The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 application to discharge the permanent above ground structures (including associated artwork), landscaping works, surface water drainage and operational access under Schedule 3 requirements EARPS2, EARPS5, EARPS8, EARPS10, EARPS12 and PW11 at Earl Pumping Station.
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8 5FA
The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 application to discharge the permanent above ground structures (including associated artwork), landscaping works, surface water drainage and operational access under Schedule 3 requirements EARPS2, EARPS5, EARPS8, EARPS10, EARPS12 and PW11 at Earl Pumping Station.
Reference
DC/23/129820
Agent
Laura Mellon
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.