Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
100 WALLER ROAD, LONDON, SE14 5LU
Last published check: 8 Oct 2026, 11:05. Check the council record for more recent changes.
100 WALLER ROAD, LONDON, SE14 5LU
This record has no verified map location.
View council mapConstruction of a dormer to the rear roof slope with photovoltaic panels at 100 Waller Road, SE14 together with the construction of a single storey rear extension with air source heat pump, pergola, demolition and reconstruction of the existing garage, replacement of windows to all elevations and all other associated works.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Delegated reportOfficer Report · PDF | 9 May 2025 | View |
| Decision noticeDecision · PDF | 9 May 2025 | View |
| Proposed section aaCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Proposed second floor planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Design and access statementCase Copy Documents · PDF | 31 Mar 2025 | View |
| Proposed first floor planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Proposed block planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Proposed ground floor planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing north elevationCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing east elevationCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing south elevationCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing section aaCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing second floor planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing roof planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing first floor planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Typical window detailsCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Existing site location planSite Location Plan · PDF | 31 Mar 2025 | View |
| Existing ground floor planCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Proposed north elevationCase Copy Drawings · PDF | 31 Mar 2025 | View |
| East elevationCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Proposed south elevationCase Copy Drawings · PDF | 31 Mar 2025 | View |
| Application formApplication Form · PDF | 31 Mar 2025 | View |
| Proposed roof planCase Copy Drawings · PDF | 31 Mar 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.