FRONT: TWO Lime (T1, T3)(ht.15m) RE-POLLARD by approx.2m to previous pollard points (removing regrowth). Reason: routine repeat maintenanceFRONT SIDE: THREE Sycamore (G1)(ht.12-14m) RE-POLLARD by approx.2m to previous pollard points (removing regrowth). Reason: routine repeat maintenanceFRONT: ONE Holm Oak (T2)(ht.15m) LATERAL REDUCE by 1-2m on W compass point towards house, remove epicormics on main stem to ht.6m. Reason: to rebalance crown.Informative A: the sensitive management to retain the trees for streetscape amenity, urban forest canopy/urban greening, wellbeing, wildlife, environmental benefits and to mitigate the climate and biodiversity emergencies is greatly appreciated. Informative B: where possible please use arisings to create habitat piles on site and/or lay between stakes as a 'dead hedge' for wildlife and biodiversity.
FRONT: TWO Lime (T1, T3)(ht.15m) RE-POLLARD by approx.2m to previous pollard points (removing regrowth). Reason: routine repeat maintenanceFRONT SIDE: THREE Sycamore (G1)(ht.12-14m) RE-POLLARD by approx.2m to previous pollard points (removing regrowth). Reason: routine repeat maintenanceFRONT: ONE Holm Oak (T2)(ht.15m) LATERAL REDUCE by 1-2m on W compass point towards house, remove epicormics on main stem to ht.6m. Reason: to rebalance crown.Informative A: the sensitive management to retain the trees for streetscape amenity, urban forest canopy/urban greening, wellbeing, wildlife, environmental benefits and to mitigate the climate and biodiversity emergencies is greatly appreciated. Informative B: where possible please use arisings to create habitat piles on site and/or lay between stakes as a 'dead hedge' for wildlife and biodiversity.
Reference
DC/22/128644
Alternative references
PP-11549263
Ward
Blackheath
Agent
Aztech Tree Services LTD
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.