Council planning record

Demolition of all existing buildings and comprehensive redevelopment to provide three new buildings, comprising residential dwellings (C3), purpose built student accommodation (sui generis) and commercial floorspace (Use Class E(b) - Cafe; and E(g) - Office/ Light Industrial), together with landscaping, public realm works, improvements to river wall and public riverside walkway, wheelchair accessible parking, cycle parking and refuse/ recycling stores and all associated works at Sun Wharf, Creekside SE8. Please Note: This is one of two concurrent planning applications for the Sun Wharf site. The second application (reference: DC/25/141007) includes the provision of a Storage unit (Use Class B8).

SUN WHARF, CREEKSIDE, LONDON, SE8 3DZ

RegisteredReference: DC/25/140992London Borough of Lewisham

Last published check: 1 Oct 2026, 17:22. Check the council record for more recent changes.

Application location

SUN WHARF, CREEKSIDE, LONDON, SE8 3DZ

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Planning Permission
Received
1 Aug 2025
Validated
4 Aug 2025
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

Demolition of all existing buildings and comprehensive redevelopment to provide three new buildings, comprising residential dwellings (C3), purpose built student accommodation (sui generis) and commercial floorspace (Use Class E(b) - Cafe; and E(g) - Office/ Light Industrial), together with landscaping, public realm works, improvements to river wall and public riverside walkway, wheelchair accessible parking, cycle parking and refuse/ recycling stores and all associated works at Sun Wharf, Creekside SE8. Please Note: This is one of two concurrent planning applications for the Sun Wharf site. The second application (reference: DC/25/141007) includes the provision of a Storage unit (Use Class B8).

Proposal details

Reference
DC/25/140992
Alternative references
PP-13932722
Ward
Deptford
Agent
Savills (UK) Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 374 of 374

DocumentPublishedAction
Rb greenwichCase Copy Documents · PDF24 Feb 2026View
Sunwharf - commercial soaCase Copy Documents · PDF23 Feb 2026View
Hse 2Case Copy Documents · PDF23 Feb 2026View
Applicant equality impact assessmentCase Copy Documents · PDF20 Feb 2026View
Mirror image assessmentCase Copy Documents · PDF19 Feb 2026View
Luc - sun wharf mirror-image reviewCase Copy Documents · PDF19 Feb 2026View
Hse commentsCase Copy Documents · PDF10 Feb 2026View
Planning gateway one formCase Copy Documents · PDF10 Feb 2026View
London plan fire statement - r1 issue 6Case Copy Documents · PDF10 Feb 2026View
Tracked changes - sun wharf, london - london plan fire statement - r1 issue 6Case Copy Documents · PDF10 Feb 2026View
Tracked changes planning gateway one form - issue 6Case Copy Documents · PDF10 Feb 2026View
Local meeting minutesOfficer Report · PDF6 Feb 2026View
Arcaero response 6 februaryCase Copy Documents · PDF6 Feb 2026View
Luc responseCase Copy Documents · PDF2 Feb 2026View
Sunlight on ground amendedCase Copy Drawings · PDF2 Feb 2026View
Lbl policy commentsCase Copy Documents2 Feb 2026View
Lbl urban design commentsCase Copy Documents2 Feb 2026View
Met police.Case Copy Documents · PDF2 Feb 2026View
Historic englandCase Copy Documents · PDF2 Feb 2026View
GlaasCase Copy Documents · PDF2 Feb 2026View
Environment agencyCase Copy Documents · PDF2 Feb 2026View
Consultee commentCase Copy Documents · PDF2 Feb 2026View
Es clarification noteCase Copy Documents · PDF26 Jan 2026View
CommentCase Copy Documents · PDF23 Jan 2026View
RecordingCase Copy Documents21 Jan 2026View
Microclimate updateCase Copy Documents · PDF19 Jan 2026View
