Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
ACHILLES STREET ESTATE &, 355-383 NEW CROSS ROAD, LONDON, SE14 6LA
Last published check: 30 Sept 2026, 20:13. Check the council record for more recent changes.
ACHILLES STREET ESTATE &, 355-383 NEW CROSS ROAD, LONDON, SE14 6LA
This record has no verified map location.
View council mapPhased redevelopment of the existing site comprising demolition of Achilles Street Estate (including Azalea House, Fenton House and Austin House) and 355?383 New Cross Road, SE14 and construction of five new buildings to provide a mixed-use development comprised of residential dwellings (Class C3) and flexible commercial floorspace (Class E), together with new and enhanced public realm, landscaping, pedestrian and cycle access to Fordham Park, car and cycle parking, refuse storage, relocation of existing substation, rooftop plant equipment and all other associated works at Achilles Street Estate and 355?383 New Cross Road, SE14.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Decision noticeDecision · PDF | 16 Feb 2026 | View |
| Decision noticeDecision · PDF | 12 Feb 2026 | View |
| Completed letter of undertaking agreementSection 106 Agreements · PDF | 5 Feb 2026 | View |
| Gla stage 2 letterDecision · PDF | 22 Dec 2025 | View |
| Committee reportCommittee Report · PDF | 2 Dec 2025 | View |
| Addendum committee reportCommittee Report · PDF | 2 Dec 2025 | View |
| Appendix a landlord offerCommittee Report · PDF | 2 Dec 2025 | View |
| Gla stage 1 letterCase Copy Documents · PDF | 24 Nov 2025 | View |
| Gla stage 1 reportCase Copy Documents · PDF | 24 Nov 2025 | View |
| Consultee commentCase Copy Documents · PDF | 24 Nov 2025 | View |
| Energy assessment appendicesCase Copy Documents · PDF | 23 Nov 2025 | View |
| Consultee response - glaCase Copy Documents | 23 Nov 2025 | View |
| Consultee response - glaCase Copy Documents | 23 Nov 2025 | View |
| Consultee response - glaCase Copy Documents | 23 Nov 2025 | View |
| Consultee response - glaCase Copy Documents | 23 Nov 2025 | View |
| Energy assessment - appendices onlyCase Copy Documents · PDF | 23 Nov 2025 | View |
| Landlord offer to residentsCase Copy Documents · PDF | 18 Nov 2025 | View |
| Proposed building d bay study south facade 02Revised Document · PDF | 18 Nov 2025 | View |
| Proposed building d bay study north facadeRevised Document · PDF | 18 Nov 2025 | View |
| Proposed building d bay study south facade 01Revised Document · PDF | 18 Nov 2025 | View |
| Consultee commentsCase Copy Documents | 18 Nov 2025 | View |
| Consultee commentsCase Copy Documents | 18 Nov 2025 | View |
| Gla viability reviewCase Copy Documents · PDF | 18 Nov 2025 | View |
| Proposed phasing planCase Copy Documents · PDF | 15 Nov 2025 | View |
| Mvhr-trim cooling data sheetCase Copy Documents · PDF | 13 Nov 2025 | View |
| Energy assessmentRevised Document · PDF | 13 Nov 2025 | View |
| Consultee responseCase Copy Documents · PDF | 11 Nov 2025 | View |
| Proposed 3rd floor planCase Copy Documents · PDF | 10 Nov 2025 | View |
| Consultee responseCase Copy Documents · PDF | 9 Nov 2025 | View |
| Consultee responseCase Copy Documents · PDF | 9 Nov 2025 | View |
| Heat demand profile scop calculationCase Copy Documents · PDF | 8 Nov 2025 | View |
| Applicant response to net zero officer commentsCase Copy Documents | 8 Nov 2025 | View |
| Potential accessible parking planRevised Document · PDF | 8 Nov 2025 | View |
| Proposed combined services layout roof level - all blocksRevised Document · PDF | 8 Nov 2025 | View |
| Brukl worksheetsRevised Document · PDF | 8 Nov 2025 | View |
| Gla whole life carbon assessment spreadsheet - block dRevised Document | 8 Nov 2025 | View |
| Gla whole life carbon assessment spreadsheet - block cRevised Document | 8 Nov 2025 | View |
| Gla whole life carbon assessment spreadsheet - block bRevised Document | 8 Nov 2025 | View |
| Gla whole life carbon assessment spreadsheet - block a3Revised Document | 8 Nov 2025 | View |
| Gla whole life carbon assessment spreadsheet - block a2Revised Document | 8 Nov 2025 | View |
| Gla whole life carbon assessment spreadsheet - block aaRevised Document | 8 Nov 2025 | View |
| Circular economy statementRevised Document · PDF | 8 Nov 2025 | View |
| Consultee commentCase Copy Documents · PDF | 28 Oct 2025 | View |
| Proposed ugf planCase Copy Documents · PDF | 11 Oct 2025 | View |
| Consultee commentsCase Copy Documents · PDF | 8 Oct 2025 | View |
| Consultee responseCase Copy Documents · PDF | 1 Oct 2025 | View |
| Consultee responseCase Copy Documents · PDF | 1 Oct 2025 | View |
| Consultee responseCase Copy Documents · PDF | 22 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 19 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 19 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 19 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 19 Sept 2025 | View |
| Financial viability assessment review by jjvCase Copy Documents · PDF | 19 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 16 Sept 2025 | View |
