Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
SUN WHARF, CREEKSIDE, LONDON, SE8 3DZ
Last published check: 1 Oct 2026, 17:31. Check the council record for more recent changes.
SUN WHARF, CREEKSIDE, LONDON, SE8 3DZ
This record has no verified map location.
View council mapDemolition of all existing buildings and comprehensive redevelopment to provide three new buildings comprising residential dwellings (C3), purpose built student accommodation (sui generis) and commercial floorspace (Use Classes E(b) - Cafe; E(g) - Office/ Light Industrial; and B8 - Storage unit), together with landscaping, public realm works, improvements to river wall and public riverside walkway, wheelchair accessible parking, cycle parking, refuse/ recycling stores and all associated works at Sun Wharf, Creekside SE8. Please Note: This is one of two concurrent planning applications for the Sun Wharf site. The second application (reference: DC/25/140992) does not include the provision of Use Class B8.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Microclimate updateCase Copy Documents · PDF | 19 Jan 2026 | View |
| Section 1 (block a1 with courtyard north elevation)Case Copy Drawings · PDF | 16 Jan 2026 | View |
| Level 19 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Levels 8-18 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Level 7 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Levels 2-6 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Level 1 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Ground floor plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Roof plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 6th floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 5th floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 4th floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 3rd floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 2nd floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 1st floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Ground floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Basement level 1Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Roof planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 19th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 18th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 17th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 16th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 15th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 14th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 13th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 12th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 11th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 10th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 9th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 8th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 7th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 6th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 5th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 4th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Third floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Second floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| First floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Ground floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b south and north elevations (rendered)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a south and north elevations (rendered).Case Copy Drawings · PDF | 7 Jan 2026 | View |
| West elevation (rendered)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| East elevation (rendered)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Container elevationsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| North elevation (pbsa)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| South elevation (residential)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| North elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| South elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| West elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| East elevation with river wallCase Copy Drawings · PDF | 7 Jan 2026 | View |
| East elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Container sectionsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 6 (block a1, a2 and b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 5 (wing blocks with courtyard west elevation)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 4 (block b with courtyard north elevation)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 3 (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 2 (block a2 with courtyard south elevation)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b south elevation, residential entranceCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 wing south elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 west elevation, pbsa main entranceCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 and a2 link west elevation, pbsa second entranceCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 east elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| MasterplanCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Existing site elevationsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Existing site planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Location planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Drawing scheduleCase Copy Drawings · PDF | 7 Jan 2026 | View |
| LandscapingCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Materials strategy lrCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Landscaping 2Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Container unit - floor plansCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 wing - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 wing - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - level 19 planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - level 19 planblock a1 - upper floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - level 7 planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - lower floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 09Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 08Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 07Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 06Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 05Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 04Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 03aCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 03Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 02 (wheelchair accessible flat)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 01aCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 01Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Drawing issue register_pl submission-revp3Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Sun wharf post submission amendments cover letterCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Sun wharf_gla ce memo_stage 1_11.09.25Case Copy Documents | 21 Nov 2025 | View |
| Sun wharf pre-redevelopment auditCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf pre-demo auditCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf owmp.Case Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf ce statementCase Copy Documents · PDF | 21 Nov 2025 | View |
| Overheating_closed window scenarioCase Copy Documents · PDF | 21 Nov 2025 | View |
| Lpg_-_wlca_assessment_sun_wharfCase Copy Documents | 21 Nov 2025 | View |
| Good homes alliance (gha) early stage overheating risk tool - copyCase Copy Documents · PDF | 21 Nov 2025 | View |
