Council planning record

Planning application for the demolition of existing buildings and construction of buildings ranging from 1 to 30 storeys for residential (Class C3) and flexible Class E, local community (Class F2), education (Class F1), and drinking establishment (Sui Generis) uses across the wider site; cycle parking and facilities, landscaping and highway improvements, servicing and plant and all other ancillary and associated works at Former Lewisham College, 1 Deptford Bridge SE8. (This application is an EIA development and is accompanied by an Environmental Statement). (This is a cross-borough application with the Royal Borough of Greenwich, their reference: 25/0798/F.)

FORMER LEWISHAM COLLEGE, 1 DEPTFORD BRIDGE, LONDON, SE8 4HH

RegisteredReference: DC/25/139390London Borough of Lewisham

Last published check: 8 Oct 2026, 11:00. Check the council record for more recent changes.

Application location

FORMER LEWISHAM COLLEGE, 1 DEPTFORD BRIDGE, LONDON, SE8 4HH

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Planning Permission
Received
13 Mar 2025
Validated
31 Mar 2025
Determination deadline
Not published
Local authority
London Borough of Lewisham

Application overview

Planning application for the demolition of existing buildings and construction of buildings ranging from 1 to 30 storeys for residential (Class C3) and flexible Class E, local community (Class F2), education (Class F1), and drinking establishment (Sui Generis) uses across the wider site; cycle parking and facilities, landscaping and highway improvements, servicing and plant and all other ancillary and associated works at Former Lewisham College, 1 Deptford Bridge SE8. (This application is an EIA development and is accompanied by an Environmental Statement). (This is a cross-borough application with the Royal Borough of Greenwich, their reference: 25/0798/F.)

Proposal details

Reference
DC/25/139390
Alternative references
PP-13833533
Ward
Deptford
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 298 of 298

