Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Lewisham Shopping Centre and associated buildings, including properties and land on Molesworth Street, Lewisham High Street and Rennell Street, LONDON, SE13 7EP
Last published check: 8 Oct 2026, 21:31. Check the council record for more recent changes.
Lewisham Shopping Centre and associated buildings, including properties and land on Molesworth Street, Lewisham High Street and Rennell Street, LONDON, SE13 7EP
This record has no verified map location.
View council mapHybrid planning application for the comprehensive, phased redevelopment of land at Lewisham Shopping Centre and associated buildings, including properties and land on Molesworth Street, Lewisham High Street and Rennell Street, comprising: Full planning application (within Phase 1a) comprising the demolition of existing buildings, structures and associated works to provide a mixed-use development including the construction of a Co-Living building (Sui Generis) up to 23 storeys in height (Plot N1), and a residential building (Class C3) up to 15 storeys in height (Plot N2), associated residential ancillary spaces as well as town centre uses (Class E (a, b, c, d, e, f, g (i, ii)); and Sui Generis) together with public open space, public realm, amenity space and landscaping, car and cycle parking, highway works and the formation of new pedestrian and vehicle accesses, existing shopping centre interface works (including the 'Phase 1a Finish Works'), service deck modifications, servicing arrangements, site preparation works, supporting infrastructure works and other associated works. Outline planning application (all matters reserved) for a comprehensive, phased redevelopment, comprising demolition of existing buildings, structures and associated works to provide a mixed-use development including the following uses: Living Uses, comprising residential (Class C3) and student accommodation (Sui Generis); Town Centre Uses (Class E (a, b, c, d, e, f, g (i, ii)) and Sui Generis); Community and Cultural uses (Class F1; F2; and Sui Generis); Music, performance and event venue (Sui Generis); Public open space, public realm, amenity space and landscaping works; Car and cycle parking; Highway works; Formation of new pedestrian and vehicular accesses, permanent and temporary vehicular access ramps, service deck, servicing arrangements and means of access and circulation within the site; Site preparation works; Supporting infrastructure works; Associated interim works; Meanwhile and interim uses; and Other associated works.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Signed s106 legal agreementSection 106 Agreements · PDF | 8 Jul 2026 | View |
| Decision noticeCase Copy Documents · PDF | 8 Jul 2026 | View |
| Note relating to draft section 106 agreement following publicationCase Copy Documents · PDF | 1 May 2026 | View |
| Draft decison noticeCase Copy Documents · PDF | 24 Apr 2026 | View |
| Draft section 106 agreement - appendicesSection 106 Agreements · PDF | 17 Apr 2026 | View |
| Draft section 106 agreementSection 106 Agreements · PDF | 17 Apr 2026 | View |
| Draft section 106 agreementSection 106 Agreements | 1 Apr 2026 | View |
| Gla stage 2 reportCase Copy Documents · PDF | 10 Mar 2026 | View |
| Gla stage 2 decision letterCase Copy Documents · PDF | 10 Mar 2026 | View |
| Supplementary report to published committee reportCase Copy Documents · PDF | 16 Oct 2025 | View |
| Committee reportCase Copy Documents · PDF | 16 Oct 2025 | View |
| Primark additional representationCase Copy Documents · PDF | 14 Oct 2025 | View |
| Landsec letter re new objectionsCase Copy Documents · PDF | 14 Oct 2025 | View |
| Landsec letter re committee reportCase Copy Documents · PDF | 14 Oct 2025 | View |
| Consultee commentCase Copy Documents · PDF | 13 Oct 2025 | View |
| Feasibility cost estimate / landsec / lewisham music venueApplication Form · PDF | 10 Oct 2025 | View |
| Response to comments regarding primarkCase Copy Documents · PDF | 7 Oct 2025 | View |
| Response to comments regarding sainsburysCase Copy Documents · PDF | 7 Oct 2025 | View |
| Conservation comments (final)Case Copy Documents | 6 Oct 2025 | View |
| Ldrp review 1Case Copy Documents · PDF | 6 Oct 2025 | View |
| Ldrp review 2Case Copy Documents · PDF | 6 Oct 2025 | View |