Landscape part 2Case Copy Documents · PDF19 Jan 2026View
Landscape part 1Case Copy Documents · PDF19 Jan 2026View
AddendumdasCase Copy Documents · PDF12 Jan 2026View
Level 19 plan (block a)Case Copy Drawings · PDF7 Jan 2026View
Levels 8-18 plan (block a)Case Copy Drawings · PDF7 Jan 2026View
Level 7 plan (block a)Case Copy Drawings · PDF7 Jan 2026View
Levels 2-6 plan (block a)Case Copy Drawings · PDF7 Jan 2026View
Level 1 plan (block a)Case Copy Drawings · PDF7 Jan 2026View
Ground floor plan (block a)Case Copy Drawings · PDF7 Jan 2026View
Roof plan (block b)Case Copy Drawings · PDF7 Jan 2026View
6th floor plan (block b)Case Copy Drawings · PDF7 Jan 2026View
5th floor plan (block b)Case Copy Drawings · PDF7 Jan 2026View
4th floor plan (block b)Case Copy Drawings · PDF7 Jan 2026View
3rd floor plan (block b)Case Copy Drawings · PDF7 Jan 2026View
2nd floor plan (block b)Case Copy Drawings · PDF7 Jan 2026View
1st floor plan (block b)Case Copy Drawings · PDF7 Jan 2026View
Ground floor plan (block b)Case Copy Drawings · PDF7 Jan 2026View
Basement level 1Case Copy Drawings · PDF7 Jan 2026View
Roof planCase Copy Drawings · PDF7 Jan 2026View
19th floorCase Copy Drawings · PDF7 Jan 2026View
18th floorCase Copy Drawings · PDF7 Jan 2026View
17th floorCase Copy Drawings · PDF7 Jan 2026View
16th floorCase Copy Drawings · PDF7 Jan 2026View
15th floorCase Copy Drawings · PDF7 Jan 2026View
14th floorCase Copy Drawings · PDF7 Jan 2026View
13th floorCase Copy Drawings · PDF7 Jan 2026View
12th floorCase Copy Drawings · PDF7 Jan 2026View
11th floorCase Copy Drawings · PDF7 Jan 2026View
Tenth floorCase Copy Drawings · PDF7 Jan 2026View
9th floorCase Copy Drawings · PDF7 Jan 2026View
8th floorCase Copy Drawings · PDF7 Jan 2026View
7th floorCase Copy Drawings · PDF7 Jan 2026View
6th floorCase Copy Drawings · PDF7 Jan 2026View
5th floorCase Copy Drawings · PDF7 Jan 2026View
4th floorCase Copy Drawings · PDF7 Jan 2026View
3rd floorCase Copy Drawings · PDF7 Jan 2026View
2nd floorCase Copy Drawings · PDF7 Jan 2026View
1st floorCase Copy Drawings · PDF7 Jan 2026View
Ground floorCase Copy Drawings · PDF7 Jan 2026View
Block b south and north elevations (rendered)Case Copy Drawings · PDF7 Jan 2026View
Block a south and north elevations (rendered)Case Copy Drawings · PDF7 Jan 2026View
West elevation (rendered)Case Copy Drawings · PDF7 Jan 2026View
East elevation (rendered)Case Copy Drawings · PDF7 Jan 2026View
Container elevationsCase Copy Drawings · PDF7 Jan 2026View
North elevation (pbsa)Case Copy Drawings · PDF7 Jan 2026View
South elevation (residential)Case Copy Drawings · PDF7 Jan 2026View
North elevationCase Copy Drawings · PDF7 Jan 2026View
South elevationCase Copy Drawings · PDF7 Jan 2026View
West elevationCase Copy Drawings · PDF7 Jan 2026View
East elevation with river wallCase Copy Drawings · PDF7 Jan 2026View
East elevationCase Copy Drawings · PDF7 Jan 2026View
Container sectionsCase Copy Drawings · PDF7 Jan 2026View
Section 6 (block a1, a2 and b)Case Copy Drawings · PDF7 Jan 2026View
Section 5 (wing blocks with courtyard west elevation)Case Copy Drawings · PDF7 Jan 2026View
Section 4 (block b with courtyard north elevation).Case Copy Drawings · PDF7 Jan 2026View
Section 3 (block b)Case Copy Drawings · PDF7 Jan 2026View
Section 2 (block a2 with courtyard south elevation)Case Copy Drawings · PDF7 Jan 2026View
Section 1 (block a1 with courtyard north elevation)Case Copy Drawings · PDF7 Jan 2026View
Block b south elevation, residential entranceCase Copy Drawings · PDF7 Jan 2026View
Block a1 wing south elevationCase Copy Drawings · PDF7 Jan 2026View
Block a2 west elevation, pbsa main entranceCase Copy Drawings · PDF7 Jan 2026View
Block a1 and a2 link west elevation, pbsa second entranceCase Copy Drawings · PDF7 Jan 2026View