DocumentPublishedAction
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents · PDF1 Sept 2026View
Consultee responseCase Copy Documents1 Sept 2026View
Consultee responseCase Copy Documents1 Sept 2026View
Consultee responseCase Copy Documents1 Sept 2026View
Consultee responseCase Copy Documents1 Sept 2026View
Lbl ecology (1)Case Copy Documents1 May 2026View
Overheating strategy guide - residentsCase Copy Documents30 Mar 2026View
0210324-hle-rp-05a-outline maintenance strategyCase Copy Documents · PDF30 Mar 2026View
Flood risk assesment revised march 2026Case Copy Documents · PDF20 Mar 2026View
Consultee commentCase Copy Documents · PDF29 Jan 2026View
Consultee commentCase Copy Documents · PDF22 Jan 2026View
Consultee commentCase Copy Documents · PDF19 Jan 2026View
Consultee commentCase Copy Documents15 Jan 2026View
CommentCase Copy Documents13 Jan 2026View
Design and access statementRevised Document · PDF7 Jan 2026View
Building h west elevation and south boundary elevationRevised Document · PDF7 Jan 2026View
Building efg - elevationsRevised Document · PDF7 Jan 2026View
Building eg east elevationRevised Document · PDF7 Jan 2026View
Building efg west elevationRevised Document · PDF7 Jan 2026View
Building efg east elevationRevised Document · PDF7 Jan 2026View
Building efg north elevationRevised Document · PDF7 Jan 2026View
Building efg south elevationRevised Document · PDF7 Jan 2026View
Building d north east and south east elevationsRevised Document · PDF7 Jan 2026View
Building c east and west elevationsRevised Document · PDF7 Jan 2026View
Buildings c and d north elevationRevised Document · PDF7 Jan 2026View
Buildings c and d south elevationRevised Document · PDF7 Jan 2026View
Site west bld a south east and south west elevationsRevised Document · PDF7 Jan 2026View
Site west bld a north west and north east elevationRevised Document · PDF7 Jan 2026View
Site west bld a and b north elevation bld b south elevationRevised Document · PDF7 Jan 2026View
Site west blds a and b east elevationRevised Document · PDF7 Jan 2026View
Site west blds a and b west elevationRevised Document · PDF7 Jan 2026View
Site wide elevations south east & westRevised Document · PDF7 Jan 2026View
Site wide elevations north & southRevised Document · PDF7 Jan 2026View
Site wide level roof ga planRevised Document · PDF7 Jan 2026View
Site wide level 00 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level roof ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 30 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 29 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 28 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 27 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 26 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 25 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 24 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 23 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 22 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 21 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 20 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 19 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 18 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 17 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 16 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 15 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 14 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 13 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 12 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 11 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 10 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 09 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 08 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 07 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 06 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 05 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 04 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 03 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 02 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 01 ga planRevised Document · PDF7 Jan 2026View
Site west blds a and b - level 00 ga planRevised Document · PDF7 Jan 2026View
Building cd level roof ga planRevised Document · PDF7 Jan 2026View
Building cd level 18 ga planRevised Document · PDF7 Jan 2026View
Building cd level 17 ga planRevised Document · PDF7 Jan 2026View
Building cd level 16 ga planRevised Document · PDF7 Jan 2026View
Building cd level 15 ga planRevised Document · PDF7 Jan 2026View
