Installation of air source heat pump heating and cooling system to serve the auditorium, involving the installation of nine outdoor condensers on the roof, eight units proposed at the rear of the auditorium, four units to be installed within the recessed side walkways, two wall-mounted indoor units to be installed either side of the rear bar, and six units to be installed along the high-level walkway at the rear of the circle which runs outside the plant room/former projection room.
Installation of air source heat pump heating and cooling system to serve the auditorium, involving the installation of nine outdoor condensers on the roof, eight units proposed at the rear of the auditorium, four units to be installed within the recessed side walkways, two wall-mounted indoor units to be installed either side of the rear bar, and six units to be installed along the high-level walkway at the rear of the circle which runs outside the plant room/former projection room.
Reference
26/03419/LB
Ward
Brixton North
Agent
metropolis planning
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.