Council planning record

Demolition of the existing building and structures and the construction of a part 8 / part 11 storey building consisting of a Church (Use Class F1), community facilities and 24 new flats (Use Class C3) with associated landscaping, access works, roof-mounted plant and all associated works at 56-60 New Cross Road SE14. (Re-consultation following revisions to the design, massing and layout of the development).

56-60 NEW CROSS ROAD, LONDON, SE14 5BD

RegisteredReference: DC/25/141062London Borough of Lewisham

Last published check: 9 Oct 2026, 06:04. Check the council record for more recent changes.

Application location

56-60 NEW CROSS ROAD, LONDON, SE14 5BD

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Planning Permission
Received
7 Aug 2025
Validated
9 Sept 2025
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

Demolition of the existing building and structures and the construction of a part 8 / part 11 storey building consisting of a Church (Use Class F1), community facilities and 24 new flats (Use Class C3) with associated landscaping, access works, roof-mounted plant and all associated works at 56-60 New Cross Road SE14. (Re-consultation following revisions to the design, massing and layout of the development).

Proposal details

Reference
DC/25/141062
Alternative references
PP-13996746
Ward
Telegraph Hill
Agent
Tibbalds Planning and Urban Design

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 251 of 251

DocumentPublishedAction
Met police responseCase Copy Documents · PDF15 Sept 2026View
Proposed roof planRevised Document · PDF8 Sept 2026View
Daylight and sunlight reportRevised Document · PDF8 Sept 2026View
Affordable housing statement addendumRevised Document · PDF3 Sept 2026View
Proposed second and third floor ga plansRevised Document · PDF3 Sept 2026View
Fire statementRevised Document · PDF3 Sept 2026View
No commentsCase Copy Documents · PDF26 Aug 2026View
Planning statement addendumRevised Document · PDF25 Aug 2026View
Townscape & visual appraisalRevised Document · PDF25 Aug 2026View
Tall building statementRevised Document · PDF25 Aug 2026View
CommentsCase Copy Documents · PDF25 Aug 2026View
Previous commentsCase Copy Documents · PDF25 Aug 2026View
CommentCase Copy Documents · PDF18 Aug 2026View
No commentCase Copy Documents · PDF18 Aug 2026View
CommentCase Copy Documents · PDF18 Aug 2026View
Wind and microclimate assessmentRevised Document · PDF10 Aug 2026View
Design and access statement addendumRevised Document · PDF10 Aug 2026View
Proposed north elevationRevised Document · PDF10 Aug 2026View
Proposed east elevationRevised Document · PDF10 Aug 2026View
Proposed south elevationRevised Document · PDF10 Aug 2026View
Proposed ground and first floor ga plansRevised Document · PDF10 Aug 2026View
Proposed fourth to seventh floor ga plansRevised Document · PDF10 Aug 2026View
Proposed eight to tenth floor ga plansRevised Document · PDF10 Aug 2026View
Consultee commentsCase Copy Documents22 Jul 2026View
Energy and sustainability statementRevised Document · PDF9 Jul 2026View
Consultee commentsCase Copy Documents · PDF7 Jul 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document28 Jun 2026View
Whole life carbon & circular economyRevised Document28 Jun 2026View
Whole life carbon & circular economyRevised Document28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Whole life carbon & circular economyRevised Document · PDF28 Jun 2026View
Flood risk manager commentsCase Copy Documents · PDF27 Jun 2026View
Urban design comments finalCase Copy Documents · PDF24 Jun 2026View
4. 56-60 new cross road_gla ce memo_post-stage 1_10.03.26Case Copy Documents13 Apr 2026View
4. 56-60 new cross road_gla wlc memo_11.03.26Case Copy Documents13 Apr 2026View
20250902 56-60 new cross road - post stage 1 set 1 (gla consultation) - energy mCase Copy Documents13 Apr 2026View
Townscape and visual appraisalRevised Document · PDF2 Mar 2026View
Energy & sustainability statementSuperseded Document · PDF2 Mar 2026View
Energy & sustainability statementRevised Document · PDF2 Mar 2026View
Energy & sustainability statementRevised Document · PDF2 Mar 2026View
Energy & sustainability statementRevised Document · PDF2 Mar 2026View
Energy & sustainability statementRevised Document2 Mar 2026View
Energy & sustainability statementRevised Document · PDF2 Mar 2026View
Energy & sustainability statementRevised Document · PDF2 Mar 2026View
Energy & sustainability statementRevised Document · PDF2 Mar 2026View
