Council planning record

Variation of conditions 2 (Approved Plans and Drawings), 14 (Tree Protection Plan), 15 (Arboricultural Impact Assessment and Arboricultural Method Statement) and 49 (Unit Numbers) of planning permission 19/00744/FUL (The application seeks the redevelopment of 2 sites on the Ashmole Housing Estate as follows:Site 1:Demolition of the existing Tenant's Hall at 2 Meadow Road SW8 1QB and erection of a part 4, part 5 storey building to include a new tenants hall (Use Class D1) at ground floor level and 15 residential flats (Use Class C3) at upper floor levels together with provision of refuse/recycling and cycle storage and associated landscaping.Site 2:Erection of 6 dwelling houses and 9 flats (Use Class C3) and a temporary Tenants Hall (Use Class D1) at site of former garages opposite 47-57 Ebbisham Drive SW8 1UB together with provision of refuse/recycling and cycle storage and associated landscaping) granted on 21.01.2021Variations sought:Amendments sought to approved plans to accommodate improvements to the scheme and ensure condition compliance.Amendments to planning drawings and wording of conditions.

Ashmole Housing Estate London

Awaiting decisionReference: 26/00560/VOCLondon Borough of Lambeth

Application location

Ashmole Housing Estate London

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Variation of Condition
Received
23 Feb 2026
Validated
5 Mar 2026
Determination deadline
Not published
Local authority
London Borough of Lambeth

Application overview

Variation of conditions 2 (Approved Plans and Drawings), 14 (Tree Protection Plan), 15 (Arboricultural Impact Assessment and Arboricultural Method Statement) and 49 (Unit Numbers) of planning permission 19/00744/FUL (The application seeks the redevelopment of 2 sites on the Ashmole Housing Estate as follows:Site 1:Demolition of the existing Tenant's Hall at 2 Meadow Road SW8 1QB and erection of a part 4, part 5 storey building to include a new tenants hall (Use Class D1) at ground floor level and 15 residential flats (Use Class C3) at upper floor levels together with provision of refuse/recycling and cycle storage and associated landscaping.Site 2:Erection of 6 dwelling houses and 9 flats (Use Class C3) and a temporary Tenants Hall (Use Class D1) at site of former garages opposite 47-57 Ebbisham Drive SW8 1UB together with provision of refuse/recycling and cycle storage and associated landscaping) granted on 21.01.2021Variations sought:Amendments sought to approved plans to accommodate improvements to the scheme and ensure condition compliance.Amendments to planning drawings and wording of conditions.