Block a1 east elevationCase Copy Drawings · PDF7 Jan 2026View
MasterplanCase Copy Drawings · PDF7 Jan 2026View
Existing site elevationsCase Copy Drawings · PDF7 Jan 2026View
Existing site planCase Copy Drawings · PDF7 Jan 2026View
Location planCase Copy Drawings · PDF7 Jan 2026View
Drawing scheduleCase Copy Drawings · PDF7 Jan 2026View
Case Copy DrawingsCase Copy Drawings · PDF7 Jan 2026View
Materials strategy lrCase Copy Drawings · PDF7 Jan 2026View
Case Copy DrawingsCase Copy Drawings · PDF7 Jan 2026View
Container unit - floor plansCase Copy Drawings · PDF7 Jan 2026View
Block a2 wing - typical floor planCase Copy Drawings · PDF7 Jan 2026View
Block a1 wing - typical floor planCase Copy Drawings · PDF7 Jan 2026View
Block a2 - typical floor planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - level 19 planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - upper floor planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - level 7 planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - lower floor planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - lower floor planCase Copy Drawings · PDF7 Jan 2026View
Container unit - floor planCase Copy Drawings · PDF7 Jan 2026View
Block a2 wing - typical floor planCase Copy Drawings · PDF7 Jan 2026View
Block a1 wing - typical floor planCase Copy Drawings · PDF7 Jan 2026View
Block a2 - typical floor planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - level 19 planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - upper floor planCase Copy Drawings · PDF7 Jan 2026View
Block a1 - level 7 planCase Copy Drawings · PDF7 Jan 2026View
Block b - flat type 09Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 08Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 07Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 06Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 05Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 04Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 03aCase Copy Drawings · PDF7 Jan 2026View
Block b - flat type 03Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 02 (wheelchair accessible flat)Case Copy Drawings · PDF7 Jan 2026View
Block b - flat type 01aCase Copy Drawings · PDF7 Jan 2026View
Block b - flat type 01Case Copy Drawings · PDF7 Jan 2026View
Case Copy DrawingsCase Copy Drawings · PDF7 Jan 2026View
Sun wharf post submission amendments cover letterRevised Document · PDF7 Jan 2026View
Sun wharf post submission amendments cover letter.Case Copy Documents · PDF7 Jan 2026View
Sunwharf-addendumdasCase Copy Documents · PDF7 Jan 2026View
Sun wharf es review and clarification noteCase Copy Documents · PDF7 Jan 2026View
Chapter 13 water environment final ardentCase Copy Documents7 Jan 2026View
Second sun wharf es clarification noteCase Copy Documents · PDF7 Jan 2026View
Post submission amendments cover letterCase Copy Documents · PDF6 Jan 2026View
Daylight and sunlight report (consented vs. proposed)Case Copy Documents · PDF1 Dec 2025View
Results of the solar glare assessmentCase Copy Documents · PDF1 Dec 2025View
Results of the transient overshadowing assessmentCase Copy Documents · PDF1 Dec 2025View
(overshadowing) assessment within neighbouring amenity spacesCase Copy Documents · PDF1 Dec 2025View
With balconies removed)Case Copy Documents · PDF1 Dec 2025View
Detailed results of the daylight and sunlight assessment within neighbouring proCase Copy Documents · PDF1 Dec 2025View
Drawings of the existing, proposed and surrounding buildingsCase Copy Documents · PDF1 Dec 2025View
S volume i chapter 12 wind microclimate [nov 2025]Case Copy Documents · PDF28 Nov 2025View