Building cd level 14 ga planRevised Document · PDF7 Jan 2026View
Building cd level 13 ga planRevised Document · PDF7 Jan 2026View
Building cd level 12 ga planRevised Document · PDF7 Jan 2026View
Building cd level 11 ga planRevised Document · PDF7 Jan 2026View
Building cd level 10 ga planRevised Document · PDF7 Jan 2026View
Building cd level 09 ga planRevised Document · PDF7 Jan 2026View
Building cd level 08 ga planRevised Document · PDF7 Jan 2026View
Building cd level 07 ga planRevised Document · PDF7 Jan 2026View
Building cd level 06 ga planRevised Document · PDF7 Jan 2026View
Building cd level 05 ga planRevised Document · PDF7 Jan 2026View
Building cd level 04 ga planRevised Document · PDF7 Jan 2026View
Building cd level 03 ga planplanRevised Document · PDF7 Jan 2026View
Building cd level 02 ga planRevised Document · PDF7 Jan 2026View
Building cd level 01 ga planRevised Document · PDF7 Jan 2026View
Building cd level 00 ga planRevised Document · PDF7 Jan 2026View
Building efg roof level ga planRevised Document · PDF7 Jan 2026View
Building efg level 19 ga roof planRevised Document · PDF7 Jan 2026View
Building efg level 18 ga planRevised Document · PDF7 Jan 2026View
Building efg level 17 ga planRevised Document · PDF7 Jan 2026View
Building efg level 16 ga planRevised Document · PDF7 Jan 2026View
Building efg level 16 ga planRevised Document · PDF7 Jan 2026View
Building efg level 15 ga planRevised Document · PDF7 Jan 2026View
Building efg level 14 ga planRevised Document · PDF7 Jan 2026View
Building efg level 13 ga planRevised Document · PDF7 Jan 2026View
Building efg level 12 ga planRevised Document · PDF7 Jan 2026View
Building efg level 11 ga planRevised Document · PDF7 Jan 2026View
Building efg level 10 ga planRevised Document · PDF7 Jan 2026View
Building efg level 09 ga planRevised Document · PDF7 Jan 2026View
Building efg level 08 ga planRevised Document · PDF7 Jan 2026View
Building efg level 07 ga planRevised Document · PDF7 Jan 2026View
Building efg level 06 ga planRevised Document · PDF7 Jan 2026View
Building efg level 05 ga planRevised Document · PDF7 Jan 2026View
Building efg level 04 ga planRevised Document · PDF7 Jan 2026View
Building efg level 03 ga planRevised Document · PDF7 Jan 2026View
Building efg level 02 ga planRevised Document · PDF7 Jan 2026View
Building efg level 01 ga planRevised Document · PDF7 Jan 2026View
Building efg level 00 ga planRevised Document · PDF7 Jan 2026View
Issue sheet - planning resubmission setRevised Document · PDF7 Jan 2026View
Site wide sections aa & bbRevised Document · PDF7 Jan 2026View
Site west - blds a and b bld a sectionsRevised Document · PDF7 Jan 2026View
Site west - blds a and b bld b sectionsRevised Document · PDF7 Jan 2026View
Building c - sections 1 and 2Revised Document · PDF7 Jan 2026View
Building d - sections 1 and 2Revised Document · PDF7 Jan 2026View
Building e - sections 1 and 2Revised Document · PDF7 Jan 2026View
Buildings f and h - sections 1 and 2Revised Document · PDF7 Jan 2026View
Building g - sections 1 and 2Revised Document · PDF7 Jan 2026View
Existing site wide elevations south east and westRevised Document · PDF7 Jan 2026View
Existing site wide elevations north and southRevised Document · PDF7 Jan 2026View
Existing site wide sections aa and bbRevised Document · PDF7 Jan 2026View
Proposed block planRevised Document · PDF7 Jan 2026View
Site location planRevised Document · PDF7 Jan 2026View
Demolition planRevised Document · PDF7 Jan 2026View
Existing site planRevised Document · PDF7 Jan 2026View
Lba boundary plan existing siteRevised Document · PDF7 Jan 2026View
Daylight sunlight reportRevised Document · PDF7 Jan 2026View
Economic statement addendum december 2025Revised Document · PDF7 Jan 2026View
Fire statementRevised Document · PDF7 Jan 2026View
Fire statementRevised Document · PDF7 Jan 2026View
Heritage statementRevised Document · PDF7 Jan 2026View
Landscape part 1Revised Document · PDF7 Jan 2026View
Landscape part 2Revised Document · PDF7 Jan 2026View
Planning statementRevised Document · PDF7 Jan 2026View
Covering letterRevised Document · PDF7 Jan 2026View
Tree surveyRevised Document · PDF7 Jan 2026View
Internal sunlight & daylightRevised Document · PDF7 Jan 2026View
Health impact assessmentRevised Document · PDF7 Jan 2026View
BngRevised Document · PDF7 Jan 2026View
Environmental statementaddendumRevised Document · PDF7 Jan 2026View
Environmental statementaddendumRevised Document · PDF7 Jan 2026View
Environmental statementaddendumRevised Document · PDF7 Jan 2026View
Environmental statementRevised Document · PDF7 Jan 2026View