| Consultee commentsCase Copy Documents · PDF | 12 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 12 Sept 2025 | View |
| Consultee commentCase Copy Documents · PDF | 11 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 8 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 8 Sept 2025 | View |
| Fire strategy block dRevised Document · PDF | 3 Sept 2025 | View |
| Fire strategy block cRevised Document · PDF | 3 Sept 2025 | View |
| Fire strategy block bRevised Document · PDF | 3 Sept 2025 | View |
| Fire strategy block a3Revised Document · PDF | 3 Sept 2025 | View |
| Fire strategy block a1 and a2Revised Document · PDF | 3 Sept 2025 | View |
| Financial viability assessmentCase Copy Documents · PDF | 3 Sept 2025 | View |
| Pedestrian level wind and microclimate assessmentRevised Document · PDF | 3 Sept 2025 | View |
| Townscape & visual impact assessmentRevised Document · PDF | 3 Sept 2025 | View |
| Townscape & visual impact assessmentRevised Document · PDF | 3 Sept 2025 | View |
| Gia and gea schedules spreadsheetRevised Document | 3 Sept 2025 | View |
| Gia and gea schedulesRevised Document · PDF | 3 Sept 2025 | View |
| Accommodation scheduleRevised Document · PDF | 3 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 3 Sept 2025 | View |
| Consultee responseCase Copy Documents · PDF | 3 Sept 2025 | View |
| Consultee responseCase Copy Documents | 2 Sept 2025 | View |
| Annex 5 - townscape & visual impact assessmentCase Copy Documents · PDF | 26 Aug 2025 | View |
| Annex 4 - townscape & visual impact assessmentCase Copy Documents · PDF | 26 Aug 2025 | View |
| Urban greening factorCase Copy Documents · PDF | 26 Aug 2025 | View |
| Viability assessment - executive summaryCase Copy Documents · PDF | 26 Aug 2025 | View |
| Design and access statementCase Copy Documents · PDF | 26 Aug 2025 | View |
| Ugf metric spreadsheetCase Copy Documents | 22 Aug 2025 | View |
| Bng metric spreadsheetCase Copy Documents | 22 Aug 2025 | View |
| Planning statementCase Copy Documents · PDF | 19 Aug 2025 | View |
| Lewisham design review panel report - 2nd review 15 july 2024Case Copy Documents · PDF | 19 Aug 2025 | View |
| Lewisham design review panel report - 1st review 27 november 2023Case Copy Documents · PDF | 19 Aug 2025 | View |
| Existing site wide elevationsCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Application formApplication Form · PDF | 18 Aug 2025 | View |
| Circular economy statementCase Copy Documents · PDF | 18 Aug 2025 | View |
| Circular economy spreadsheetsCase Copy Documents | 18 Aug 2025 | View |
| Circular economy spreadsheetsCase Copy Documents | 18 Aug 2025 | View |
| Circular economy spreadsheetsCase Copy Documents | 18 Aug 2025 | View |
| Circular economy spreadsheetsCase Copy Documents | 18 Aug 2025 | View |
| Circular economy spreadsheetsCase Copy Documents | 18 Aug 2025 | View |
| Circular economy spreadsheetsCase Copy Documents | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Cgi viewsCase Copy Drawings | 18 Aug 2025 | View |
| Existing drawings- commercalCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Existing drawings- commercalCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Existing drawings- commercalCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Existing drawings- commercalCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Existing drawings- residentialCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Existing drawings- residentialCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Existing drawings- residentialCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Existing site wide plan-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Phasing plan-1Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Site location plan-3Site Location Plan · PDF | 18 Aug 2025 | View |
| Demolition plan-3Site Location Plan · PDF | 18 Aug 2025 | View |
| Existing site wide elevationsCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide block plan - level 00-Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan -01-1Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 00-23Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Maisonette entrance-5Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide block plan - level 01-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 01 service road-20Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide block plan - level 02-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 02-22Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide block plan - level 03-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 04-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 05-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 06-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 07-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 08-16Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 09-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 10-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 11-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 12-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 13-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 