| Ldrp review 3Case Copy Documents · PDF | 6 Oct 2025 | View |
| Ldrp review 4Case Copy Documents · PDF | 6 Oct 2025 | View |
| Ldrp review 5Case Copy Documents · PDF | 6 Oct 2025 | View |
| Ldrp review design codesCase Copy Documents · PDF | 6 Oct 2025 | View |
| Ldrp review n2 2nd reviewCase Copy Documents · PDF | 6 Oct 2025 | View |
| Arboricultural impact assessment rev o2aCase Copy Documents · PDF | 6 Oct 2025 | View |
| Tree protection plan revision 01bCase Copy Documents · PDF | 6 Oct 2025 | View |
| Arboricultural impact assessment revision 02aCase Copy Documents · PDF | 6 Oct 2025 | View |
| Thames water confirmation of capacityCase Copy Documents · PDF | 6 Oct 2025 | View |
| Final unit summaryCase Copy Documents · PDF | 6 Oct 2025 | View |
| Response to lh no 1. further objectionCase Copy Documents · PDF | 6 Oct 2025 | View |
| Consultee commentsCase Copy Documents | 2 Oct 2025 | View |
| Lsc engagement noteCase Copy Documents · PDF | 1 Oct 2025 | View |
| Consultee commentCase Copy Documents · PDF | 30 Sept 2025 | View |
| Consultee commentCase Copy Documents · PDF | 26 Sept 2025 | View |
| Further objectionCase Copy Documents · PDF | 26 Sept 2025 | View |
| Consultee commentCase Copy Documents · PDF | 19 Sept 2025 | View |
| CommentCase Copy Documents · PDF | 12 Sept 2025 | View |
| Consultee commentCase Copy Documents | 9 Sept 2025 | View |
| Consultee commentCase Copy Documents · PDF | 5 Sept 2025 | View |
| Response to gla fva reviewCase Copy Documents · PDF | 2 Sept 2025 | View |
| Gla circular economy statementCase Copy Documents | 2 Sept 2025 | View |
| Parameter plan 12Revised Document · PDF | 29 Aug 2025 | View |
| Es supplementary noteCase Copy Documents · PDF | 29 Aug 2025 | View |
| Drawing scheduleRevised Document · PDF | 29 Aug 2025 | View |
| Re-consultation cover letterCase Copy Documents · PDF | 29 Aug 2025 | View |
| Tree protection plan revision 01bCase Copy Documents · PDF | 28 Aug 2025 | View |
| Arboricultural impact assessment rev 02aCase Copy Documents · PDF | 28 Aug 2025 | View |
| Arboricultural impact assessment rev 01bCase Copy Documents · PDF | 28 Aug 2025 | View |
| CommentCase Copy Documents · PDF | 18 Aug 2025 | View |
| Bnpp viability noteCase Copy Documents · PDF | 10 Aug 2025 | View |
| Consultee commentsCase Copy Documents · PDF | 7 Aug 2025 | View |
| Further objectionCase Copy Documents · PDF | 29 Jul 2025 | View |
| Consultee commentsCase Copy Documents | 28 Jul 2025 | View |
| Gla viability - assessment of financial viabilityCase Copy Documents · PDF | 25 Jul 2025 | View |
| Urban design (final)Case Copy Documents | 23 Jul 2025 | View |
| Response to lh no 1. objectionCase Copy Documents · PDF | 15 Jul 2025 | View |
| Letter on market and equalityCase Copy Documents · PDF | 2 Jul 2025 | View |
| Consultee commentsCase Copy Documents | 2 Jul 2025 | View |
| Viability overviewCase Copy Documents · PDF | 30 Jun 2025 | View |
| Viability position following independent assessor reviewCase Copy Documents · PDF | 30 Jun 2025 | View |
| Fva viability overviewCase Copy Documents · PDF | 30 Jun 2025 | View |
| Parameter plan 15 - land use plan - level 01Revised Document · PDF | 30 Jun 2025 | View |
| Parameter plan 16 - land use plan - level 02Revised Document · PDF | 30 Jun 2025 | View |
| Parameter plan 17 - land use plan - level 03 and aboveRevised Document · PDF | 30 Jun 2025 | View |
| Fva independent assessor reportCase Copy Documents · PDF | 27 Jun 2025 | View |
| Response to nhs requestCase Copy Documents · PDF | 26 Jun 2025 | View |
| Bnpp final reportCase Copy Documents · PDF | 25 Jun 2025 | View |
| Consultee commentsCase Copy Documents | 24 Jun 2025 | View |
| Built heritage statementCase Copy Documents · PDF | 23 May 2025 | View |
| Consultee commentsCase Copy Documents | 19 May 2025 | View |
| Proposed highways works overview temporary condition sheet 2 of 2Case Copy Drawings · PDF | 4 Apr 2025 | View |
| Proposed highways works overview sheet 1 of 2Case Copy Drawings · PDF | 4 Apr 2025 | View |
| Proposed highways works overview sheet 2 of 2Case Copy Drawings · PDF | 4 Apr 2025 | View |
| Proposed molesworth street toucan crossing temporary conditionCase Copy Drawings · PDF | 4 Apr 2025 | View |
| Proposed highways works overview temporary condition sheet 1 of 2Case Copy Drawings · PDF | 4 Apr 2025 | View |