Whole life carbon & circular economySuperseded Document · PDF2 Mar 2026View
Whole life carbon & circular economySuperseded Document2 Mar 2026View
Whole life carbon & circular economySuperseded Document2 Mar 2026View
Whole life carbon & circular economySuperseded Document2 Mar 2026View
Whole life carbon & circular economySuperseded Document · PDF2 Mar 2026View
Whole life carbon & circular economySuperseded Document · PDF2 Mar 2026View
Whole life carbon & circular economySuperseded Document · PDF2 Mar 2026View
Whole life carbon & circular economySuperseded Document · PDF2 Mar 2026View
Whole life carbon & circular economySuperseded Document · PDF2 Mar 2026View
Whole life carbon & circular economySuperseded Document · PDF2 Mar 2026View
Proposed west flank elevationCase Copy Documents · PDF29 Jan 2026View
Flood risk assessment and drainage statementCase Copy Documents · PDF16 Dec 2025View
Flood risk assessment and drainage statementCase Copy Documents · PDF16 Dec 2025View
Flood risk assessment and drainage statementCase Copy Documents · PDF16 Dec 2025View
Drainage strategy addendumCase Copy Documents · PDF16 Dec 2025View
Drainage strategy addendumCase Copy Documents · PDF16 Dec 2025View
Fire statementSuperseded Document · PDF16 Dec 2025View
Proposed ground and first floor plansSuperseded Document · PDF16 Dec 2025View
External lighting compliance statementCase Copy Documents · PDF16 Dec 2025View
Ground floor external lighting layoutCase Copy Documents · PDF16 Dec 2025View
Structural reportRevised Document · PDF16 Dec 2025View
Daylight and sunlight studySuperseded Document · PDF16 Dec 2025View
Arboricultural impact assessment, method statement and tree protection plan.Revised Document · PDF16 Dec 2025View
Landscape strategy fullRevised Document · PDF16 Dec 2025View
Landscape level 00Revised Document · PDF16 Dec 2025View
Hardworks level 00Revised Document · PDF16 Dec 2025View
Softworks level 00Revised Document · PDF16 Dec 2025View
Furniture level 00Revised Document · PDF16 Dec 2025View
Landscape level 03Revised Document · PDF16 Dec 2025View
Landscape level 04Revised Document · PDF16 Dec 2025View
Landscape level 08Revised Document · PDF16 Dec 2025View
Softworks level 08Revised Document · PDF16 Dec 2025View
Furniture level 08Revised Document · PDF16 Dec 2025View
Landscape level 11Revised Document · PDF16 Dec 2025View
Hardworks level 03 and 08Revised Document · PDF16 Dec 2025View
Geotechnical and geo-environmental interpretative reportCase Copy Documents · PDF14 Nov 2025View
CommentCase Copy Documents · PDF12 Nov 2025View
Greater london authority stage 1 responseCase Copy Documents · PDF20 Oct 2025View
Tree officer commentsCase Copy Documents · PDF8 Oct 2025View
Policy manager commentsCase Copy Documents8 Oct 2025View
Strategic housing and growth commentsCase Copy Documents · PDF8 Oct 2025View
Net zero energy manager commentsCase Copy Documents8 Oct 2025View
Environmental protection acoustic commentsCase Copy Documents8 Oct 2025View
Environmental protection air quality commentsCase Copy Documents8 Oct 2025View
Environmental protection contamination commentsSuperseded Document8 Oct 2025View
Flood risk manager commentsCase Copy Documents8 Oct 2025View
Conservation officer commentsCase Copy Documents8 Oct 2025View
Consultee commentCase Copy Documents29 Sept 2025View
Consultee commentCase Copy Documents · PDF29 Sept 2025View
Lewisham policy team commentsCase Copy Documents23 Sept 2025View
Environmental protection commentsCase Copy Documents23 Sept 2025View
Wind & microclimate assessmentSuperseded Document · PDF22 Sept 2025View
Environmental protection commentsCase Copy Documents · PDF21 Sept 2025View
Design and access statement 11Case Copy Documents · PDF9 Sept 2025View
Planning and affordable housing statementCase Copy Documents · PDF9 Sept 2025View
Tall buildings statementCase Copy Documents · PDF9 Sept 2025View
553081bn29may25fv01_statutory_biodiversity_metric v2.Case Copy Documents9 Sept 2025View
Site location planSite Location Plan · PDF9 Sept 2025View
Site planSite Location Plan · PDF9 Sept 2025View
Existing site planSite Location Plan · PDF9 Sept 2025View
2nd floor small power layoutCase Copy Drawings · PDF8 Aug 2025View
2nd floor general & emergency lighting layoutCase Copy Drawings · PDF8 Aug 2025View
2nd floor fire alarm layoutCase Copy Drawings · PDF8 Aug 2025View
Second floor - mechanical services layoutCase Copy Drawings · PDF8 Aug 2025View
Second floor water servicesCase Copy Drawings · PDF8 Aug 2025View
