Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
SUN WHARF, CREEKSIDE, LONDON, SE8 3DZ
Last published check: 1 Oct 2026, 17:22. Check the council record for more recent changes.
SUN WHARF, CREEKSIDE, LONDON, SE8 3DZ
This record has no verified map location.
View council mapDemolition of all existing buildings and comprehensive redevelopment to provide three new buildings, comprising residential dwellings (C3), purpose built student accommodation (sui generis) and commercial floorspace (Use Class E(b) - Cafe; and E(g) - Office/ Light Industrial), together with landscaping, public realm works, improvements to river wall and public riverside walkway, wheelchair accessible parking, cycle parking and refuse/ recycling stores and all associated works at Sun Wharf, Creekside SE8. Please Note: This is one of two concurrent planning applications for the Sun Wharf site. The second application (reference: DC/25/141007) includes the provision of a Storage unit (Use Class B8).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Rb greenwichCase Copy Documents · PDF | 24 Feb 2026 | View |
| Sunwharf - commercial soaCase Copy Documents · PDF | 23 Feb 2026 | View |
| Hse 2Case Copy Documents · PDF | 23 Feb 2026 | View |
| Applicant equality impact assessmentCase Copy Documents · PDF | 20 Feb 2026 | View |
| Mirror image assessmentCase Copy Documents · PDF | 19 Feb 2026 | View |
| Luc - sun wharf mirror-image reviewCase Copy Documents · PDF | 19 Feb 2026 | View |
| Hse commentsCase Copy Documents · PDF | 10 Feb 2026 | View |
| Planning gateway one formCase Copy Documents · PDF | 10 Feb 2026 | View |
| London plan fire statement - r1 issue 6Case Copy Documents · PDF | 10 Feb 2026 | View |
| Tracked changes - sun wharf, london - london plan fire statement - r1 issue 6Case Copy Documents · PDF | 10 Feb 2026 | View |
| Tracked changes planning gateway one form - issue 6Case Copy Documents · PDF | 10 Feb 2026 | View |
| Local meeting minutesOfficer Report · PDF | 6 Feb 2026 | View |
| Arcaero response 6 februaryCase Copy Documents · PDF | 6 Feb 2026 | View |
| Luc responseCase Copy Documents · PDF | 2 Feb 2026 | View |
| Sunlight on ground amendedCase Copy Drawings · PDF | 2 Feb 2026 | View |
| Lbl policy commentsCase Copy Documents | 2 Feb 2026 | View |
| Lbl urban design commentsCase Copy Documents | 2 Feb 2026 | View |
| Met police.Case Copy Documents · PDF | 2 Feb 2026 | View |
| Historic englandCase Copy Documents · PDF | 2 Feb 2026 | View |
| GlaasCase Copy Documents · PDF | 2 Feb 2026 | View |
| Environment agencyCase Copy Documents · PDF | 2 Feb 2026 | View |
| Consultee commentCase Copy Documents · PDF | 2 Feb 2026 | View |
| Es clarification noteCase Copy Documents · PDF | 26 Jan 2026 | View |
| CommentCase Copy Documents · PDF | 23 Jan 2026 | View |
| RecordingCase Copy Documents | 21 Jan 2026 | View |
| Microclimate updateCase Copy Documents · PDF | 19 Jan 2026 | View |
| Landscape part 2Case Copy Documents · PDF | 19 Jan 2026 | View |
| Landscape part 1Case Copy Documents · PDF | 19 Jan 2026 | View |
| AddendumdasCase Copy Documents · PDF | 12 Jan 2026 | View |
| Level 19 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Levels 8-18 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Level 7 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Levels 2-6 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Level 1 plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Ground floor plan (block a)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Roof plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 6th floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 5th floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 4th floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 3rd floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 2nd floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| 1st floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Ground floor plan (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Basement level 1Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Roof planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 19th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 18th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 17th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 16th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 15th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 14th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 13th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 12th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 11th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Tenth floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 9th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 8th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 7th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 6th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 5th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 4th floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 3rd floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 2nd floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| 1st floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Ground floorCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b south and north elevations (rendered)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a south and north elevations (rendered)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| West elevation (rendered)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| East elevation (rendered)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Container elevationsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| North elevation (pbsa)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| South elevation (residential)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| North elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| South elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| West elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| East elevation with river wallCase Copy Drawings · PDF | 7 Jan 2026 | View |