| Proposed molesworth street toucan crossing temporary conditionCase Copy Drawings · PDF | 4 Apr 2025 | View |
| Proposed ground floor greater detail 1 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed ground floor greater detail 2 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed ground floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed ground floor mezzanine greater detail 1 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed ground floor mezzanine greater detail 2 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed ground floor mezzanineCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed first floor greater detail 1 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed first floor greater detail 2 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed first floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed first floor mezzanine greater detail 1 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed first floor mezzanine greater detail 2 of 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed first floor mezzanineCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed second floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed third floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed fourth floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed fifth floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed sixth floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed seventh floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed eighth floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed ninth floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed tenth floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed eleventh floor planCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed elevation eastCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed elevation northCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed elevation westCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed elevation southCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed short section aCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed long section bCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed short section cCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Proposed bay study ground floor plinthCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Drawing scheduleCase Copy Documents · PDF | 2 Apr 2025 | View |
| Design code rev 01Case Copy Documents · PDF | 2 Apr 2025 | View |
| Design code rev 01 part 1Case Copy Documents · PDF | 2 Apr 2025 | View |
| Design code part 2Case Copy Documents · PDF | 2 Apr 2025 | View |
| Design code part 3Case Copy Documents · PDF | 2 Apr 2025 | View |
| Design code part 4Case Copy Documents · PDF | 2 Apr 2025 | View |
| Design code part 5Case Copy Documents · PDF | 2 Apr 2025 | View |
| Design code part 6Case Copy Documents · PDF | 2 Apr 2025 | View |
| Design code part 7Case Copy Documents · PDF | 2 Apr 2025 | View |
| Development specificationCase Copy Documents · PDF | 2 Apr 2025 | View |
| Development specification trackedCase Copy Documents · PDF | 2 Apr 2025 | View |
| Planning statement cleanCase Copy Documents · PDF | 2 Apr 2025 | View |
| Planning statement trackedCase Copy Documents · PDF | 2 Apr 2025 | View |
| Design & access statement vol 1 masterplan addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Access statementCase Copy Documents · PDF | 2 Apr 2025 | View |
| D & a appendice n1 & n2 fire statementCase Copy Documents · PDF | 2 Apr 2025 | View |
| Environmental statement addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.1 chapter 6 noise and vibrationCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.2 chapter 7 air qualityCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.3 chapter 8 transportCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.4 chapter 9 flood risk and drainageCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.5 chapter 10 ground conditions & contaminationCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.6 chapter 11 archaeologyCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.7 chapter 12 daylight. sunlight and overshadowingCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.8 chapter 13 windCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.9 chapter 14 ecologyCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.10 chapter 15 socio-economicsCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.11 chapter 16 climate changeCase Copy Documents · PDF | 2 Apr 2025 | View |