Es volume i chapter 12 wind microclimate [nov 2025]Case Copy Documents · PDF24 Nov 2025View
Sun wharf - be seen spreadsheet 251103Case Copy Documents21 Nov 2025View
Sun wharf pre-redevelopment auditCase Copy Documents · PDF21 Nov 2025View
Sun wharf pre-demo auditCase Copy Documents · PDF21 Nov 2025View
Sun wharf owmpCase Copy Documents · PDF21 Nov 2025View
Sun wharf ce statementCase Copy Documents · PDF21 Nov 2025View
Overheating_closed window scenarioCase Copy Documents · PDF21 Nov 2025View
Lpg_-_wlca_assessment_sun_wharfCase Copy Documents21 Nov 2025View
Good homes alliance (gha) early stage overheating risk toolCase Copy Documents · PDF21 Nov 2025View
Gla_circular_economy_statements_template _sun_wharfCase Copy Documents21 Nov 2025View
Gla wlca report sun wharfCase Copy Documents · PDF21 Nov 2025View
Circular economy workshop minutesCase Copy Documents · PDF21 Nov 2025View
Sun wharf energy strategy+bruklsCase Copy Documents · PDF21 Nov 2025View
Sun wharf part l gla spreadsheet_comments updateCase Copy Documents21 Nov 2025View
Sun wharf - gla consultation (stage 1) - energy memo 2025Case Copy Documents21 Nov 2025View
Sun wharf_gla wlc memo_11.09.25Case Copy Documents21 Nov 2025View
Sun wharf_gla ce memo_stage 1_11.09.25Case Copy Documents21 Nov 2025View
Energy updatesCase Copy Documents21 Nov 2025View
Ea section proposedCase Copy Drawings · PDF31 Oct 2025View
Ea ga plan proposedCase Copy Drawings · PDF31 Oct 2025View
Ea crane access for maintenance and working room on waterside edgeCase Copy Drawings · PDF31 Oct 2025View
Appendix 6.1Case Copy Documents · PDF9 Oct 2025View
Appendix 6.2aCase Copy Documents · PDF9 Oct 2025View
Appendix 6.2bCase Copy Documents · PDF9 Oct 2025View
Appendix 6.3Case Copy Documents · PDF9 Oct 2025View
Appendix 6.4Case Copy Documents · PDF9 Oct 2025View
Appendix 6.5Case Copy Documents · PDF9 Oct 2025View
Appendix 6.6Case Copy Documents · PDF9 Oct 2025View
CommentCase Copy Documents · PDF5 Sept 2025View
CommentCase Copy Documents · PDF3 Sept 2025View
Design and access statement full versionCase Copy Documents · PDF28 Aug 2025View
Es volume ii townscape and visual impact appraisal - separate visionCase Copy Documents · PDF28 Aug 2025View
CommentCase Copy Documents · PDF27 Aug 2025View
CommentCase Copy Documents · PDF22 Aug 2025View
CommentCase Copy Documents · PDF22 Aug 2025View
Drp 2 panel responseCase Copy Documents · PDF21 Aug 2025View
Drp 1 panel responseCase Copy Documents · PDF21 Aug 2025View
CommentCase Copy Documents19 Aug 2025View
Traffic and transportCase Copy Documents · PDF14 Aug 2025View
Planning statement (updated)Case Copy Documents · PDF14 Aug 2025View
Environmental statementCase Copy Documents · PDF13 Aug 2025View
Environmental statementCase Copy Documents · PDF13 Aug 2025View
Drawings of existing proposed and surrounding buildinCase Copy Documents · PDF13 Aug 2025View
Detailed results of the daylight and sunlight assessCase Copy Documents · PDF13 Aug 2025View
Detailed results of the daylight and sunlight assessCase Copy Documents · PDF13 Aug 2025View
Daylight and sunlight reportCase Copy Documents · PDF13 Aug 2025View
Scoping bird surveyCase Copy Documents · PDF13 Aug 2025View
Biodiversity net gain assessment (bng)Case Copy Documents · PDF13 Aug 2025View
Wind microclimate reportCase Copy Documents · PDF13 Aug 2025View
Non technical summary (nts)Case Copy Documents · PDF13 Aug 2025View
Detailed_results_of_the_daylight_and_sunlight_assess 2Case Copy Documents · PDF11 Aug 2025View
Ground floor masterplanCase Copy Drawings · PDF4 Aug 2025View
Roof planSuperseded Document · PDF4 Aug 2025View
Landscape strategyCase Copy Documents · PDF4 Aug 2025View
Landscape strategyCase Copy Documents · PDF4 Aug 2025View