Third floor mechanical services layoutCase Copy Drawings · PDF8 Aug 2025View
1st floor general & emergency lighting layoutCase Copy Drawings · PDF8 Aug 2025View
1st floor fire alarm layoutCase Copy Drawings · PDF8 Aug 2025View
Ground floor - mechanical services layoutCase Copy Drawings · PDF8 Aug 2025View
First floor - mechanical services layoutCase Copy Drawings · PDF8 Aug 2025View
First floor water servicesCase Copy Drawings · PDF8 Aug 2025View
Second floor - above ground drainage stacking layoutCase Copy Drawings · PDF8 Aug 2025View
Ground floor small power layoutCase Copy Drawings · PDF8 Aug 2025View
Ground floor general & emergency lighting layoutCase Copy Drawings · PDF8 Aug 2025View
Ground floor fire alarm layoutCase Copy Drawings · PDF8 Aug 2025View
Ground floor water servicesCase Copy Drawings · PDF8 Aug 2025View
First floor - above ground drainage stacking layoutCase Copy Drawings · PDF8 Aug 2025View
1st floor small power layoutCase Copy Drawings · PDF8 Aug 2025View
Floor above ground drainage & water servicesCase Copy Drawings · PDF8 Aug 2025View
Typical floor mechanical services layout - heatingCase Copy Drawings · PDF8 Aug 2025View
Typical floor mechanical services layout - ventilationCase Copy Drawings · PDF8 Aug 2025View
Ground floor - above ground drainage stacking layoutCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 3 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 4 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 5 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 6 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 7 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 8 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
3d views, sections, pile and floor plansCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 1 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
Proposed apartment type 2 -electrical services layoutCase Copy Drawings · PDF8 Aug 2025View
3d views - general arrangementCase Copy Drawings · PDF8 Aug 2025View
Sd29 structural and mepSuperseded Document · PDF8 Aug 2025View
Fire safety statementCase Copy Documents · PDF8 Aug 2025View
Site contamination assessment part-10Case Copy Documents · PDF8 Aug 2025View
MapsCase Copy Drawings · PDF8 Aug 2025View
Preliminary unexploded ordinance risk assessmentCase Copy Documents · PDF8 Aug 2025View
MapsCase Copy Drawings · PDF8 Aug 2025View
MapsCase Copy Drawings · PDF8 Aug 2025View
Site contamination assessmentCase Copy Documents · PDF8 Aug 2025View
Site contamination assessment - flood mapsCase Copy Documents · PDF8 Aug 2025View
Site contamination assessment - aerial viewCase Copy Documents · PDF8 Aug 2025View
Construction management planCase Copy Documents · PDF8 Aug 2025View
Site contamination assessment part-1Case Copy Documents · PDF8 Aug 2025View
Site contamination assessment detailsCase Copy Documents · PDF8 Aug 2025View
Air quality assessmentCase Copy Documents · PDF8 Aug 2025View
Daylight and sunlight studySuperseded Document · PDF8 Aug 2025View
Acoustic design statementCase Copy Documents · PDF8 Aug 2025View
Accurate visual representations part5Case Copy Documents · PDF8 Aug 2025View
Accurate visual representations part 6Case Copy Documents · PDF8 Aug 2025View
Accurate visual representations part4Case Copy Documents · PDF8 Aug 2025View
Accurate visual representations part3Case Copy Documents · PDF8 Aug 2025View
Accurate visual representations part2Case Copy Documents · PDF8 Aug 2025View
Accurate visual representations part1Case Copy Documents · PDF8 Aug 2025View
Archaeological desk-based assessmentCase Copy Documents · PDF8 Aug 2025View
Townscape and visual appraisalSuperseded Document · PDF8 Aug 2025View
Heritage statementCase Copy Documents · PDF8 Aug 2025View
Biodiversity net gain assessment and ugfCase Copy Documents · PDF8 Aug 2025View
Appendix b - southern aspect bat box locationsCase Copy Documents · PDF8 Aug 2025View
Statutory biodiversity metricCase Copy Documents8 Aug 2025View
Preliminary ecological appraisal & roost assessment bat survey reportCase Copy Documents · PDF8 Aug 2025View
Landscape maintenanceCase Copy Documents · PDF8 Aug 2025View
Landscape strategySuperseded Document · PDF8 Aug 2025View
Operation & maintenance part 2Case Copy Documents · PDF8 Aug 2025View
Operation & maintenanceCase Copy Documents · PDF8 Aug 2025View
Flood risk assessment & drainage statementSuperseded Document · PDF8 Aug 2025View
Outline site waste management planCase Copy Documents · PDF8 Aug 2025View