| East elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Container sectionsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 6 (block a1, a2 and b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 5 (wing blocks with courtyard west elevation)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 4 (block b with courtyard north elevation).Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 3 (block b)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 2 (block a2 with courtyard south elevation)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Section 1 (block a1 with courtyard north elevation)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b south elevation, residential entranceCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 wing south elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 west elevation, pbsa main entranceCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 and a2 link west elevation, pbsa second entranceCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 east elevationCase Copy Drawings · PDF | 7 Jan 2026 | View |
| MasterplanCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Existing site elevationsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Existing site planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Location planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Drawing scheduleCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Case Copy DrawingsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Materials strategy lrCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Case Copy DrawingsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Container unit - floor plansCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 wing - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 wing - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - level 19 planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - upper floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - level 7 planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - lower floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - lower floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Container unit - floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 wing - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 wing - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a2 - typical floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - level 19 planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - upper floor planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block a1 - level 7 planCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 09Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 08Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 07Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 06Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 05Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 04Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 03aCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 03Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 02 (wheelchair accessible flat)Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 01aCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Block b - flat type 01Case Copy Drawings · PDF | 7 Jan 2026 | View |
| Case Copy DrawingsCase Copy Drawings · PDF | 7 Jan 2026 | View |
| Sun wharf post submission amendments cover letterRevised Document · PDF | 7 Jan 2026 | View |
| Sun wharf post submission amendments cover letter.Case Copy Documents · PDF | 7 Jan 2026 | View |
| Sunwharf-addendumdasCase Copy Documents · PDF | 7 Jan 2026 | View |
| Sun wharf es review and clarification noteCase Copy Documents · PDF | 7 Jan 2026 | View |
| Chapter 13 water environment final ardentCase Copy Documents | 7 Jan 2026 | View |
| Second sun wharf es clarification noteCase Copy Documents · PDF | 7 Jan 2026 | View |
| Post submission amendments cover letterCase Copy Documents · PDF | 6 Jan 2026 | View |
| Daylight and sunlight report (consented vs. proposed)Case Copy Documents · PDF | 1 Dec 2025 | View |
| Results of the solar glare assessmentCase Copy Documents · PDF | 1 Dec 2025 | View |
| Results of the transient overshadowing assessmentCase Copy Documents · PDF | 1 Dec 2025 | View |
| (overshadowing) assessment within neighbouring amenity spacesCase Copy Documents · PDF | 1 Dec 2025 | View |
| With balconies removed)Case Copy Documents · PDF | 1 Dec 2025 | View |
| Detailed results of the daylight and sunlight assessment within neighbouring proCase Copy Documents · PDF | 1 Dec 2025 | View |
| Drawings of the existing, proposed and surrounding buildingsCase Copy Documents · PDF | 1 Dec 2025 | View |