| Section 5.12 volume 2 thviaCase Copy Documents · PDF | 2 Apr 2025 | View |
| Appendix 5-4-1Case Copy Documents · PDF | 2 Apr 2025 | View |
| Appendix 5-4-2Case Copy Documents · PDF | 2 Apr 2025 | View |
| Appendix 5-6-1Case Copy Documents · PDF | 2 Apr 2025 | View |
| Appendix 5-12-1Case Copy Documents · PDF | 2 Apr 2025 | View |
| Es non-technical summary addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Transport assessment addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Sustainability statement & breeamCase Copy Documents · PDF | 2 Apr 2025 | View |
| Gla circular economy statements n1Case Copy Documents | 2 Apr 2025 | View |
| Gla circular economy statements n2Case Copy Documents | 2 Apr 2025 | View |
| Gla circular economy statement outlineCase Copy Documents | 2 Apr 2025 | View |
| Circular economy statementCase Copy Documents · PDF | 2 Apr 2025 | View |
| Pre demolition audit addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Whole life carbon assessment n1Case Copy Documents | 2 Apr 2025 | View |
| Whole life carbon assessment n2Case Copy Documents | 2 Apr 2025 | View |
| Whole life carbon assessment outlineCase Copy Documents | 2 Apr 2025 | View |
| Whole life carbon assessmentCase Copy Documents · PDF | 2 Apr 2025 | View |
| Internal daylight & overshadowing report addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Operational waste management strategy addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Flood risk assessment addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Sustainable drainage strategy addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Plowman craven aia 01aCase Copy Drawings · PDF | 2 Apr 2025 | View |
| Plowman craven aia 01a 2Case Copy Drawings · PDF | 2 Apr 2025 | View |
| Plowman craven tpp 01aCase Copy Documents · PDF | 2 Apr 2025 | View |
| Plowman craven tpp 01a 2Case Copy Documents · PDF | 2 Apr 2025 | View |
| Arboricultural assessmentCase Copy Documents · PDF | 2 Apr 2025 | View |
| Health impact assessment statement of conformityCase Copy Documents · PDF | 2 Apr 2025 | View |
| Equality impact assessment statement of conformityCase Copy Documents · PDF | 2 Apr 2025 | View |
| Built heritage statement addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| River impact assessment addendumCase Copy Documents · PDF | 2 Apr 2025 | View |
| Amendments covering letterCase Copy Documents · PDF | 2 Apr 2025 | View |
| Design codeCase Copy Documents · PDF | 2 Apr 2025 | View |
| Design code part 1Case Copy Documents · PDF | 2 Apr 2025 | View |
| Parameter plan 06 - maximum horizontal extents of development plots plan - levelCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 12 - access and circulation plan - level 00Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 14 - land use plan - level 00Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 18 - public realm and open space plan - level 00Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 07 - maximum horiztonal extents of development plots plan - levelCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 15 - land use plan - level 01Superseded Document · PDF | 1 Apr 2025 | View |
| Parameter plan 19 - public realm and open space plan - level 01Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 08 - maximum horiztonal extents of development plots plan - levelCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 16 - land use plan - level 02Superseded Document · PDF | 1 Apr 2025 | View |
| Parameter plan 20 - public realm and open space plan - level 02Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 09 - maximum extents of development plots plan - level 03 and aboCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 17 - land use plan - level 03 and aboveSuperseded Document · PDF | 1 Apr 2025 | View |
