Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Gasholder Station Kennington Oval London SE11 5SG
Last published check: 12 Oct 2026, 09:22. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourcePartial approval of details pursuant to condition 55 (plant), 57 (noise) & 58 (noise) Block E only of planning permission 23/01682/VOC (Variation of Conditions 2 (Approved Plans), 4 (CHP ), 17(Cycle Parking), 41(Energy System Emission)and 75 (Quantum of Development)) of planning permission 21/03217/VOC (Variation of conditions 2 (approved drawings), 17 (cycles), 74 (parking) and 75 (quantum of development) of Planning Permission ref: 20/00987/VOC as amended by ref: 21/01673/NMC, 21/03922/NMC, 21/03055/NMC 22/00420/NMC (Variation of Conditions 2 (Approved drawings), 26 (Method Statement), 27 (Footings), 28 (Iron Work), 29 (Colour Scheme), 30 (c) (Archaeological) and 31(c) (Building recording) of Planning Permission ref : 17/05772/EIAFUL as amended by S96A ref: 20/00646/NMC (Demolition of existing buildings and structures including temporary disassembly of listed gas holder no.1, demolition of locally-listed gas holders 4 and 5, redevelopment to provide a mixed-use development comprising re-erection of restored gas-holder no.1, erection of new buildings ranging from 4-18 storeys to provide residential (Class C3), office (Class B1) incorporating ancillary cafe and space for community use, waste management use and community space (Class D1)) granted on 23/08/2018.) Granted on 17/07/2020. The development originally consented under ref: 17/05772/EIAFUL is a departure from Policy ED1 of the Lambeth Local Plan (2015)-Additional storey and rear infill to Block C -Two additional storey(s) to shoulders of Block E -Provision of link infill extension to the south of Block E -Internal reconfiguration of Blocks C, D and E for fire safety purposes and changes to unit mix-Internal reconfiguration of Block E to provide a link to Block F -Addition of 18 additional units -Fa�adeDesignChangestocrownofBlock E-Relocation substation within Block C to a separate outbuilding, and extension to the bin and bicycle storage area -Landscaping Alterations granted on 31.01.2024.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsGasholder Station Kennington Oval London SE11 5SG
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| ACOUSTIC DESIGN REPORT BLOCK E AND F PART 1 REDACTEDSupporting Docs · PDF | 10 Jun 2026 | View |
| BLOCK E CORE E1 ROOF PLANT LAYOUTPlans · PDF | 27 May 2026 | View |
| SOUND INSULATION MARK UPS LEVEL 0Plans · PDF | 27 May 2026 | View |
| APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF | 27 May 2026 | View |
| SOUND INSULATION MARK UPS LEVEL 11Plans · PDF | 27 May 2026 | View |
| ACOUSTIC DESIGN REPORT BLOCK E AND F PART 2Supporting Docs · PDF | 27 May 2026 | View |
| BLOCK E CORE E3 ROOF PLANT LAYOUTPlans · PDF | 27 May 2026 | View |
| BLOCK E TYPICAL COMBINED SERVICES TYPICAL MEP UTILITY CUPBOARD PRIVATE APARTMENTPlans · PDF | 27 May 2026 | View |
| BLOCK E CORE E1 LEVEL 12 ROOF PLANT LAYOUTPlans · PDF | 27 May 2026 | View |
| BLOCK E COMBINED SERVICES LAYOUT APARTMENT TYPE - FT03Plans · PDF | 27 May 2026 | View |
| COVERING LETTERSupporting Docs · PDF | 27 May 2026 | View |
| BLOCK E CORE E2 PLANT ROOF LAYOUTPlans · PDF | 27 May 2026 | View |
| BLOCK F MECHANICAL SERVICES ROOF PLANT LAYOUTPlans · PDF | 27 May 2026 | View |
| SOUND INSULATION MARK UPS LEVEL 2Plans · PDF | 27 May 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.