Bng excelRevised Document7 Jan 2026View
Energy appendix gRevised Document · PDF7 Jan 2026View
Energy appendix iRevised Document · PDF7 Jan 2026View
Energy appendix iRevised Document · PDF7 Jan 2026View
Energy appendix iRevised Document · PDF7 Jan 2026View
Energy appendix jRevised Document · PDF7 Jan 2026View
Energy appendix kRevised Document · PDF7 Jan 2026View
Energy appendix kRevised Document7 Jan 2026View
Energy appendix kRevised Document · PDF7 Jan 2026View
Energy appendix kRevised Document · PDF7 Jan 2026View
Energy appendix kRevised Document7 Jan 2026View
Energy appendix kRevised Document · PDF7 Jan 2026View
Energy appendix lRevised Document · PDF7 Jan 2026View
Energy appendix lRevised Document · PDF7 Jan 2026View
Energy appendix lRevised Document · PDF7 Jan 2026View
Energy appendix mRevised Document · PDF7 Jan 2026View
Energy appendix mRevised Document · PDF7 Jan 2026View
Energy appendix nRevised Document · PDF7 Jan 2026View
Energy strategyRevised Document · PDF7 Jan 2026View
EnergyRevised Document7 Jan 2026View
EnergyRevised Document7 Jan 2026View
EnergyRevised Document7 Jan 2026View
Retail impact assessmentRevised Document · PDF7 Jan 2026View
Construction environmental management planRevised Document · PDF7 Jan 2026View
Waste management strategy part 2Revised Document · PDF7 Jan 2026View
Waste management strategy part 1Revised Document · PDF7 Jan 2026View
Delivery servicing plan part 1Revised Document · PDF7 Jan 2026View
Delivery servicing plan part 2Revised Document · PDF7 Jan 2026View
Delivery servicing plan part 3Revised Document · PDF7 Jan 2026View
Transport assessment part 1Revised Document · PDF7 Jan 2026View
Transport assessment part 2Revised Document · PDF7 Jan 2026View
Transport assessment part 3Revised Document · PDF7 Jan 2026View
Transport assessment part 4Revised Document · PDF7 Jan 2026View
Transport assessment part 5Revised Document · PDF7 Jan 2026View
Transport assessment part 6Revised Document · PDF7 Jan 2026View
Transport assessment part 7Revised Document · PDF7 Jan 2026View
Transport assessment part 8Revised Document · PDF7 Jan 2026View
Travel planRevised Document · PDF7 Jan 2026View
Utilities statementRevised Document · PDF7 Jan 2026View
Ventilation statementRevised Document · PDF7 Jan 2026View
Flood risk assessmentRevised Document · PDF7 Jan 2026View
Phase 1 desk study reportRevised Document · PDF7 Jan 2026View
Whole life carbonRevised Document · PDF7 Jan 2026View
Non technical summaryRevised Document · PDF7 Jan 2026View
Figures listRevised Document · PDF7 Jan 2026View
Appendix aRevised Document · PDF7 Jan 2026View
Consultee objectionCase Copy Documents · PDF20 May 2025View
Consultee commentCase Copy Documents9 May 2025View
CommentCase Copy Documents · PDF6 May 2025View
CommentCase Copy Documents · PDF6 May 2025View
Further commentCase Copy Documents · PDF6 May 2025View
Further commentCase Copy Documents · PDF6 May 2025View
CommentCase Copy Documents29 Apr 2025View
CommentCase Copy Documents24 Apr 2025View
Consultee commentCase Copy Documents24 Apr 2025View
Consultee commentCase Copy Documents · PDF22 Apr 2025View
Consultee commentCase Copy Documents · PDF22 Apr 2025View
Bng 1Superseded Document · PDF3 Apr 2025View
Bng 2Superseded Document · PDF3 Apr 2025View
Bng 3Superseded Document · PDF3 Apr 2025View
Bng 4Superseded Document · PDF3 Apr 2025View
Bng 5Superseded Document · PDF3 Apr 2025View
Bng 6Superseded Document3 Apr 2025View
Viability reportCase Copy Documents · PDF3 Apr 2025View
Designing out crimeCase Copy Documents3 Apr 2025View
Designing out crimeCase Copy Documents · PDF3 Apr 2025View
Tall building statementCase Copy Documents · PDF3 Apr 2025View
River impact studyCase Copy Documents · PDF3 Apr 2025View
Bpc viability report deptford college february 2025 final v2.Case Copy Documents · PDF20 Mar 2025View
Environmental statement: non-technical summarySuperseded Document · PDF17 Mar 2025View
Environmental statement volume 1: main textSuperseded Document · PDF17 Mar 2025View
Environmental statement part 2Superseded Document · PDF17 Mar 2025View
Environmental statement part 3Superseded Document · PDF17 Mar 2025View
Environmental statement part 4Superseded Document · PDF17 Mar 2025View
Environmental statement part 5Superseded Document · PDF17 Mar 2025View
Environmental statement part 6Superseded Document · PDF17 Mar 2025View
Environmental statement part 7Superseded Document · PDF17 Mar 2025View
Environmental statement part 8Superseded Document · PDF17 Mar 2025View
Environmental statement volume 2: townscape and visual impact assessmentSuperseded Document · PDF17 Mar 2025View