| Parameter plan 10 - maximum vertical extents of development plots planCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 11 - maximum vertical extents of building maintenance units planCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plan 13 - access and circulation plan - level 01Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Parameter plans binderSuperseded Document · PDF | 1 Apr 2025 | View |
| Ground floor planCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Proposed detailed plan - residential entrance & gf receptionCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Level 01 planCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Level 02 planCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Level 03 planCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Level 04-07 plansCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Level 08 amenity floor plansCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Proposed detailed plan - amenity space at level 08 2 2Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Section aaCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Section ddCase Copy Drawings · PDF | 1 Apr 2025 | View |
| Unit types - m4-3 homes - m1 - n1Case Copy Drawings · PDF | 1 Apr 2025 | View |
| Frr responseCase Copy Documents · PDF | 28 Mar 2025 | View |
| Frr response appendix 1Case Copy Documents · PDF | 28 Mar 2025 | View |
| Frr response appendix 2Case Copy Documents · PDF | 28 Mar 2025 | View |
| Frr response appendix 3Case Copy Documents · PDF | 28 Mar 2025 | View |
| Frr response appendix 4Case Copy Documents · PDF | 28 Mar 2025 | View |
| Frr response appendix 5Case Copy Documents · PDF | 28 Mar 2025 | View |
| Frr response appendix 6Case Copy Documents · PDF | 28 Mar 2025 | View |
| Frr response appendix 7Case Copy Documents · PDF | 28 Mar 2025 | View |
| Temple es final review reportCase Copy Documents · PDF | 20 Mar 2025 | View |
| ObjectionCase Copy Documents · PDF | 18 Mar 2025 | View |
| Consultee commentsCase Copy Documents | 17 Mar 2025 | View |
| Stage i planning reportCase Copy Documents · PDF | 13 Mar 2025 | View |
| Irr responseCase Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 2Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 3Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 4Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 5Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 6Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 7Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 8Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 9Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 10Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 11Case Copy Documents · PDF | 3 Mar 2025 | View |
| Irr response appendix 12Case Copy Documents · PDF | 3 Mar 2025 | View |
| Consultee commentsCase Copy Documents | 3 Feb 2025 | View |
| Environmental protection commentsCase Copy Documents | 29 Jan 2025 | View |
| Consultee commentCase Copy Documents | 29 Jan 2025 | View |
| Lewisham shopping centre esr irrCase Copy Documents · PDF | 29 Jan 2025 | View |
| Energy strategy and overheatingCase Copy Documents · PDF | 21 Jan 2025 | View |
| Consultee commentCase Copy Documents · PDF | 16 Jan 2025 | View |
| Es irrCase Copy Documents · PDF | 16 Jan 2025 | View |
| Consultee commentCase Copy Documents | 9 Jan 2025 | View |
| Consultee commentCase Copy Documents | 8 Jan 2025 | View |
| ObjectionCase Copy Documents · PDF | 7 Jan 2025 | View |
| Consultee commentCase Copy Documents · PDF | 7 Jan 2025 | View |
| Further commentsCase Copy Documents · PDF | 3 Jan 2025 | View |
| Consultee commentCase Copy Documents · PDF | 20 Dec 2024 | View |
| Consultee commentCase Copy Documents · PDF | 12 Dec 2024 | View |
| Consultee commentCase Copy Documents · PDF | 10 Dec 2024 | View |
| ObjectionCase Copy Documents · PDF | 9 Dec 2024 | View |
| Consultee commentCase Copy Documents · PDF | 9 Dec 2024 | View |
| Financial viability assessmentRevised Document · PDF | 9 Dec 2024 | View |
| Financial viability assessmentRevised Document · PDF | 6 Dec 2024 | View |
| Consultee commentCase Copy Documents · PDF | 4 Dec 2024 | View |
| Consultee commentCase Copy Documents · PDF | 3 Dec 2024 | View |
| Consultee commentCase Copy Documents | 29 Nov 2024 | View |
| Consultee commentRevised Document · PDF | 27 Nov 2024 | View |
| Consultee commentCase Copy Documents · PDF | 26 Nov 2024 | View |
| ObjectionCase Copy Documents · PDF | 26 Nov 2024 | View |