14-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 15-17Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - floor plan 16-16Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide block plan - roof-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide elevations 1 of 3 -3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide elevations 2 of 3 -3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed elevations 1 and 2 1 of 5-10Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed elevations 3 and 4 (2 of 5)-10Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed elevations 5 and 6 3 of 5-10Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed elevation 9 5of 5-9Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed sections 1 & 2 1 of 3-10Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed sections 3 & 4 2 of 3-10Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed sections 5 & 6 3 of 3-5Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Walkway-4Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Balcony-4Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Brise soleil-5Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building a balcony-4Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building a brickwork pier-4Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - site wide elevations 2 of 3 -4Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Proposed - elevations 07 & 08 4 of 5 -9Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d bay study south fascade 01-5Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d bay study south fascade 02-5Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d bay study north fascade-5Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d parapet south facade-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d typical balcony-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d balcony above entrace-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d parapet north facade-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| Building d typical deck access-3Case Copy Drawings · PDF | 18 Aug 2025 | View |
| All landscape plansCase Copy Drawings · PDF | 18 Aug 2025 | View |
| Drawing registerCase Copy Documents · PDF | 18 Aug 2025 | View |
| Energy assessmentCase Copy Documents | 18 Aug 2025 | View |
| Energy assessmentCase Copy Documents | 18 Aug 2025 | View |
| Energy assessmentCase Copy Documents | 18 Aug 2025 | View |
| Energy assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Whole life carbon assessmentCase Copy Documents | 18 Aug 2025 | View |
| Whole life carbon assessmentCase Copy Documents | 18 Aug 2025 | View |
| Whole life carbon assessmentCase Copy Documents | 18 Aug 2025 | View |
| Whole life carbon assessmentCase Copy Documents | 18 Aug 2025 | View |
| Whole life carbon assessmentCase Copy Documents | 18 Aug 2025 | View |
| Whole life carbon assessmentCase Copy Documents | 18 Aug 2025 | View |
| Air quality statementCase Copy Documents · PDF | 18 Aug 2025 | View |
| Arboricultural impact assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Archaeological desk based assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Biodiversity net gain assessment revb finalCase Copy Documents · PDF | 18 Aug 2025 | View |
| Car park management planCase Copy Documents · PDF | 18 Aug 2025 | View |
| Construction environmental management planCase Copy Documents · PDF | 18 Aug 2025 | View |
| Construction traffice management planCase Copy Documents · PDF | 18 Aug 2025 | View |
| Covering letterCase Copy Documents · PDF | 18 Aug 2025 | View |
| Daylight & sunlight reportCase Copy Documents · PDF | 18 Aug 2025 | View |
| Delivery & management servicing planCase Copy Documents · PDF | 18 Aug 2025 | View |
| Equality impact assessment statement of conformityCase Copy Documents · PDF | 18 Aug 2025 | View |
| External lighting reportCase Copy Documents · PDF | 18 Aug 2025 | View |
| Flood risk assessment & drainage strategyCase Copy Documents · PDF | 18 Aug 2025 | View |
| Geotechnical investigation reportCase Copy Documents · PDF | 18 Aug 2025 | View |
| Health impact assessment statement of conformityCase Copy Documents · PDF | 18 Aug 2025 | View |
| Noise impact assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Overheating risk assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Preliminary ecology appraisalCase Copy Documents · PDF | 18 Aug 2025 | View |
| Statement of community involvementCase Copy Documents · PDF | 18 Aug 2025 | View |
| Sustainable statementCase Copy Documents · PDF | 18 Aug 2025 | View |
| Townscape & visual impact assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Transport assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Travel planCase Copy Documents · PDF | 18 Aug 2025 | View |
| Utilities statementCase Copy Documents · PDF | 18 Aug 2025 | View |
| Ventilation & extraction statementCase Copy Documents · PDF | 18 Aug 2025 | View |
| Wind micrclimate assessmentCase Copy Documents · PDF | 18 Aug 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.