Overheating reportCase Copy Documents · PDF4 Aug 2025View
Archaeological desk based assessmentCase Copy Documents · PDF4 Aug 2025View
Ground floorSuperseded Document · PDF4 Aug 2025View
First floorSuperseded Document · PDF4 Aug 2025View
Second floorSuperseded Document · PDF4 Aug 2025View
Third floorSuperseded Document · PDF4 Aug 2025View
Fourth floorSuperseded Document · PDF4 Aug 2025View
Fifth floorSuperseded Document · PDF4 Aug 2025View
Sixth floorSuperseded Document · PDF4 Aug 2025View
Seventh floorSuperseded Document · PDF4 Aug 2025View
Eighth floorSuperseded Document · PDF4 Aug 2025View
Ninth floorSuperseded Document · PDF4 Aug 2025View
Tenth floorSuperseded Document · PDF4 Aug 2025View
Eleventh floorSuperseded Document · PDF4 Aug 2025View
Twelfth floorSuperseded Document · PDF4 Aug 2025View
Thirteenth floorSuperseded Document · PDF4 Aug 2025View
Fourteenth floorSuperseded Document · PDF4 Aug 2025View
Fifteenth floorSuperseded Document · PDF4 Aug 2025View
Sixteenth floorSuperseded Document · PDF4 Aug 2025View
Seventeenth floorSuperseded Document · PDF4 Aug 2025View
Eighteenth floorSuperseded Document · PDF4 Aug 2025View
Nineteenth floorSuperseded Document · PDF4 Aug 2025View
Roof planSuperseded Document · PDF4 Aug 2025View
Basement level 1Case Copy Drawings · PDF4 Aug 2025View
Basement level 2Superseded Document · PDF4 Aug 2025View
Ground floor plan block bSuperseded Document · PDF4 Aug 2025View
1st floor plan block bSuperseded Document · PDF4 Aug 2025View
2nd floor plan block bSuperseded Document · PDF4 Aug 2025View
3rd floor plan block bSuperseded Document · PDF4 Aug 2025View
4th floor plan block bSuperseded Document · PDF4 Aug 2025View
5th floor plan block bSuperseded Document · PDF4 Aug 2025View
6th floor plan block bSuperseded Document · PDF4 Aug 2025View
Roof plan block bSuperseded Document · PDF4 Aug 2025View
East elevationSuperseded Document · PDF4 Aug 2025View
East elevation with river wallSuperseded Document · PDF4 Aug 2025View
West elevationSuperseded Document · PDF4 Aug 2025View
South elevationSuperseded Document · PDF4 Aug 2025View
North elevationSuperseded Document · PDF4 Aug 2025View
South elevation residentialSuperseded Document · PDF4 Aug 2025View
North elevation pbsaSuperseded Document · PDF4 Aug 2025View
Container elevationsSuperseded Document · PDF4 Aug 2025View
East elevation renderedSuperseded Document · PDF4 Aug 2025View
West elevation renderedSuperseded Document · PDF4 Aug 2025View
Block a south & north elevations renderedSuperseded Document · PDF4 Aug 2025View
Block b south & north elevations renderedSuperseded Document · PDF4 Aug 2025View
Block a1 east elevationSuperseded Document · PDF4 Aug 2025View
Block a1 and a2 link west elevation, pbsa second entranceSuperseded Document · PDF4 Aug 2025View
Block a2 west elevation, pbsa main entranceSuperseded Document · PDF4 Aug 2025View
Block a1 wing south elevationSuperseded Document · PDF4 Aug 2025View
Block b south elevation, residential entranceSuperseded Document · PDF4 Aug 2025View
Section 1 - block a1 with courtyard north elevationSuperseded Document · PDF4 Aug 2025View
Section 2 - block a2 with courtyard south elevationSuperseded Document · PDF4 Aug 2025View
Section 3 - block bSuperseded Document · PDF4 Aug 2025View
Section 4 - block b with courtyard north elevationSuperseded Document · PDF4 Aug 2025View
Section 5 -wing blocks with courtyard west elevationSuperseded Document · PDF4 Aug 2025View
Section 6 - block a1, a2 and bSuperseded Document · PDF4 Aug 2025View
Container sectionsSuperseded Document · PDF4 Aug 2025View
Block a1 - lower floor planSuperseded Document · PDF4 Aug 2025View
Block a1 - level 7 planSuperseded Document · PDF4 Aug 2025View