| Consultee commentCase Copy Documents | 26 Nov 2024 | View |
| Consultee commentCase Copy Documents | 25 Nov 2024 | View |
| Consultee commentCase Copy Documents · PDF | 25 Nov 2024 | View |
| Consultee commentCase Copy Documents | 25 Nov 2024 | View |
| Consultee commentsCase Copy Documents | 25 Nov 2024 | View |
| Further objectionCase Copy Documents · PDF | 19 Nov 2024 | View |
| Consultee commentsCase Copy Documents | 19 Nov 2024 | View |
| Consultee commentCase Copy Documents · PDF | 18 Nov 2024 | View |
| Consultee commentCase Copy Documents | 7 Nov 2024 | View |
| Consultee commentCase Copy Documents · PDF | 6 Nov 2024 | View |
| Whole life carbon assessmentRevised Document · PDF | 6 Nov 2024 | View |
| Sustainability statement and breeam pre-assessmentRevised Document · PDF | 6 Nov 2024 | View |
| N2 green roof sectionsCase Copy Drawings · PDF | 22 Oct 2024 | View |
| N2 level 00Case Copy Drawings · PDF | 22 Oct 2024 | View |
| N2 roof planCase Copy Drawings · PDF | 22 Oct 2024 | View |
| Appendix 1.1 statement of competenceCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 2.1 scoping report for environmental impact assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 7.1 - 7.9 environmental statement volume iii air quality appendicesCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 6.1 noise and vibration - technical appendixCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 5.1 outline construction environmental management planCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 2.2 eia formal scoping report reviewCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix e lewisham sustainability monitoring formCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix d - landsec nature strategy 2024Case Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix c - landsec sustainable development toolkitCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix a lsc breeam and hqm pre-assessments october 2024Case Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix a lewisham shopping centre pre-redevelopment and pre-demolition audit vCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 14.4 part 4Case Copy Documents | 22 Oct 2024 | View |
| Appendix 14.4 part 3 biodiversity gain planCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 14.4 part 2 biodiversity gain planCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 14.4 part 1 biodiversity gain planCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 14.3 peregrine falcon survey reportCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 14.2 bat surveys reportCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 14.1 preliminary ecological appraisalCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 13.2.1 cfd pedestrian level wind assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 13.1 pedestrian level wind microclimate preliminary results summaryCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 12.1 drawingsCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 11.1 archaeological desk-based assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 10.3 generic quantitative risk assessment - phase 2Case Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 10.2 generic quantitative risk assessment - phase 1Case Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 10.1 preliminary risk assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Lpg wlca assessment 25 march 2022 outlineCase Copy Documents | 22 Oct 2024 | View |
| Lpg wlca assessment 25 march 2022 n2Case Copy Documents | 22 Oct 2024 | View |
| Lpg wlca assessment 25 march 2022 n1Case Copy Documents | 22 Oct 2024 | View |
| Glossary of terms and abbreviationsCase Copy Documents · PDF | 22 Oct 2024 | View |
| Gla circular economy statements may 23 outlineCase Copy Documents | 22 Oct 2024 | View |
| Gla circular economy statements may 23 n2Case Copy Documents | 22 Oct 2024 | View |
| Gla circular economy statements may 23 n1Case Copy Documents | 22 Oct 2024 | View |
| Environmental statement chapters 1-19Case Copy Documents · PDF | 22 Oct 2024 | View |
| Arboricultural impact assesment part 1Case Copy Documents · PDF | 22 Oct 2024 | View |
| Arboricultural impact assesment part 2Case Copy Documents · PDF | 22 Oct 2024 | View |
| Arboricultural impact assesment part 3Case Copy Documents · PDF | 22 Oct 2024 | View |