| S volume i chapter 12 wind microclimate [nov 2025]Case Copy Documents · PDF | 28 Nov 2025 | View |
| Es volume i chapter 12 wind microclimate [nov 2025]Case Copy Documents · PDF | 24 Nov 2025 | View |
| Sun wharf - be seen spreadsheet 251103Case Copy Documents | 21 Nov 2025 | View |
| Sun wharf pre-redevelopment auditCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf pre-demo auditCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf owmpCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf ce statementCase Copy Documents · PDF | 21 Nov 2025 | View |
| Overheating_closed window scenarioCase Copy Documents · PDF | 21 Nov 2025 | View |
| Lpg_-_wlca_assessment_sun_wharfCase Copy Documents | 21 Nov 2025 | View |
| Good homes alliance (gha) early stage overheating risk toolCase Copy Documents · PDF | 21 Nov 2025 | View |
| Gla_circular_economy_statements_template _sun_wharfCase Copy Documents | 21 Nov 2025 | View |
| Gla wlca report sun wharfCase Copy Documents · PDF | 21 Nov 2025 | View |
| Circular economy workshop minutesCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf energy strategy+bruklsCase Copy Documents · PDF | 21 Nov 2025 | View |
| Sun wharf part l gla spreadsheet_comments updateCase Copy Documents | 21 Nov 2025 | View |
| Sun wharf - gla consultation (stage 1) - energy memo 2025Case Copy Documents | 21 Nov 2025 | View |
| Sun wharf_gla wlc memo_11.09.25Case Copy Documents | 21 Nov 2025 | View |
| Sun wharf_gla ce memo_stage 1_11.09.25Case Copy Documents | 21 Nov 2025 | View |
| Energy updatesCase Copy Documents | 21 Nov 2025 | View |
| Ea section proposedCase Copy Drawings · PDF | 31 Oct 2025 | View |
| Ea ga plan proposedCase Copy Drawings · PDF | 31 Oct 2025 | View |
| Ea crane access for maintenance and working room on waterside edgeCase Copy Drawings · PDF | 31 Oct 2025 | View |
| Appendix 6.1Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.2aCase Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.2bCase Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.3Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.4Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.5Case Copy Documents · PDF | 9 Oct 2025 | View |
| Appendix 6.6Case Copy Documents · PDF | 9 Oct 2025 | View |
| CommentCase Copy Documents · PDF | 5 Sept 2025 | View |
| CommentCase Copy Documents · PDF | 3 Sept 2025 | View |
| Design and access statement full versionCase Copy Documents · PDF | 28 Aug 2025 | View |
| Es volume ii townscape and visual impact appraisal - separate visionCase Copy Documents · PDF | 28 Aug 2025 | View |
| CommentCase Copy Documents · PDF | 27 Aug 2025 | View |
| CommentCase Copy Documents · PDF | 22 Aug 2025 | View |
| CommentCase Copy Documents · PDF | 22 Aug 2025 | View |
| Drp 2 panel responseCase Copy Documents · PDF | 21 Aug 2025 | View |
| Drp 1 panel responseCase Copy Documents · PDF | 21 Aug 2025 | View |
| CommentCase Copy Documents | 19 Aug 2025 | View |
| Traffic and transportCase Copy Documents · PDF | 14 Aug 2025 | View |
| Planning statement (updated)Case Copy Documents · PDF | 14 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 13 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 13 Aug 2025 | View |
| Drawings of existing proposed and surrounding buildinCase Copy Documents · PDF | 13 Aug 2025 | View |
| Detailed results of the daylight and sunlight assessCase Copy Documents · PDF | 13 Aug 2025 | View |
| Detailed results of the daylight and sunlight assessCase Copy Documents · PDF | 13 Aug 2025 | View |
| Daylight and sunlight reportCase Copy Documents · PDF | 13 Aug 2025 | View |
| Scoping bird surveyCase Copy Documents · PDF | 13 Aug 2025 | View |
| Biodiversity net gain assessment (bng)Case Copy Documents · PDF | 13 Aug 2025 | View |
| Wind microclimate reportCase Copy Documents · PDF | 13 Aug 2025 | View |
| Non technical summary (nts)Case Copy Documents · PDF | 13 Aug 2025 | View |
| Detailed_results_of_the_daylight_and_sunlight_assess 2Case Copy Documents · PDF | 11 Aug 2025 | View |
| Ground floor masterplanCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Roof planSuperseded Document · PDF | 4 Aug 2025 | View |
| Landscape strategyCase Copy Documents · PDF | 4 Aug 2025 | View |
| Landscape strategyCase Copy Documents · PDF | 4 Aug 2025 | View |
| Overheating reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Archaeological desk based assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Ground floorSuperseded Document · PDF | 4 Aug 2025 | View |
| First floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Second floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Third floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Fourth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Fifth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Sixth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Seventh floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Eighth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Ninth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Tenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Eleventh floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Twelfth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Thirteenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Fourteenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Fifteenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Sixteenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Seventeenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Eighteenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Nineteenth floorSuperseded Document · PDF | 4 Aug 2025 | View |
