Replacement of metal single glazed windows with metal double glazed units, a Bitumen felt roof with SBS elastometic membrane roof and a cast iron to match existing at The Hermitage, SE13
Replacement of metal single glazed windows with metal double glazed units, a Bitumen felt roof with SBS elastometic membrane roof and a cast iron to match existing at The Hermitage, SE13
Reference
DC/22/127903
Alternative references
PP-11268144
Ward
Blackheath
Agent
Arcus Consulting LLP
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.