Operational waste management strategyCase Copy Documents · PDF8 Aug 2025View
Pre-demolition auditCase Copy Documents · PDF8 Aug 2025View
Pre-redevelopment auditCase Copy Documents · PDF8 Aug 2025View
Whole life carbon assessment and circular economy statementSuperseded Document · PDF8 Aug 2025View
Overheating assessmentCase Copy Documents · PDF8 Aug 2025View
Appendix aSuperseded Document8 Aug 2025View
Appendix bSuperseded Document8 Aug 2025View
Appendix cSuperseded Document8 Aug 2025View
Energy & sustainability statementSuperseded Document · PDF8 Aug 2025View
Appendix dSuperseded Document8 Aug 2025View
Framework travel planCase Copy Documents · PDF8 Aug 2025View
Delivery and servicing planCase Copy Drawings · PDF8 Aug 2025View
Transport statementCase Copy Documents · PDF8 Aug 2025View
Statement of community involvementCase Copy Documents · PDF8 Aug 2025View
Design & access statement part 8Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 7Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 6Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 5Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 4Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 2Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 3Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 10Case Copy Documents · PDF8 Aug 2025View
Design & access statement part 9Case Copy Documents · PDF8 Aug 2025View
Residential accommodationCase Copy Drawings · PDF8 Aug 2025View
Area schedule - proposedSuperseded Document · PDF8 Aug 2025View
Cover letterCase Copy Documents · PDF8 Aug 2025View
Design & access statement part 1Case Copy Documents · PDF8 Aug 2025View
3d views - general arrangementCase Copy Drawings · PDF8 Aug 2025View
Sections 1 1 & 2 2 - sheet 1Case Copy Drawings · PDF8 Aug 2025View
Section 3 3 - sheet 2Case Copy Drawings · PDF8 Aug 2025View
Sections 4 4 - sheet 3Case Copy Drawings · PDF8 Aug 2025View
Sections details - sheet 1Case Copy Drawings · PDF8 Aug 2025View
3d section views - general arrangementCase Copy Drawings · PDF8 Aug 2025View
Typical wall corner & balcony details - sheet 1Case Copy Drawings · PDF8 Aug 2025View
Roof level planCase Copy Drawings · PDF8 Aug 2025View
Third floor planCase Copy Drawings · PDF8 Aug 2025View
Fourth floor planCase Copy Drawings · PDF8 Aug 2025View
Fifth to seventh floor planCase Copy Drawings · PDF8 Aug 2025View
Eighth floor planCase Copy Drawings · PDF8 Aug 2025View
Ninth floor planCase Copy Drawings · PDF8 Aug 2025View
Tenth floor planCase Copy Drawings · PDF8 Aug 2025View
Pile plan - general arrangementCase Copy Drawings · PDF8 Aug 2025View
Landscape levelSuperseded Document · PDF8 Aug 2025View
Hard works level 08 and 03Superseded Document · PDF8 Aug 2025View
Ground floor planSuperseded Document · PDF8 Aug 2025View
First floor planSuperseded Document · PDF8 Aug 2025View
Site constraints ground floor planCase Copy Drawings · PDF8 Aug 2025View
Site constraints exclusion zone sectionCase Copy Drawings · PDF8 Aug 2025View
Second floor planCase Copy Drawings · PDF8 Aug 2025View
Landscape level 08Superseded Document · PDF8 Aug 2025View
Softworks levelSuperseded Document · PDF8 Aug 2025View
Furniture levelSuperseded Document · PDF8 Aug 2025View
Landscape level 00Superseded Document · PDF8 Aug 2025View
Hard works level 00Superseded Document · PDF8 Aug 2025View
Softworks level 00Superseded Document · PDF8 Aug 2025View
Furniture level 00Superseded Document · PDF8 Aug 2025View
Landscape level 03Superseded Document · PDF8 Aug 2025View
Landscape level 04Superseded Document · PDF8 Aug 2025View
Level 02 and 03 - ga plansSuperseded Document · PDF8 Aug 2025View
Levels 04-07 - ga plansSuperseded Document · PDF8 Aug 2025View
Levels 08-09 and 10 - ga plansSuperseded Document · PDF8 Aug 2025View
Whole building sectionCase Copy Drawings · PDF8 Aug 2025View
Roof planSuperseded Document · PDF8 Aug 2025View
Existing elevations and sectionsCase Copy Drawings · PDF8 Aug 2025View
Level 00 and 01 - ga plansSuperseded Document · PDF8 Aug 2025View
Proposed north elevationSuperseded Document · PDF8 Aug 2025View
Proposed east elevationSuperseded Document · PDF8 Aug 2025View
Proposed south elevationSuperseded Document · PDF8 Aug 2025View
Ground floor plan - existingCase Copy Drawings · PDF8 Aug 2025View
Application formApplication Form · PDF8 Aug 2025View
Location planSite Location Plan · PDF8 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Actual Committee Date

    Published milestoneCouncil source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.