View
Landscape design and access statementCase Copy Documents · PDF22 Sept 2025View
Design and access statementCase Copy Documents · PDF22 Sept 2025View
Heritage, townscape and visual impact assessmentCase Copy Documents · PDF22 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  9. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.