| Gla_circular_economy_statements_template _sun_wharfCase Copy Documents | 21 Nov 2025 | View |
| Gla wlca report sun wharfCase Copy Documents · PDF | 21 Nov 2025 | View |
| Circular economy workshop minutesCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf energy strategy+bruklsCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf part l gla spreadsheet_comments updateCase Copy Documents | 21 Nov 2025 | View |
| Sun wharf - gla consultation (stage 1) - energy memo 2025Case Copy Documents | 21 Nov 2025 | View |
| Sun wharf_gla wlc memo_11.09.25Case Copy Documents | 21 Nov 2025 | View |
| Sun wharf - be seen spreadsheet 251103Case Copy Documents | 21 Nov 2025 | View |
| Energy updatesCase Copy Documents | 21 Nov 2025 | View |
| Ea crane access for maintenance and working room on waterside edgeCase Copy Drawings · PDF | 31 Oct 2025 | View |
| Ea ga plan proposedCase Copy Drawings · PDF | 31 Oct 2025 | View |
| Ea section proposedCase Copy Drawings · PDF | 31 Oct 2025 | View |
| Appendix 6.1Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.2aCase Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.2bCase Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.3Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.4Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.5Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.6Case Copy Documents · PDF | 9 Oct 2025 | View |
| Es volume ii townscape and visual impact appraisal - separate visionCase Copy Documents · PDF | 28 Aug 2025 | View |
| Design and access statement full versionCase Copy Documents · PDF | 28 Aug 2025 | View |
| Planning statement (updated)Case Copy Documents · PDF | 14 Aug 2025 | View |
| Traffic and transportCase Copy Documents · PDF | 14 Aug 2025 | View |
| Daylight sunlight and overshadowingCase Copy Documents · PDF | 13 Aug 2025 | View |
| Residual effects, mitigation and cumulative schemesCase Copy Documents · PDF | 13 Aug 2025 | View |
| Drawings of existing proposed and surrounding buildinCase Copy Documents · PDF | 13 Aug 2025 | View |
| Detailed results of the daylight and sunlight assessCase Copy Documents · PDF | 13 Aug 2025 | View |
| Detailed results of the daylight and sunlight assessCase Copy Documents · PDF | 13 Aug 2025 | View |
| Daylight and sunlight reportCase Copy Documents · PDF | 13 Aug 2025 | View |
| Scoping bird surveyCase Copy Documents · PDF | 13 Aug 2025 | View |
| Biodiversity net gain assessment (bng)Case Copy Documents · PDF | 13 Aug 2025 | View |
| Wind microclimate reportCase Copy Documents · PDF | 13 Aug 2025 | View |
| Es volume iv non technical summary (nts)Case Copy Documents · PDF | 13 Aug 2025 | View |
| Sunwharf-das-chapter5.6-5.7Case Copy Documents · PDF | 13 Aug 2025 | View |
| Sunwharf-das-chapter7.1-7.6Case Copy Documents · PDF | 13 Aug 2025 | View |
| Sunwharf-das-chapter10Case Copy Documents · PDF | 13 Aug 2025 | View |
| Detailed_results_of_the_daylight_and_sunlight_assessCase Copy Documents · PDF | 11 Aug 2025 | View |
| Ground master planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Roof planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Landscape strategy 1 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Landscape strategy 2 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Over heating reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Archaeological desk based assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Ground floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| First floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Second floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Third floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Fourth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Fifth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Sixth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Seventh floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Eighth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Ninth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Tenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Eleventh floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Twelfth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Thirteenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Fourteenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Fifteenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Sixteenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Seventeenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Eighteenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Ninteenth floorCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Roof planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Basement level 1Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Basement level 2Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Ground floor plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| 1st floor plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| 2nd floor plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| 3rdfloor plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| 4th floor plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| 5th floor plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| 6th floor plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Roof plan plan block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| East elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| West elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| South elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| North elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| South elevation residentialCase Copy Drawings · PDF | 4 Aug 2025 | View |
| North elevation pbsaCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Container elevationsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| East elevation renderedCase Copy Drawings · PDF | 4 Aug 2025 | View |
| West elevation renderedCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a south and north elevations renderedCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b south and north elevations renderedCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 east elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 and a2 link west elevation, pbsa second entranceCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a2 west elevation, pbsa main entranceCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 wing south elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b south elevation, residential entranceCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Section 1 - block a1 with courtyard north elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Section 2 - block a2 with courtyard south elevation)Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Section 3 block bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Section 4 - block b with courtyard north elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Section 5 wing blocks with courtyard west elevationCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Section 6 block a1, a2 and bCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Container sectionsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 - lower floor planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 - level 7 planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 - upper floor planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 - level 19 planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a2 - typical floor planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a1 wing - typical floor planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block a2 wing - typical floor planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Container unit - floor plansCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 01Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 01aCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 02 wheelchair accessible flatCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 03Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 03aCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 04Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 05Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 06Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 07Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 08Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 09Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Location planSite Location Plan · PDF | 4 Aug 2025 | View |