| Roof planSuperseded Document · PDF | 4 Aug 2025 | View |
| Basement level 1Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Basement level 2Superseded Document · PDF | 4 Aug 2025 | View |
| Ground floor plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| 1st floor plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| 2nd floor plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| 3rd floor plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| 4th floor plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| 5th floor plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| 6th floor plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| Roof plan block bSuperseded Document · PDF | 4 Aug 2025 | View |
| East elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| East elevation with river wallSuperseded Document · PDF | 4 Aug 2025 | View |
| West elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| South elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| North elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| South elevation residentialSuperseded Document · PDF | 4 Aug 2025 | View |
| North elevation pbsaSuperseded Document · PDF | 4 Aug 2025 | View |
| Container elevationsSuperseded Document · PDF | 4 Aug 2025 | View |
| East elevation renderedSuperseded Document · PDF | 4 Aug 2025 | View |
| West elevation renderedSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a south & north elevations renderedSuperseded Document · PDF | 4 Aug 2025 | View |
| Block b south & north elevations renderedSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 east elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 and a2 link west elevation, pbsa second entranceSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a2 west elevation, pbsa main entranceSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 wing south elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| Block b south elevation, residential entranceSuperseded Document · PDF | 4 Aug 2025 | View |
| Section 1 - block a1 with courtyard north elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| Section 2 - block a2 with courtyard south elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| Section 3 - block bSuperseded Document · PDF | 4 Aug 2025 | View |
| Section 4 - block b with courtyard north elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| Section 5 -wing blocks with courtyard west elevationSuperseded Document · PDF | 4 Aug 2025 | View |
| Section 6 - block a1, a2 and bSuperseded Document · PDF | 4 Aug 2025 | View |
| Container sectionsSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 - lower floor planSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 - level 7 planSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 - upper floor planSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 - level 19 planSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a2 - typical floor planSuperseded Document · PDF | 4 Aug 2025 | View |
| Block a1 wing - typical floor planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 05Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 06Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 07Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 08Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Block b - flat type 09Case Copy Drawings · PDF | 4 Aug 2025 | View |
| Location planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Existing site planCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Existing site elevationsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| MasterplanCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Pre-assessment reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Part l gla spreadsheet finaCase Copy Documents | 4 Aug 2025 | View |
| Site waste management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Operational waste management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Circular economy statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Energy strategy reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Student management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Utilities & services statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Application formApplication Form · PDF | 4 Aug 2025 | View |
| Community auditCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Townscape and visual impact assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Figure 9-4 - zone of theoretical visibiltyCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Location planSite Location Plan · PDF | 4 Aug 2025 | View |
| Appendix 1-2 location of specified information in the esCase Copy Documents · PDF | 4 Aug 2025 | View |
| Eia scoping reportCase Copy Documents · PDF | 4 Aug 2025 | View |
| Eia scoping opinionCase Copy Documents · PDF | 4 Aug 2025 | View |
| Competency statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix 1-6 scoping response tableCase Copy Documents · PDF | 4 Aug 2025 | View |
| Cumulative schemesCase Copy Documents · PDF | 4 Aug 2025 | View |
