Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
10 TREMAINE CLOSE, LONDON, SE4 1YF
Last published check: 8 Oct 2026, 20:55. Check the council record for more recent changes.
10 TREMAINE CLOSE, LONDON, SE4 1YF
This record has no verified map location.
View council mapConstruction of a porch extension, covered entrance and the conversion of the existing garage with alterations to the front elevation and new roof light, together with the installation of replacement windows in the elevations and an air source heat pump at 10 Tremaine Close SE4.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Delegated reportOfficer Report · PDF | 9 May 2025 | View |
| Decision noticeDecision · PDF | 9 May 2025 | View |
| Decision noticeDecision · PDF | 9 May 2025 | View |
| Proposed roof planCase Copy Drawings · PDF | 14 Mar 2025 | View |
| Air heat pump technical detailsCase Copy Documents · PDF | 14 Mar 2025 | View |
| Air heat pump vaillant b2c arotherm plus leafletCase Copy Documents · PDF | 14 Mar 2025 | View |
| Design & access statementCase Copy Documents · PDF | 6 Mar 2025 | View |
| Proposed rear elevationCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Proposed side elevationCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Proposed section bbCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Proposed front elevationCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing rear elevationCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Proposed ground floor planCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Proposed first floor planCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Proposed section aaCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing side elevationCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing loft floor planCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing roof planCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing section aaCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing section bbCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing front elevationCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Application formApplication Form · PDF | 6 Mar 2025 | View |
| Existing site planCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Site location planSite Location Plan · PDF | 6 Mar 2025 | View |
| Existing ground floor planCase Copy Drawings · PDF | 6 Mar 2025 | View |
| Existing first floor planCase Copy Drawings · PDF | 6 Mar 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.