Council planning record

Construction of two storey building to provide two self-contained units (use class C3), together with the provision of cycle parking, refuse storage, hard and soft landscaping and all associated works to the rear of the site at 54 Venner Road, SE26.

54 VENNER ROAD, LONDON, SE26 5EL

DecidedReference: DC/25/139406London Borough of Lewisham

Last published check: 7 Oct 2026, 23:37. Check the council record for more recent changes.

Application location

54 VENNER ROAD, LONDON, SE26 5EL

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
12 Mar 2025
Validated
22 Apr 2025
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

Construction of two storey building to provide two self-contained units (use class C3), together with the provision of cycle parking, refuse storage, hard and soft landscaping and all associated works to the rear of the site at 54 Venner Road, SE26.

Proposal details

Reference
DC/25/139406
Alternative references
PP-13846163
Ward
Sydenham
Agent
Oak and Prosper

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 34 of 34

DocumentPublishedAction
Delegated reportOfficer Report · PDF20 Jun 2025View
Decision noticeDecision · PDF20 Jun 2025View
Proposed site planCase Copy Drawings · PDF18 Jun 2025View
Proposed landscape planCase Copy Drawings · PDF18 Jun 2025View
Bng proposed site planCase Copy Drawings18 Jun 2025View
Bng spreadsheetCase Copy Documents18 Jun 2025View
Consultee commentSuperseded Document · PDF7 May 2025View
Additional bng informationSuperseded Document22 Apr 2025View
Statutory biodiversity metric condition assessments post devSuperseded Document22 Apr 2025View
Bng baselineSuperseded Document22 Apr 2025View
Bng baselineSuperseded Document22 Apr 2025View
Air quality statementCase Copy Documents · PDF7 Apr 2025View
Plantbox brochureCase Copy Documents · PDF13 Mar 2025View
Green-roof-system-maintenance-procedureCase Copy Documents · PDF13 Mar 2025View
Specification sheetCase Copy Documents · PDF13 Mar 2025View
Transport statement-Case Copy Documents · PDF13 Mar 2025View
Construction management planCase Copy Documents · PDF13 Mar 2025View
Site management planCase Copy Documents · PDF13 Mar 2025View
Preliminary ecological appraisal-Case Copy Documents · PDF13 Mar 2025View
Proposed landscape planSuperseded Document · PDF13 Mar 2025View
D a statementCase Copy Documents · PDF13 Mar 2025View
Proposed site planSuperseded Document · PDF13 Mar 2025View
Proposed floor plansCase Copy Drawings · PDF13 Mar 2025View
Proposed roof sectionCase Copy Drawings · PDF13 Mar 2025View
Proposed elevationsCase Copy Drawings · PDF13 Mar 2025View
Proposed elevations (new dwelling)Case Copy Drawings · PDF13 Mar 2025View
Existing site planCase Copy Drawings · PDF13 Mar 2025View
Existing floor plansCase Copy Drawings · PDF13 Mar 2025View
Existing roof sectionCase Copy Drawings · PDF13 Mar 2025View
Existing elevationsCase Copy Drawings · PDF13 Mar 2025View
Proposed block planCase Copy Drawings · PDF13 Mar 2025View
Application formApplication Form · PDF13 Mar 2025View
Location plan existingCase Copy Drawings · PDF13 Mar 2025View
Existing block planCase Copy Drawings · PDF13 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted
Decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.