Block a1 - upper floor planSuperseded Document · PDF4 Aug 2025View
Block a1 - level 19 planSuperseded Document · PDF4 Aug 2025View
Block a2 - typical floor planSuperseded Document · PDF4 Aug 2025View
Block a1 wing - typical floor planCase Copy Drawings · PDF4 Aug 2025View
Block b - flat type 05Case Copy Drawings · PDF4 Aug 2025View
Block b - flat type 06Case Copy Drawings · PDF4 Aug 2025View
Block b - flat type 07Case Copy Drawings · PDF4 Aug 2025View
Block b - flat type 08Case Copy Drawings · PDF4 Aug 2025View
Block b - flat type 09Case Copy Drawings · PDF4 Aug 2025View
Location planCase Copy Drawings · PDF4 Aug 2025View
Existing site planCase Copy Drawings · PDF4 Aug 2025View
Existing site elevationsCase Copy Drawings · PDF4 Aug 2025View
MasterplanCase Copy Drawings · PDF4 Aug 2025View
Pre-assessment reportCase Copy Documents · PDF4 Aug 2025View
Part l gla spreadsheet finaCase Copy Documents4 Aug 2025View
Site waste management planCase Copy Documents · PDF4 Aug 2025View
Operational waste management planCase Copy Documents · PDF4 Aug 2025View
Circular economy statementCase Copy Documents · PDF4 Aug 2025View
Energy strategy reportCase Copy Documents · PDF4 Aug 2025View
Student management planCase Copy Documents · PDF4 Aug 2025View
Utilities & services statementCase Copy Documents · PDF4 Aug 2025View
Application formApplication Form · PDF4 Aug 2025View
Community auditCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
Townscape and visual impact assessmentCase Copy Documents · PDF4 Aug 2025View
Figure 9-4 - zone of theoretical visibiltyCase Copy Drawings · PDF4 Aug 2025View
Location planSite Location Plan · PDF4 Aug 2025View
Appendix 1-2 location of specified information in the esCase Copy Documents · PDF4 Aug 2025View
Eia scoping reportCase Copy Documents · PDF4 Aug 2025View
Eia scoping opinionCase Copy Documents · PDF4 Aug 2025View
Competency statementCase Copy Documents · PDF4 Aug 2025View
Appendix 1-6 scoping response tableCase Copy Documents · PDF4 Aug 2025View
Cumulative schemesCase Copy Documents · PDF4 Aug 2025View
Details for drawingsCase Copy Documents · PDF4 Aug 2025View
Air quality assessmentCase Copy Documents · PDF4 Aug 2025View
Heritage asset planCase Copy Documents · PDF4 Aug 2025View
Heritage statementCase Copy Documents · PDF4 Aug 2025View
Heritage statementCase Copy Documents · PDF4 Aug 2025View
Existing conditions & proposed development plan viewCase Copy Drawings · PDF4 Aug 2025View
Daylight and sunlight analysis resultsCase Copy Documents · PDF4 Aug 2025View
Daylight and sunlight analysis resultsCase Copy Documents · PDF4 Aug 2025View
Sunlight amenity study existing vs proposed 21st marchCase Copy Documents · PDF4 Aug 2025View
Overshadowing 21st march equinox hourly shadowsCase Copy Documents · PDF4 Aug 2025View
Reflected solar glareCase Copy Documents · PDF4 Aug 2025View
Preliminary ecological appraisalCase Copy Documents · PDF4 Aug 2025View
Noise and vibration assessmentCase Copy Documents · PDF4 Aug 2025View
Consultation part 1 of 2Case Copy Documents · PDF4 Aug 2025View
Consultation part 2 of 2Case Copy Documents · PDF4 Aug 2025View
Geo-environmental assessmentCase Copy Documents · PDF4 Aug 2025View
Geo-environmental assessment- mapsCase Copy Drawings · PDF4 Aug 2025View
Geo-environmental assessment - mapsCase Copy Drawings · PDF4 Aug 2025View
Geo-environmental assessment - mapsCase Copy Drawings · PDF4 Aug 2025View
Geo-environmental assessment - mapsCase Copy Drawings · PDF4 Aug 2025View
Windowless sample logCase Copy Documents · PDF4 Aug 2025View
Determination of particle size distributionCase Copy Documents · PDF4 Aug 2025View
Geo-environmental assessmentCase Copy Documents · PDF4 Aug 2025View