Proposal details

Reference
26/00560/VOC
Agent
Sphere25

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 66 of 66

DocumentPublishedAction
TM52 OVERHEATING ASSESSMENT - REV 01Supporting Docs · PDF3 Sept 2026View
ADDENDUM TO ENERGY SUSTAINABILITY STATEMENTSupporting Docs · PDF3 Sept 2026View
GLA CARBON EMISSION REPORTING SPREADSHEETSupporting Docs3 Sept 2026View
TREE PROTECTION PLANSupporting Docs · PDF13 Aug 2026View
ARBORICULTURAL IMPACT ASSESSMENTSupporting Docs · PDF13 Aug 2026View
TREE PROTECTION PLAN - DEMOLITIONSupporting Docs · PDF13 Aug 2026View
ENERGY AND SUSTAINABILITY ADDENDUMDocuments - Revised · PDF30 Jun 2026View
REVISED PROPOSED GROUND FLOOR PLANPlans - Revised · PDF30 Jun 2026View
GLA EMISSION SPREADSHEETDocuments - Revised30 Jun 2026View
CIL FORMSupporting Docs · PDF12 Mar 2026View
PRELIMINARY ROOST ASSESSMENTSupporting Docs · PDF23 Feb 2026View
FLOOD RISK ASSESSMENTSupporting Docs · PDF23 Feb 2026View
PROPOSED SECTIONS CC AND DDPlans · PDF23 Feb 2026View
PROPOSED EAST ELEVATIONPlans · PDF23 Feb 2026View
THIRD FLOOR PLANPlans · PDF23 Feb 2026View
FIRE STATEMENTSupporting Docs · PDF23 Feb 2026View
TRANSPORT ASSESSMENTTransport Statement · PDF23 Feb 2026View
FLOOD RISK ASSESSMENTSupporting Docs · PDF23 Feb 2026View
FLOOD RISK ASSESSMENTSupporting Docs · PDF23 Feb 2026View
FLOOD RISK ASSESSMENTSupporting Docs · PDF23 Feb 2026View
LANDSCAPING DETAILSPlans · PDF23 Feb 2026View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF23 Feb 2026View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF23 Feb 2026View
PROPOSED ELEVATIONSPlans · PDF23 Feb 2026View
ARBORICULTURAL ASSESSMENT STATEMENT AND METHOD STATEMENTSupporting Docs · PDF23 Feb 2026View
BAT SURVEY REPORTSupporting Docs · PDF23 Feb 2026View
FLOOD RISK ASSESSMENTSupporting Docs · PDF23 Feb 2026View
TREE SURVEYPlans · PDF23 Feb 2026View
CONTEXT ELEVATION AAPlans · PDF23 Feb 2026View
ROOF PLANPlans · PDF23 Feb 2026View
PLANNING STATEMENTPlanning Statement · PDF23 Feb 2026View
PROPOSED DRAWINGSPlans · PDF23 Feb 2026View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF23 Feb 2026View
NOISE IMPACT ASSESSMENTSupporting Docs · PDF23 Feb 2026View
SUDS SUPPORTING INFORMATIONSupporting Docs · PDF23 Feb 2026View
PROPOSED NORTH ELEVATIONPlans · PDF23 Feb 2026View
PROPOSED SOUTH ELEVATIONPlans · PDF23 Feb 2026View
SECOND FLOOR PLANPlans · PDF23 Feb 2026View
GROUND FLOOR PLANPlans · PDF23 Feb 2026View
TREE PROTECTION PLANPlans · PDF23 Feb 2026View
COMMUNITY USE MANAGEMENT PLANSupporting Docs · PDF23 Feb 2026View
OTHER RELEVANT INFORMATIONSupporting Docs · PDF23 Feb 2026View
CONTEXT ELEVATION BBPlans · PDF23 Feb 2026View
FIFTH FLOOR PLANPlans · PDF23 Feb 2026View
FOURTH FLOOR PLANPlans · PDF23 Feb 2026View
ENERGY AND SUSTAINABILITY STATEMENTSupporting Docs · PDF23 Feb 2026View
GROUND FLOOR PLANPlans · PDF23 Feb 2026View
FLOOD RISK ASSESSMENTSupporting Docs · PDF23 Feb 2026View
PRELIMINARY ECOLOGICAL APPRAISALSupporting Docs · PDF23 Feb 2026View
SOUTH ELEVATION RENDERED VIEWPlans · PDF23 Feb 2026View
PROPOSE NORTH AND EAST ELEVATIONSPlans · PDF23 Feb 2026View
BLOCK PLAN OF THE SITEPlans · PDF23 Feb 2026View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF23 Feb 2026View
PRELIMINARY ECOLOGICAL APPRAISALSupporting Docs · PDF23 Feb 2026View
PRELIMINARY ECOLOGICAL APPRAISALSupporting Docs · PDF23 Feb 2026View
PROPOSED SOUTH AND WEST ELEVATIONPlans · PDF23 Feb 2026View
PROPOSED SECTIONS AA AND BBPlans · PDF23 Feb 2026View
THE LOCATION PLANOS Map · PDF23 Feb 2026View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF23 Feb 2026View
DAYLIGHT OR SUNLIGHT ASSESSMENTSupporting Docs · PDF23 Feb 2026View
FLOOD RISK ASSESSMENTSupporting Docs · PDF23 Feb 2026View
LANDSCAPING DETAILSPlans · PDF23 Feb 2026View
PROPOSED WEST ELEVATIONPlans · PDF23 Feb 2026View
FIRST FLOOR PLANPlans · PDF23 Feb 2026View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF23 Feb 2026View
PROPOSED DRAWINGSPlans · PDF23 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.