| Highways plansSuperseded Document · PDF | 22 Oct 2024 | View |
| Existing / demolition plansCase Copy Drawings · PDF | 22 Oct 2024 | View |
| Parameter plansSuperseded Document · PDF | 22 Oct 2024 | View |
| Masterplan drawings for informationCase Copy Drawings · PDF | 22 Oct 2024 | View |
| Phase 1a finish works plansCase Copy Drawings · PDF | 22 Oct 2024 | View |
| Access statement appendix 1 of 4Case Copy Documents · PDF | 22 Oct 2024 | View |
| Design & access statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Design & access statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Planning statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Development specificationCase Copy Documents · PDF | 22 Oct 2024 | View |
| Drawing scheduleSuperseded Document · PDF | 22 Oct 2024 | View |
| Plot n1Superseded Document · PDF | 22 Oct 2024 | View |
| Landscape drawingsCase Copy Drawings · PDF | 22 Oct 2024 | View |
| Lighting assessment appendix 2 of 4Case Copy Documents · PDF | 22 Oct 2024 | View |
| Fire statement appendix 3 of 4Case Copy Documents · PDF | 22 Oct 2024 | View |
| Ventilation approach appendix 4 of 4Case Copy Documents · PDF | 22 Oct 2024 | View |
| Environmental statement non-technical summaryCase Copy Documents · PDF | 22 Oct 2024 | View |
| Housing statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Table of contentsCase Copy Documents · PDF | 22 Oct 2024 | View |
| Tree protection plan part 1Case Copy Documents · PDF | 22 Oct 2024 | View |
| Tree protection plan part 2Case Copy Documents · PDF | 22 Oct 2024 | View |
| Town centre assessment studyCase Copy Documents · PDF | 22 Oct 2024 | View |
| Built heritage statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Equality impact assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Health impact assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Arboricultural assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Tree surveyCase Copy Documents · PDF | 22 Oct 2024 | View |
| Economic growth statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Operational waste management strategyCase Copy Documents · PDF | 22 Oct 2024 | View |
| Energy strategy & overheatingCase Copy Documents · PDF | 22 Oct 2024 | View |
| Whole life carbon assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Statement of community involvementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Framework travel planCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 3 car parking management planCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 1 clp-cemp-structural surveyCase Copy Documents · PDF | 22 Oct 2024 | View |
| Co-living management strategyCase Copy Documents · PDF | 22 Oct 2024 | View |
| Heritage, townscape, visual impact assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| River impact assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Foul sewerage & utilities assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Flood risk assessment n/a/appendix 9.1Case Copy Documents · PDF | 22 Oct 2024 | View |
| Sustainable drainage strategy appendix 1/appendix 9.2Case Copy Documents · PDF | 22 Oct 2024 | View |
| Internal daylight & overshadowing reportCase Copy Documents · PDF | 22 Oct 2024 | View |
| Circular economy statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Sustainability statement & breeamCase Copy Documents · PDF | 22 Oct 2024 | View |
| Statement of community involvement appendicesCase Copy Documents · PDF | 22 Oct 2024 | View |
| Transport assessmentCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 2 delivery & servicing planCase Copy Documents · PDF | 22 Oct 2024 | View |
| Plot n2Superseded Document · PDF | 22 Oct 2024 | View |
| Lsc planning application document listCase Copy Documents | 22 Oct 2024 | View |
| Application formApplication Form · PDF | 22 Oct 2024 | View |
| Htvia appendix 1 of 2Case Copy Documents · PDF | 22 Oct 2024 | View |
| Htvia appendix 2 of 2Case Copy Documents · PDF | 22 Oct 2024 | View |
| Design codeSuperseded Document · PDF | 22 Oct 2024 | View |
| Design & access statementCase Copy Documents · PDF | 22 Oct 2024 | View |
| Appendix 13.2.2 wind mitigation resultsCase Copy Documents · PDF | 22 Oct 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.