Geo-environmental assessment - mapsCase Copy Documents · PDF4 Aug 2025View
Geo-environmental assessment - phase 1-1 part 3 of 3Case Copy Documents · PDF4 Aug 2025View
Appendix 1 ? figuresCase Copy Documents · PDF4 Aug 2025View
5 hydrogeology - superficial aquiferCase Copy Documents · PDF4 Aug 2025View
16 boreholesCase Copy Documents · PDF4 Aug 2025View
1897, 1897, 1897 london, 3-plan compositeCase Copy Documents · PDF4 Aug 2025View
Flood mapsCase Copy Drawings · PDF4 Aug 2025View
Flood mapsCase Copy Drawings · PDF4 Aug 2025View
Policy reviewCase Copy Documents · PDF4 Aug 2025View
Health impact assessmentCase Copy Documents · PDF4 Aug 2025View
Healthy streets transport assessmentCase Copy Documents · PDF4 Aug 2025View
Healthy streets transport assessment part 2Case Copy Documents · PDF4 Aug 2025View
Appendix b ? routes taken and photos for atz assessmentCase Copy Documents · PDF4 Aug 2025View
Rank order for land use 03 residentialCase Copy Documents · PDF4 Aug 2025View
Framework travel planCase Copy Documents · PDF4 Aug 2025View
Delivery and servicing management plan part 1Case Copy Documents · PDF4 Aug 2025View
Ground floor masterplanSuperseded Document · PDF4 Aug 2025View
Car parking management planCase Copy Documents · PDF4 Aug 2025View
Outline construction logistics plan part 1Case Copy Documents · PDF4 Aug 2025View
Outline construction logistics plan part 2Case Copy Documents · PDF4 Aug 2025View
Outline construction logistics plan part 3Case Copy Documents · PDF4 Aug 2025View
Outline construction logistics plan part 4Case Copy Documents · PDF4 Aug 2025View
Transport scoping noteCase Copy Documents · PDF4 Aug 2025View
Flood risk assessment & drainage strategyCase Copy Documents · PDF4 Aug 2025View
Summary of proposed mitigation measuresCase Copy Documents · PDF4 Aug 2025View
Whole life cycle carbon assessmentCase Copy Documents · PDF4 Aug 2025View
Gla - circular economy statement templateCase Copy Documents4 Aug 2025View
Wlca assessmentCase Copy Documents4 Aug 2025View
Fire statement formCase Copy Documents · PDF4 Aug 2025View
River impact studyCase Copy Documents · PDF4 Aug 2025View
River impact study - appendix b 1 of 3Case Copy Documents · PDF4 Aug 2025View
River impact study - appendix b 2 of 3Case Copy Documents · PDF4 Aug 2025View
River impact study - appendix b 3 of 3Case Copy Documents · PDF4 Aug 2025View
Statement of community involvementCase Copy Documents · PDF4 Aug 2025View
Cover letterCase Copy Documents · PDF4 Aug 2025View
Environmental statementCase Copy Documents · PDF4 Aug 2025View
London plan fire statementCase Copy Documents · PDF4 Aug 2025View
Pbsa demand & market assessmentCase Copy Documents · PDF4 Aug 2025View
Commercial soaCase Copy Documents · PDF4 Aug 2025View
Pbsa soaCase Copy Documents · PDF4 Aug 2025View
Resi soaCase Copy Documents · PDF4 Aug 2025View
Design & access statement 1Case Copy Documents · PDF4 Aug 2025View
Design & access statement 2Case Copy Documents · PDF4 Aug 2025View
Design & access statement 3Case Copy Documents · PDF4 Aug 2025View
Design & access statement 4Case Copy Documents · PDF4 Aug 2025View
Design & access statement 5Case Copy Documents · PDF4 Aug 2025View
Design & access statement 6Case Copy Documents · PDF4 Aug 2025View
Design & access statement 7Case Copy Documents · PDF4 Aug 2025View
Design & access statement 8Case Copy Documents · PDF4 Aug 2025View
Design & access statement 9Case Copy Documents · PDF4 Aug 2025View
Design & access statement 10Case Copy Documents · PDF4 Aug 2025View
Design & access statement 11Case Copy Documents · PDF4 Aug 2025View
Designing out crimeCase Copy Documents · PDF4 Aug 2025View
Statutory metric macro enabledCase Copy Documents4 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.