| Existing site planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Existing site elevationsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| MasterplanCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Pre-assessment reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Gla spreadsheetCase Copy Documents | 4 Aug 2025 | View |
| Site waste management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Operational waste management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Circular economy statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Energy strategy reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Student management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Utilities & services statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Historic drawingsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Scheme drawingsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Pre-application engagementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Application formApplication Form · PDF | 4 Aug 2025 | View |
| Community auditCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Townscape and visual impact assessment part 1Case Copy Documents · PDF | 4 Aug 2025 | View |
| Townscape and visual impact assessment part 2Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Location planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Appendix 1 2 location of specified information in the esCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Eia scoping reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Site descriptionCase Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix 1.5: competency statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix 1 6 scoping response tableCase Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix 1 7 cumulative schemesCase Copy Documents · PDF | 4 Aug 2025 | View |
| Details of drawingsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Air quality assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Heritage asset planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Heritage statement 1 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Heritage statement 2 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Existing condition plan viewCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Daylight and sunlight analysis 1 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Sunlight amenity study existing vs proposed 21st marchCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Overshadowing 21st march equinox hourly shadowsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Reflected solar glareCase Copy Documents · PDF | 4 Aug 2025 | View |
| Preliminary ecological appraisalCase Copy Documents · PDF | 4 Aug 2025 | View |
| Noise and vibration assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Consultation part 1 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Consultation part 2 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Windowless sample logCase Copy Documents · PDF | 4 Aug 2025 | View |
| Determination of particle size distributionCase Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Hazard waste assessment detailsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix 1 ? figuresCase Copy Documents · PDF | 4 Aug 2025 | View |
| 5 hydrogeology - superficial aquiferCase Copy Documents · PDF | 4 Aug 2025 | View |
| 16 boreholesCase Copy Documents · PDF | 4 Aug 2025 | View |
| 1897, 1897, 1897 london, 3-plan compositeCase Copy Documents · PDF | 4 Aug 2025 | View |
| Flood mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| National planning policyCase Copy Documents · PDF | 4 Aug 2025 | View |
| Health impact assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Healthy streets transport assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix a ? (ta) proposed scheme drawingsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Appendix b ? (ta) routes taken and photos for atz assessmentCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Healthy streets transport assessmentCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Framework travel planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Delivery and servicing managementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Ground floor masterplanCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Car parking management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Outline construction logistics planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Outline construction logistics plan part 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| C0nstruction logistics plan - regional routingCase Copy Drawings · PDF | 4 Aug 2025 | View |
| C0nstruction logistics plan - local routingCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Transport scoping noteCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Flood risk assessment & drainage strategyCase Copy Documents · PDF | 4 Aug 2025 | View |
| Summary of proposed mitigation measuresCase Copy Documents · PDF | 4 Aug 2025 | View |
| Whole life cycle carbon assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Gla - circular economy statement templateCase Copy Documents | 4 Aug 2025 | View |
| Wlca assessmentCase Copy Documents | 4 Aug 2025 | View |
| Fire statement formCase Copy Documents · PDF | 4 Aug 2025 | View |
| River impact studyCase Copy Documents · PDF | 4 Aug 2025 | View |
| Statement of community involvementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Cover letterCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statement - contents and glossaryCase Copy Documents · PDF | 4 Aug 2025 | View |
| London plan fire statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Pbsa demand & market assessment sun wharf, creeksideCase Copy Documents · PDF | 4 Aug 2025 | View |
| Commercial soaCase Copy Documents · PDF | 4 Aug 2025 | View |
| Pbsa soaCase Copy Documents · PDF | 4 Aug 2025 | View |
| Resi soaCase Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 1Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 3Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 4Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 5Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 6Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 7Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 8Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 9Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 10Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 11Case Copy Documents · PDF | 4 Aug 2025 | View |
| Designing out crimeCase Copy Documents · PDF | 4 Aug 2025 | View |
| The statutory metric macroCase Copy Documents | 4 Aug 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.