Council planning record

Replacement of render system on a like-for-like basis, including addition of metal copings; replacement of timber cladding with a cement-based plank system; replacement of timber decking with a non-combustible product; upgrading of timber screens and fencing to a cement-based plank system. (Amended site address)

65 - 79 Clapham High Street London SW4 7TG

DecidedReference: 26/00703/FULLondon Borough of Lambeth

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Full Planning Permission
Received
6 Mar 2026
Validated
29 Jun 2026
Determination deadline
Not published
Local authority
London Borough of Lambeth

Application overview

Replacement of render system on a like-for-like basis, including addition of metal copings; replacement of timber cladding with a cement-based plank system; replacement of timber decking with a non-combustible product; upgrading of timber screens and fencing to a cement-based plank system. (Amended site address)

Proposal details

Reference
26/00703/FUL
Ward
Clapham East
Agent
Planning Potential Ltd.

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

65 - 79 Clapham High Street London SW4 7TG

This record has no verified map location.

View council map

Documents 44 of 44

DocumentPublishedAction
Decision NoticeDecision Notice · PDF9 Sept 2026View
UPDATED METHOD OF CONSTRUCTIONSupporting Docs · PDF8 Sept 2026View
OFFICERS REPORTDelegated Register · PDF8 Sept 2026View
PRIVACY SCREEN SYSTEM DETAILPlans - Revised · PDF5 Aug 2026View
EXAMPLE IMAGE - PRIVACY SCREENINGPhoto5 Aug 2026View
OWNERSHIP CERTIFICATE BApplication Form · PDF30 Jun 2026View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF30 Jun 2026View
COVERING LETTERSupporting Docs · PDF30 Jun 2026View
METHOD OF CONSTRUCTION STATEMENTSupporting Docs · PDF30 Jun 2026View
PROPOSED ROOF PLANPlans · PDF6 Mar 2026View
PROPOSED SOUTH ELEVATIONPlans · PDF6 Mar 2026View
EXISTING FIFTH FLOOR PLAN - PLANT ROOMPlans · PDF6 Mar 2026View
EXISTING NORTH ELEVATIONPlans · PDF6 Mar 2026View
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMSupporting Docs · PDF6 Mar 2026View
CLAPHAM METRO BANK - BUILDING WORKSSupporting Docs · PDF6 Mar 2026View
PROPOSED NORTH ELEVATIONPlans · PDF6 Mar 2026View
PROPOSED EAST ELEVATIONPlans · PDF6 Mar 2026View
EXISTING ROOF PLANPlans · PDF6 Mar 2026View
EXISTING SOUTH ELEVATIONPlans · PDF6 Mar 2026View
PRE-CONSTRUCTION FILESupporting Docs · PDF6 Mar 2026View
DESIGN RISK INVENTORYSupporting Docs · PDF6 Mar 2026View
WALL TYPESPlans · PDF6 Mar 2026View
EXISTING FOURTH FLOOR PLANPlans · PDF6 Mar 2026View
PROPOSED GROUND FLOOR PLANPlans · PDF6 Mar 2026View
EXISTING WEST ELEVATIONPlans · PDF6 Mar 2026View
PROPOSED FIRST FLOOR PLANPlans · PDF6 Mar 2026View
INCL. FIRE STRATEGY STATEMENT - PART 1Design & Access Statement · PDF6 Mar 2026View
BALUSTRADE SYSTEM DETAILPlans · PDF6 Mar 2026View
EXISTING SECOND FLOOR PLANPlans · PDF6 Mar 2026View
EXISTING EAST ELEVATIONPlans · PDF6 Mar 2026View
INCL. FIRE STRATEGY STATEMENT - PART 2Design & Access Statement · PDF6 Mar 2026View
LOUVRE PRIVACY SCREEN SYSTEMPlans - Superseded · PDF6 Mar 2026View
EXISTING GROUND FLOOR PLANPlans · PDF6 Mar 2026View
PROPOSED THIRD FLOOR PLANPlans · PDF6 Mar 2026View
PROPOSED FOURTH FLOOR PLANPlans · PDF6 Mar 2026View
THE LOCATION PLANOS Map · PDF6 Mar 2026View
BLOCK PLANPlans · PDF6 Mar 2026View
PROPOSED SECOND FLOOR PLANPlans · PDF6 Mar 2026View
PROPOSED FIFTH FLOOR PLANPlans · PDF6 Mar 2026View
PROPOSED WEST ELEVATIONPlans · PDF6 Mar 2026View
DECKING SYSTEM DETAILPlans · PDF6 Mar 2026View
FROSTED GLASS PRIVACY SCREEN SYSTEMPlans - Superseded · PDF6 Mar 2026View
EXISTING FIRST FLOOR PLANPlans · PDF6 Mar 2026View
EXISTING THIRD FLOOR PLANPlans · PDF6 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Grant Permission
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.