Environmental statement volume 2: townscape and visual impact assessmentSuperseded Document · PDF17 Mar 2025View
Environmental statement volume 2: townscape and visual impact assessmentSuperseded Document · PDF17 Mar 2025View
Environmental statement volume 2: townscape and visual impact assessmentSuperseded Document · PDF17 Mar 2025View
Environmental statement volume 2: townscape and visual impact assessmentSuperseded Document · PDF17 Mar 2025View
Environmental statement volume 2: townscape and visual impact assessmentSuperseded Document · PDF17 Mar 2025View
Design and access statementSuperseded Document · PDF13 Mar 2025View
Design and access statementSuperseded Document · PDF13 Mar 2025View
Design and access statementSuperseded Document · PDF13 Mar 2025View
Design and access statementSuperseded Document · PDF13 Mar 2025View
Application formApplication Form · PDF13 Mar 2025View
Energy & sustainability strategySuperseded Document · PDF13 Mar 2025View
Environmental statementSuperseded Document · PDF13 Mar 2025View
St- appendix gSuperseded Document · PDF13 Mar 2025View
St- appendix gSuperseded Document · PDF13 Mar 2025View
St- appendix gSuperseded Document · PDF13 Mar 2025View
St- appendix gSuperseded Document · PDF13 Mar 2025View
St- appendix gSuperseded Document · PDF13 Mar 2025View
St- appendix gSuperseded Document · PDF13 Mar 2025View
Flood risk assessmentSuperseded Document · PDF13 Mar 2025View
Flood risk assessmentSuperseded Document · PDF13 Mar 2025View
Public realm and landscape d&aSuperseded Document · PDF13 Mar 2025View
Phase 1 desk study reportSuperseded Document · PDF13 Mar 2025View
Heritage statementSuperseded Document · PDF13 Mar 2025View
Internal daylight, sunlight & overshadowing assessmentSuperseded Document · PDF13 Mar 2025View
Transport assessmentSuperseded Document · PDF13 Mar 2025View
Daylight and sunlight reportSuperseded Document · PDF13 Mar 2025View
Retail impact assessmentSuperseded Document · PDF13 Mar 2025View
Cover letterSuperseded Document · PDF13 Mar 2025View
Biodiversity net gain design stage assessmentSuperseded Document · PDF13 Mar 2025View
Arboricultural impact assessmentCase Copy Documents · PDF13 Mar 2025View
Statement of community involvement.Case Copy Documents · PDF13 Mar 2025View
Circular economySuperseded Document · PDF13 Mar 2025View
Whole life carbonSuperseded Document · PDF13 Mar 2025View
Whole life carbon glaSuperseded Document13 Mar 2025View
Master planSuperseded Document · PDF13 Mar 2025View
London plan fire statementSuperseded Document · PDF13 Mar 2025View
Fire statment formSuperseded Document · PDF13 Mar 2025View
Ventilation statementSuperseded Document · PDF13 Mar 2025View
Utilities statementSuperseded Document · PDF13 Mar 2025View
Operational waste management strategySuperseded Document · PDF13 Mar 2025View
Travel planSuperseded Document · PDF13 Mar 2025View
Deptford bridge health impact assessment with front coverSuperseded Document · PDF13 Mar 2025View
Economic statement with front coverSuperseded Document · PDF13 Mar 2025View
Illustrative masterplan ground floorSuperseded Document · PDF13 Mar 2025View
Illustrative masterplan combined 2Superseded Document · PDF13 Mar 2025View
Circular economySuperseded Document · PDF13 Mar 2025View
Landscape ground floor planSuperseded Document · PDF13 Mar 2025View
Site wide - general arrangements plan combinedSuperseded Document · PDF13 Mar 2025View
Ground floor site wideSuperseded Document · PDF13 Mar 2025View
Planning statement w appendicesSuperseded Document · PDF13 Mar 2025View
Outline construction environmental management planSuperseded Document · PDF13 Mar 2025View
Delivery & servicing planSuperseded Document · PDF13 Mar 2025View
General arrangement plan ground floorSuperseded Document · PDF13 Mar 2025View
PlansSuperseded Document · PDF13 Mar 2025View
Existing plansCase Copy Drawings · PDF13 Mar 2025View
PlansSuperseded Document · PDF13 Mar 2025View
PlansSuperseded Document · PDF13 Mar 2025View
PlansSuperseded Document · PDF13 Mar 2025View
PlansSuperseded Document · PDF13 Mar 2025View
Plans, elevations & sectionsSuperseded Document · PDF13 Mar 2025View
Plans- building efgSuperseded Document · PDF13 Mar 2025View
PlansSuperseded Document · PDF13 Mar 2025View
Site wide level 00 ga planSuperseded Document · PDF13 Mar 2025View
Circular economy glaSuperseded Document13 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Actual Committee Date

    Published milestoneCouncil source
  6. Latest Neighbour Consultation Date

    Published milestoneCouncil source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.