| Details for drawingsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Air quality assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Heritage asset planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Heritage statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Heritage statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Existing conditions & proposed development plan viewCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Daylight and sunlight analysis resultsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Daylight and sunlight analysis resultsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Sunlight amenity study existing vs proposed 21st marchCase Copy Documents · PDF | 4 Aug 2025 | View |
| Overshadowing 21st march equinox hourly shadowsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Reflected solar glareCase Copy Documents · PDF | 4 Aug 2025 | View |
| Preliminary ecological appraisalCase Copy Documents · PDF | 4 Aug 2025 | View |
| Noise and vibration assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Consultation part 1 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Consultation part 2 of 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessment- mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Geo-environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Geo-environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Geo-environmental assessment - mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Windowless sample logCase Copy Documents · PDF | 4 Aug 2025 | View |
| Determination of particle size distributionCase Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessment - mapsCase Copy Documents · PDF | 4 Aug 2025 | View |
| Geo-environmental assessment - phase 1-1 part 3 of 3Case Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix 1 ? figuresCase Copy Documents · PDF | 4 Aug 2025 | View |
| 5 hydrogeology - superficial aquiferCase Copy Documents · PDF | 4 Aug 2025 | View |
| 16 boreholesCase Copy Documents · PDF | 4 Aug 2025 | View |
| 1897, 1897, 1897 london, 3-plan compositeCase Copy Documents · PDF | 4 Aug 2025 | View |
| Flood mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Flood mapsCase Copy Drawings · PDF | 4 Aug 2025 | View |
| Policy reviewCase Copy Documents · PDF | 4 Aug 2025 | View |
| Health impact assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Healthy streets transport assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Healthy streets transport assessment part 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Appendix b ? routes taken and photos for atz assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Rank order for land use 03 residentialCase Copy Documents · PDF | 4 Aug 2025 | View |
| Framework travel planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Delivery and servicing management plan part 1Case Copy Documents · PDF | 4 Aug 2025 | View |
| Ground floor masterplanSuperseded Document · PDF | 4 Aug 2025 | View |
| Car parking management planCase Copy Documents · PDF | 4 Aug 2025 | View |
| Outline construction logistics plan part 1Case Copy Documents · PDF | 4 Aug 2025 | View |
| Outline construction logistics plan part 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Outline construction logistics plan part 3Case Copy Documents · PDF | 4 Aug 2025 | View |
| Outline construction logistics plan part 4Case Copy Documents · PDF | 4 Aug 2025 | View |
| Transport scoping noteCase Copy Documents · PDF | 4 Aug 2025 | View |
| Flood risk assessment & drainage strategyCase Copy Documents · PDF | 4 Aug 2025 | View |
| Summary of proposed mitigation measuresCase Copy Documents · PDF | 4 Aug 2025 | View |
| Whole life cycle carbon assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Gla - circular economy statement templateCase Copy Documents | 4 Aug 2025 | View |
| Wlca assessmentCase Copy Documents | 4 Aug 2025 | View |
| Fire statement formCase Copy Documents · PDF | 4 Aug 2025 | View |
| River impact studyCase Copy Documents · PDF | 4 Aug 2025 | View |
| River impact study - appendix b 1 of 3Case Copy Documents · PDF | 4 Aug 2025 | View |
| River impact study - appendix b 2 of 3Case Copy Documents · PDF | 4 Aug 2025 | View |
| River impact study - appendix b 3 of 3Case Copy Documents · PDF | 4 Aug 2025 | View |
| Statement of community involvementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Cover letterCase Copy Documents · PDF | 4 Aug 2025 | View |
| Environmental statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| London plan fire statementCase Copy Documents · PDF | 4 Aug 2025 | View |
| Pbsa demand & market assessmentCase Copy Documents · PDF | 4 Aug 2025 | View |
| Commercial soaCase Copy Documents · PDF | 4 Aug 2025 | View |
| Pbsa soaCase Copy Documents · PDF | 4 Aug 2025 | View |
| Resi soaCase Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 1Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 2Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 3Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 4Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 5Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 6Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 7Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 8Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 9Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 10Case Copy Documents · PDF | 4 Aug 2025 | View |
| Design & access statement 11Case Copy Documents · PDF | 4 Aug 2025 | View |
| Designing out crimeCase Copy Documents · PDF | 4 Aug 2025 | View |
| Statutory metric macro enabledCase Copy Documents | 4 Aug 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.